1761 1 Avenue is an elevator apartment building built in 2007 in Manhattan, 10128. It has 110 residential units across 32 floors. The owner of record is NYC Educational Construction Fund. HPD has recorded 3 housing violations here, most recently on June 11, 2025. 3 of the 3 most recent violations are still open.

HPD violations
3
DOB violations
71
ECB violations
90
HPD complaints
3

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jun 11, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 3

  • B

    Provide adequate supply of cold water for the fixtures at the shower stall in the 1st bathroom from north located at apt 19d, 19th story, 1st apartment from south at west

    Jun 11, 2025 · Apt 19D

    Open — Nov sent out
  • B

    Provide adequate supply of hot water for the fixtures at the shower stall in the 1st bathroom from north located at apt 19d, 19th story, 1st apartment from south at west

    Jun 11, 2025 · Apt 19D

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Jun 11, 2025

    Open — Nov sent out

DOB building violations · 71

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 21, 2019

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
Show 40 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 18, 2017

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 14, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 14, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 14, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 14, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 14, 2016

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2014 inspection/test

    Jun 10, 2015

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2014 inspection/test

    Jun 10, 2015

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 16, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 22, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 22, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 22, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2011

    Dob violation - resolved
  • Site safety none

    Cs-site safety none

    Nov 19, 2009

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    C-construction other optional

    Dec 14, 2008

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 30, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Nov 3, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed

ECB violations · 90

  • Class - 2

    28-317.3 failure to register cooling tower. rmdy: comply w/code.

    Sep 21, 2015

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments - job #121025611 dated 4.18.12. noted: washer & dryer found in powder room closet not shown on plan.remedy:conform to approved

    May 23, 2012

    Resolve
  • Class - 2

    Partial obstruction. at 1st flr corridor w/computer cart w/power hook-up. remedy: remove item, maintain corridor width clear.

    Jun 8, 2011

    Resolve
  • Class - 1

    Failure to safeguard all perons and property affected by construction operations. noted: at time of inspection at above active site bldg up to the roof construction work in progress. observed approx 20' section

    Dec 7, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. bc 3310 failure to follow site safety program. noted: sidewalk shed at exp. # 1 under pmt. # 110482488. shed has been partially removed& there is an approx. 2' gap @ same exp. there has been np prior dob /

    Dec 7, 2009 · Penalty $1,600

    Resolve
  • Class - 2

    Fail to safeguard public property affected by const operation note:@ time of insp @ above active site bldg complete to roof observed from flrs (16to 1) nthere is no numbers in the staircase to determine what fl

    Nov 19, 2009 · Penalty $1,200

    Resolve
  • Class - 1

    Wrk w/o permit note:@ time of insp @ above active site bldg complete to the roof construction wrk in progress observed pipe scaffold approx 8ft in height erected @ the fence of the parapit wall on the roof @ ex

    Nov 19, 2009 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations. noted: upon inspection at above active construction site building up to roof level & construction work in progress. as reported

    Nov 5, 2009 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to perform a safe/proper inspection of suspended scaffold. noted: column wraps for tie backs have only 3 fist grips, no protection of sharp edges, excessive slack in tie backs and outrigger beams not

    Oct 30, 2009 · Penalty $10,000

    Resolve
  • Class - 1

    Work does not conform to approved construction documents or approved amendments. noted: approved cd-5 shows at exp 1, two opposing tie backs from rear of beam there is only one, exp 3 shows tiebacks to parapet

    Oct 30, 2009 · Penalty $1,000

    Resolve
Show 40 more ↓
  • Class - 1

    Sec bc3314.42 failure to maintain suspended scaffold as per code upon insp noted suspended scaffolding in use on exp2 of the bldg workers working on the scaffold also noted no softner provided around the lifeli

    Sep 10, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to provide handrail upon insp construction of nb in progress at time of of insp noted handrail missing in stairway from roof to machine room rem: provide handrail

    Sep 10, 2009 · Penalty $1,000

    Resolve
  • Class - 2

    Work does not conform to approved plan upon inspection const of nb in progress at time of inspection noted side walkshed erected along exp 1 & 2 of jobsite also noted cross bracings not installed or missing in

    Sep 2, 2009

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations: upon inspection as noted on active construction site up to 33rd flr roof observed recent smoking refuse in violation of nyc fire

    Jun 10, 2009 · Penalty $1,200

    Resolve
  • Class - 2

    Sec. 3307.4 27-1023 vehicular traffic,warning signs & lights. upon inspection as note on construction site up to 33rd roof level on the 92ndstreet side of job site there were a row of barricades blocking 1 lane

    Jun 10, 2009 · Penalty $800

    Resolve
  • Class - 2

    Failure to safeguard all persons and property affected by constructionoperations: upon inspection as noted on active construction site up to32nd flr there were cigarette butts empty cartons on many flrs through

    May 28, 2009 · Penalty $1,200

    Resolve
  • Class - 2

    Failure to provide required vertical netting upon inspection on activejob site up to 32nd flr as noted: there were holes in the vertical netting and in some locations i did not meet columns by apprx 10" this

    May 28, 2009 · Penalty $800

    Resolve
  • Class - 1

    Failure to institute and maintain safety equipment or temp construction no toeboards upon inspection on active construction site up to 32nd flr there were no toe boards next to the hoist ramps on the top flrs

    May 28, 2009 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to safeguard all persons and property affected by constructionoperations. observed recent smoking refuse w/i construction site in violation of nyc fc 1404.1. smoking refuse observed near and around the

    May 19, 2009 · Penalty $1,200

    Resolve
  • Class - 1

    Sec. 3313.1;27-1069. improper storage and handling of combustible, compressed gases. noted: at time of inspection, bldg constructed to a height of approx 40'. observed 3 tanks of combustible, compressed gases

    May 19, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Work w/o a permit.upon inspection as noted on active job site up to 32fl there is an outrigger platform scaffold being erected on the roof top.there is no permit or approved stamped drawings on site upon inspec

    Apr 29, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to institute & maintain safety equipment measures or temporaryconstruction.no toe boards.upon inspection on active construction siteup to 32fl as noted:there were no toe boards on the masons scaffolding

    Apr 29, 2009 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations.upon inspection as noted on active construction site up to 32fl the mason's are washing out their.cement mixer on the 92nd st side

    Apr 29, 2009 · Penalty $1,200

    Resolve
  • Class - 2

    Sec. 3301.2;27-1009a. failure to institute/maintain safety equipment measures or temporary construction: holes in flr. upon inspection as noted on active construction site up to 32nd flr. there were holes of

    Apr 28, 2009

    Resolve
  • Class - 2

    Sec. 3308.1;27-1022. failure to provide required vertical netting: upon inspection as noted: on active job site up to 32nd flr there were many locations throughout the entire bldg were the nets did not meet the

    Apr 28, 2009 · Penalty $800

    Resolve
  • Class - 1

    Sec. 3303.4.5.1;27-1018(b). storage of material during construction: upon inspection as noted on active construction site up to 32nd flr. there were black iron pipe varying in dia from approx 2"-9". stacked w/i

    Apr 28, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Storage of material during construction operations inspection as notedon active construction site up to 32 flr. there are metal strips and tubular aluminum gang boxs and packing crates stored w/in 10ft of the

    Apr 9, 2009 · Penalty $400

    Resolve
  • Class - 2

    Failure to safeguard all person and property affected by construction operations: upon inspection as noted: on active construction site up to 32nd flr there were cigarette butts and smoking refuse throughout

    Apr 9, 2009 · Penalty $1,200

    Resolve
  • Class - 2

    Failure to provide required vertical netting upon inspection as noted on active construction site up to 32nd flr. the vertical nets had beenremoved and left unattended. on the 31st flr in other location on flr

    Apr 9, 2009 · Penalty $400

    Resolve
  • Class - 1

    Failure to institute and maintain safety equipment measures or temp construction. no toe boards upon inspection as noted: on active construction site up to 32nd flr the 0 cable on the 31st flr had been removed

    Apr 9, 2009 · Penalty $1,000

    Resolve
  • Class - 2

    Section 3301.2 27-1009(a) failure to institute & maintain safety equipement measures or temporary construction holes in floor: upon inspection as noted on active construction site up to 32nd flr. there were hol

    Apr 9, 2009 · Penalty $400

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements: upon inspection. as noted: on active construction site up to 32flr therewas an excessive amount of debris and discarded bldg and masonry rubbl

    Apr 9, 2009 · Penalty $800

    Resolve
  • Class - 2

    Failure to safeguard all persons and property affected by constructionoperations upon inspection as noted on an active construction site up to 32 flr a carpenter working on the 25 flr fell from a 4ft ladder

    Apr 9, 2009 · Penalty $1,200

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations. recent smoking refuse observed in construction site in violation of nyc fire code 1404. smoking refuse observed on 3rd fl area

    Apr 1, 2009 · Penalty $1,200

    Resolve
  • Class - 1

    Sec. bc 3307.6.2. failure to protect sidewalk for the entire width by providing sidewalk shed. at the time of inspection the structure is upto roof level. exterior brick, windows etc works in progress. at south

    Apr 1, 2009 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations. at time time of inspection as reported by site safety manager,a worker fell from a 6' high 'a' frame ladder to the flr. he was ta

    Mar 20, 2009

    Resolve
  • Class - 2

    Failure to safeguard all persons and property affected by constructionoperations. observed recent smoking refuse w/i construction site in vio of nyc fire code 1404.1 smoking refuse observed on cellar, 1st fl &

    Mar 5, 2009 · Penalty $3,000

    Resolve
  • Class - 2

    Failure to post dot permit for sidewalk closing. at the time of inspection sidewalk along 91st street was closed due to construction activity by providing barricade on sidewalk. no dot permit posted for

    Mar 5, 2009 · Penalty $500

    Resolve
  • Class - 2

    Sec bc 3308.3 misc viol: vertical safety netting damaged. safety netting is not per required height. at the time of insp observed vertical netting damaged & displaced on 3rd,4th & 5th fl. zero cable is missing

    Feb 23, 2009 · Penalty $800

    Resolve
  • Class - 2

    Failure to safeguard all persons and property affected by constructionoperations. recent smoking refuse within construction site in viol of nyc fc 1404.1 smoking refuses observed on cellar floor near contractor

    Feb 23, 2009 · Penalty $1,200

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations. observed recent smoking refuse w/i construction site in violation of nyc fire code 1404.1 smoking refuse observed near contractor

    Feb 2, 2009 · Penalty $1,200

    Resolve
  • Class - 1

    Sec. bc3303.4 & 27-1018 failure to maintain adequate housekeeping at the time of inspection structure up to roof level. on 33rd flr material stored blocking walkway. on 1st flr concrete block in front of stair

    Feb 2, 2009

    Resolve
  • Class - 1

    Failure to provide standpipe at required height in construction at the time of inspection bldg up to top fl level poured stripping operationin progress on 33 & 34 fl mech.fl top most standpipe outlet provided

    Jan 22, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to comply w/nyc fire code in construction site at the time of inspection on 32 & 33 fl salamanders are being used for temporary heating woods are being used to generate fire which making open fire no

    Jan 22, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to provide overhead protection for 32 fl setback & hoist landing area at the time of inspection on 32 fl hoist lands on a open setback where the upper fls concrete form stripping operation is in progres

    Jan 22, 2009 · Penalty $1,600

    Resolve
  • Class - 2

    Sec bc 3301.7 misc viol: design drawing required at time of inspectiona platform on 32nd fl fronting is are btw 91 & 92 st approx 3'x 4' constructed of wood extends from bldg. contractors used this platform as

    Jan 14, 2009

    Resolve
  • Class - 2

    Fail to safeguard all persons and property affected by const ops: observed recent smoking refuse within construction site in violation of nyc fire code 1404.1 smoking refuse observed on hoist platform on grou

    Jan 14, 2009 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operation. as noted: upon inspection at above active construction. during crane jump (add 2 sections) while worker was using hammer - sledge

    Nov 22, 2008

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction.no hand rails.as noted:at time of inspection at above active construction site bldg up to 22fl & stairs poured up to 21fl.there

    Nov 11, 2008 · Penalty $1,000

    Resolve
  • Class - 2

    Work without a permit. as noted: at time of inspection at above activeconstruction site hoist platform (runway) erected from 6th fl up to 16th fl at east elevation of job site. there is no permit available as p

    Oct 27, 2008

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Jun 10, 2025 · Apt 19D

    Close
  • Heat/hot water

    Apartment only

    Dec 26, 2014 · Apt B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 15, 2014 · Apt BLDG

    Close

Sales history

DatePriceTypeUnits
Jun 17, 2026$1,600,000Coops - elevator apartments—
May 28, 2026$1,260,000Coops - elevator apartments—
Feb 12, 2026$1,500,000Coops - elevator apartments—
Nov 24, 2025$1,550,000Coops - elevator apartments—

Building details

Building type
Elevator apartment building (D4)
Year built
2007
Floors
32
Residential units
110
Building area
244,249 ft²
Lot area
10,000 ft²
Zoning
C2-8
Community board
108
Council district
5
Block / lot
1554 / 23
Assessed value
$42,638,400
Landmark / historic district
No

HPD registration #143338, last renewed Oct 30, 2025.

Questions about 1761 1 Avenue

Who owns 1761 1 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is NYC Educational Construction Fund.

Does 1761 1 Avenue have violations?

Yes. NYC HPD has recorded 3 housing violations at this property.

Is 1761 1 Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1761 1 Avenue built?

City records list 2007 as the year it was built.

How many apartments are in 1761 1 Avenue?

It has 110 residential units and 111 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.