214 East 90 Street
Manhattan, NY 10128BBL 1-01535-0039Map
Owner of record: 214 East 90th Assoc
214 East 90 Street is a walk-up apartment building built in 1910 in Manhattan, 10128. It has 16 residential units across 5 floors. The owner of record is 214 East 90th Assoc. HPD has recorded 15 housing violations here, most recently on October 16, 2017. 4 of the 15 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 15
- DOB violations
- 5
- ECB violations
- 4
- HPD complaints
- 15
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 15
- BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum of 100 watts as required(light fixture(s) present). at front areaway
Oct 16, 2017
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required (light fixtures present)
Jul 16, 2013
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimun of 100 watts required
Aug 2, 2007
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story
Sep 28, 2006
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 28, 2006
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 28, 2006
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Sep 28, 2006
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Nov 26, 2004 · Apt BLDG
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar.
Sep 13, 1999
Open — Not complied with - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor 2 sty east apt 2e kitchen 5119 er1. , section '' ''
Jul 15, 1998 · Apt 2E
Closed — Violation dismissed
Show 5 more ↓
- BHazardous
Replace with new the missing windows frames at cellar front east and west.
Jun 15, 1998
Open — Not complied with - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color loose & unkeyed ceiling at front room 2 sty east apt 2e er1. , section '' ''
May 1, 1991 · Apt 2E
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color loose & unkeyed ceiling at bathroom 2 sty east apt 2e er1. , section '' ''
May 1, 1991 · Apt 2E
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color loose & unkeyed wall at west bathroom 2 sty east apt 2e er1. , section '' ''
May 1, 1991 · Apt 2E
Closed — Violation dismissed - BHazardous
Replace the broken or defective washbasin bathroom 5 sty rear west apt 5w. , section '' ''
Apr 4, 1991 · Apt 5W
Open — Nov sent out
DOB building violations · 5
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - active - Construction other optional
C-construction other optional
May 29, 1991
Vp-violation unserved ecb-active
ECB violations · 4
- Non-hazardous
Failure to maintain: defect is incomplete interior renovation of apartment 5w 5th fl. west side. open & exposed wiring, floor not finished (rough ply wood only), sheet rock not finished & not primed. (painted.)
May 29, 1991 · Penalty $1,000
Active - Non-hazardous
Altered building occupied without a valid c of o.
Feb 26, 1990 · Penalty $250
Active - Unknown
Failure to provide approved plans @ premises for alteration #1298/88 @ time of inspection remedy provide approved plans @ premises
Aug 30, 1989 · Penalty $50
Resolve - Non-hazardous
Failure to provide approved set of plans at premises at time of inspection. remedy: provide approved set at premises during construction.
Apr 11, 1989 · Penalty $500
Resolve
Complaints
- Heat/hot water
Entire building
Oct 14, 2018 · Apt 1WR
Close - Heating
Heat related
Feb 12, 2014 · Apt NA
Close - Paint/plaster
Ceiling
Sep 15, 2006 · Apt 1WR
Close - General
Doors
Sep 9, 2006 · Apt 5ER
Close - Paint/plaster
Wall
Nov 7, 2004 · Apt BLDG
Close - General
Stairs
Nov 7, 2004 · Apt BLDG
Close - Plumbing
Water supply
Jan 16, 2004 · Apt 5W
Close - Heating
Heat related
Jan 16, 2004 · Apt 5W
Close - Heating
Radiator
Dec 8, 2003 · Apt 2W
Close - General
Windows
Jun 20, 2003 · Apt 2W
Close
Show 5 more ↓
- General
Windows
Jun 20, 2003 · Apt 2W
Close - Plumbing
Toilet
Jun 20, 2003 · Apt 2W
Close - Plumbing
Shower-stall
Jun 20, 2003 · Apt 2W
Close - General
Doors
Jun 20, 2003 · Apt 2W
Close - Paint/plaster
Wall
Jun 20, 2003 · Apt 2W
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1910
- Floors
- 5
- Residential units
- 16
- Building area
- 8,825 ft²
- Lot area
- 2,517 ft²
- Zoning
- R8B
- Community board
- 108
- Council district
- 5
- Block / lot
- 1535 / 39
- Assessed value
- $890,100
- Landmark / historic district
- No
HPD registration #106178, last renewed Aug 27, 2025.
Questions about 214 East 90 Street
Who owns 214 East 90 Street?
The owner of record in NYC Department of City Planning PLUTO data is 214 East 90th Assoc.
Does 214 East 90 Street have violations?
Yes. NYC HPD has recorded 15 housing violations at this property.
Is 214 East 90 Street rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 19% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 214 East 90 Street built?
City records list 1910 as the year it was built.
How many apartments are in 214 East 90 Street?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.