228 East 84 Street
Manhattan, NY 10028BBL 1-01529-0034Map
Owner of record: 228 East 84 Realty Associates LLC
228 East 84 Street is a walk-up apartment building built in 1925 in Manhattan, 10028. It has 16 residential units across 4 floors. The owner of record is 228 East 84 Realty Associates LLC. HPD has recorded 18 housing violations here, most recently on June 4, 2025. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 18
- DOB violations
- 8
- ECB violations
- 5
- HPD complaints
- 84
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 18
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective electrical outlet at south wall in the 1st room from north located at apt 4c, 4th story, 1st apartment from south at west
Aug 24, 2021 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
Aug 24, 2021 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
Aug 24, 2021 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 4c, 4th story, 1st apartment from south at west
Aug 24, 2021 · Apt 4C
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 24, 2021
Closed — Violation dismissed - BHazardous
Replace the broken or defective wash basin in the bathroom located at apt 4c, 4th story, 1st apartment from south at west
Aug 24, 2021 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling ,south & east walls in the bathroom located at apt 2b, 2nd story, 2nd apartment from south at west , section at southwest
Aug 13, 2012 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the bathroom located at apt 2b, 2nd story, 2nd apartment from south at west , section at southwest
Aug 13, 2012 · Apt 2B
Closed — Violation dismissed
Show 8 more ↓
- BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Aug 13, 2012
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 13, 2012
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector imporpely installing in the entire apartment located at apt 2b, 2nd story, 2nd apartment from south at west , section at west
Aug 13, 2012 · Apt 2B
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items (plate...) at 2nd sty balcony ,front north at fire escape
Aug 13, 2012
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing -broken channel supporting beam near by building front exterior wall below 2nd sty balcony,front north at fire escape
Aug 13, 2012
Closed — Violation closed - ANon-hazardous
Remove device preventing door from being self-closing (push stopper) at building door from vestibule to 1st sty public hall
Aug 13, 2012
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Jul 6, 2011 · Apt 1B
Closed — Violation dismissed - BHazardous
D26-10.01 adm code replace with new the missing cover for sewer trap cellar front east.
May 15, 1984
Closed — Violation dismissed
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 3, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 19, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 19, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 19, 2013
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 6, 2008
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed
ECB violations · 5
- Class - 1
Bc3309.10 failure to provide adjacent bldg, skylight and roof with protection, during const at the time of my inspection, approx 6 workers on site. i observed const, work in progress above adjacent bldg 232 e.
Apr 4, 2013 · Penalty $8,000
Resolve - Class - 1
Use of supported scaffold w/o a scaffoldd user certificate at the timeof my inspection approx 6 worker on site. i observed a supported pipe scaffold was erected and worker on top laying blocks. on request for
Mar 21, 2013 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons and property affected by alterations operation. at the time of my inspection. i observe on the roof of 5 stybldg under const workers using a makeshift pully in danger of falling
Mar 21, 2013 · Penalty $2,400
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temp construction - no guard rails. at the time of my inspection approx 6 workerson site. i observed a pipe scaffold erected on the 5th flr of const,
Mar 21, 2013 · Penalty $1,200
Resolve - Non-hazardous
B4a 28a.32a.50.50a.50b.50c.50d.50e.50f.50g.50h.50i.50j.50k 50 oil tankexposed not vaulted 50a anti syphon valve in wrong location 50b missing shut off valve on oil line at tank 50c oil lines not supported 50d
Apr 30, 2008 · Penalty $350
Resolve
Complaints
- Plumbing
Water supply
Dec 1, 2025 · Apt 2B
Close - Water leak
Slow leak
Sep 11, 2023 · Apt 5B
Close - Paint/plaster
Ceiling
Sep 11, 2023 · Apt 5B
Close - Unsanitary condition
Pests
Apr 17, 2023 · Apt 4A
Close - Unsanitary condition
Pests
Mar 31, 2023 · Apt 4A
Close - Unsanitary condition
Pests
Oct 19, 2022 · Apt 3D
Close - Water leak
Damp spot
Jun 10, 2021 · Apt 4C
Close - Paint/plaster
Wall
May 9, 2021 · Apt 4C
Close - Heat/hot water
Entire building
Apr 21, 2021 · Apt 4C
Close - Door/window
Window frame
Apr 21, 2021 · Apt 4C
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 8, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 31, 2017 · Apt BLDG
Close - Flooring/stairs
Floor
Jan 2, 2015 · Apt 1B
Close - Heating
Heat related
Nov 14, 2013 · Apt 4C
Close - Nonconst
Janitor/super
Aug 9, 2012 · Apt 2B
Close - General
Mold
Aug 9, 2012 · Apt 2B
Close - Plumbing
Water-leaks
Aug 9, 2012 · Apt 2B
Close - Paint/plaster
Ceiling
Aug 9, 2012 · Apt 2B
Close - Plumbing
Water-leaks
Aug 3, 2012 · Apt 2B
Close - Plumbing
Toilet
Aug 3, 2012 · Apt 2B
Close - Heating
Heat related
Dec 24, 2010 · Apt 2B
Close - Paint/plaster
Ceiling
Aug 19, 2010 · Apt 2B
Close - Nonconst
Vermin
Aug 19, 2010 · Apt 2B
Close - Electric
Lighting
Jul 23, 2010 · Apt 3A
Close - General
Locks
Jul 23, 2010 · Apt 3A
Close - Plumbing
Basin/sink
Jul 23, 2010 · Apt 3A
Close - Paint/plaster
Ceiling
Jul 23, 2010 · Apt 3A
Close - Paint/plaster
Ceiling
Jul 23, 2010 · Apt 3A
Close - Paint/plaster
Ceiling
Jul 23, 2010 · Apt 3A
Close - Paint/plaster
Ceiling
Jul 8, 2010 · Apt 3A
Close - Electric
Wiring
Jun 28, 2010 · Apt 1B
Close - Plumbing
Water-leaks
Jun 1, 2010 · Apt 2B
Close - Paint/plaster
Ceiling
Jun 1, 2010 · Apt 2B
Close - Paint/plaster
Ceiling
Jun 1, 2010 · Apt 2B
Close - Paint/plaster
Ceiling
Jun 1, 2010 · Apt 2B
Close - Heating
Heat related
Oct 28, 2009 · Apt 2B
Close - Heating
Heat related
Oct 23, 2008 · Apt 2B
Close - General
Cooking gas
Oct 23, 2008 · Apt 2B
Close - Heating
Heat related
Aug 26, 2008 · Apt 3A
Close - Appliance
Electric/gas range
Aug 1, 2008 · Apt 3A
Close - Plumbing
Toilet
Aug 1, 2008 · Apt 3A
Close - Plumbing
Water-leaks
Aug 1, 2008 · Apt 3A
Close - General
Doors
Aug 1, 2008 · Apt 3A
Close - General
Cooking gas
Jul 9, 2008 · Apt 3A
Close - Paint/plaster
Ceiling
May 1, 2008 · Apt 2B
Close - Heating
Heat related
May 1, 2008 · Apt 2B
Close - Heating
Heat related
Mar 31, 2008 · Apt 3A
Close - Heating
Heat related
Mar 31, 2008 · Apt 3A
Close - Heating
Heat-plant
Mar 31, 2008 · Apt 3A
Close - Plumbing
Water-leaks
Mar 14, 2007 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1925
- Floors
- 4
- Residential units
- 16
- Building area
- 7,740 ft²
- Lot area
- 3,456 ft²
- Zoning
- R8B
- Community board
- 108
- Council district
- 5
- Block / lot
- 1529 / 34
- Assessed value
- $1,641,150
- Landmark / historic district
- No
HPD registration #135673, last renewed Jul 27, 2026.
Questions about 228 East 84 Street
Who owns 228 East 84 Street?
The owner of record in NYC Department of City Planning PLUTO data is 228 East 84 Realty Associates LLC.
Does 228 East 84 Street have violations?
Yes. NYC HPD has recorded 18 housing violations at this property.
Is 228 East 84 Street rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 13% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 228 East 84 Street built?
City records list 1925 as the year it was built.
How many apartments are in 228 East 84 Street?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.