1065 Park Avenue
Manhattan, NY 10128BBL 1-01516-0001Map
Owner of record: 1065 Park Avenue Corp
1065 Park Avenue is an elevator apartment building built in 1973 in Manhattan, 10128. It has 106 residential units across 30 floors. The owner of record is 1065 Park Avenue Corp. HPD has recorded 10 housing violations here, most recently on October 22, 2024.
- HPD violations
- 10
- DOB violations
- 69
- ECB violations
- 43
- HPD complaints
- 17
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 10
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hopper door at compactor closet at public hall, 9th story
Oct 22, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on compactor closet door at public hall, 12th story
Oct 22, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door at public hall, 9th story
Oct 22, 2024
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tile at north wall in the kitchen located at apt 10d, 10th story, 1st apartment from north at east
Sep 25, 2014 · Apt 10D
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures at bath tub in the bathroom located at apt 10d, 10th story, 1st apartment from north at east
Sep 25, 2014 · Apt 10D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood flooring in the 2nd room from north located at apt 10d, 10th story, 1st apartment from north at east
Sep 25, 2014 · Apt 10D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood flooring in the 1st room from north at east located at apt 10d, 10th story, 1st apartment from north at east
Sep 25, 2014 · Apt 10D
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets hot water at sink in the kitchen located at apt 10d, 10th story, 1st apartment from north at east
Sep 25, 2014 · Apt 10D
Closed — Violation dismissed - BHazardous
D26-10.01, 10.05 adm code arrange and make self-closing the doors hopper of incinerator compartment at east fire stair 3 12 15 19 28 stys.
Oct 20, 1997
Closed — Violation dismissed - BHazardous
D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color north wall of north west fire stairs 13 to 29 stys.
Oct 20, 1997
Closed — Violation dismissed
DOB building violations · 69
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - Plumbing none
The dob intends to revoke all approvals and permits under plumbing job #123121308 due to suspension of master plumbers license. stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit
Nov 8, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 21, 2018
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 13, 2018
Dob violation - dismissed - Plumbing none
The borough commissioner has issued a notice to revoke laa #140232727 due to revocation of the master plumber's and/or fire suppression license. all work in connection with this application has been ordered stopped immediately
Jan 18, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2017
Dob violation - resolved
Show 40 more ↓
- Construction other optional
The borough commissioner has ordered all work stopped for application/ permit #122885048 for intent to revoke approvals and permit. stop all work immediately and make the site safe
Aug 16, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 19, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Feb 7, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
This pvt replaces pvt 522880
Oct 8, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2014
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 26, 2013
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2012
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 13, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 13, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 13, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 25, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 25, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 25, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 7, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 7, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 7, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 31, 2003
Dob violation - resolved
ECB violations · 43
- Class - 2
No records or dob notifications were found on file for the removal of the suspended scaffold.during walkthrough it was observed that the scaffold had been removed; up on further review of dob now &bis internet
May 2, 2026 · Penalty $800
Active - Class - 2
Suspended scaffolds installed contrary to plans-anchorage angles for lifelines/tiebacks installed horizontal instead of vertical,anchor bolts installed 11",11.5",12"-plans call for 10"between bolts, stirrup ins
Sep 5, 2025 · Penalty $625
Resolve - Class - 2
At the time of inspection observed 3 outrigger beams suspended scaffolds installed on site/in use/raised from ground-upon checking dob records no notification prior to installation(24h prior but no more than 48
Sep 5, 2025 · Penalty $2,500
Resolve - Class - 2
Work contrary to site safety plan// sidewalk shed not extended 20' to adjoining property at exp#4(work on corner of building occurring).trees on sidewalk not protected on exposure 1&4,at exp#3 roof of adjoining
Sep 5, 2025 · Penalty $625
Active - Class - 2
Pedestrian protection does not comply to building code , i observed storage on top of sidewalk shed(not on design drawings of shed) , observed catchall installed on top of parapet of shed at exp#4(not on plans)
Sep 5, 2025 · Penalty $2,400
Active - Class - 3
Work without a permit. noted: temporary construction fence at exp-1 and exp-4 has been erected to enclose work being performed at sidewalk. no permits on file., obtain permit or restore premises to prior legal
Apr 7, 2022 · Penalty $500
Resolve - Class - 2
27-625/violation of condition on as of right privatley owner public space at time of inspction noted:(5)masonry fountain/planters being added to plaza at park ave.and 87 st locations of plaza as per pops#m08004
Jun 25, 2019 · Penalty $5,000
Resolve - Class - 1
1rcny-3310-01 qualified person for facade job.a qualified person who meets the requirement must be present at the site during all times active work occurring.noted:at time of inspection,i observed active site f
Jun 20, 2019
Resolve - Class - 1
Bc 3301.2 failure to institute and maintain all safety measures requi red by this chapter.noted:at time of inspection,i observed active sitefor which a ssm is required/qssp with the skylight of bld.upper fl.not
Jun 20, 2019 · Penalty $2,500
Resolve - Class - 2
Built contrary to plan.all equipment must be installed as per cd/5 approved plan.noted:at time of inspection,i observed suspended outrigger boam scaffold in conjunction with c-hook that does not reflect on the
Jun 20, 2019 · Penalty $625
Resolve
Show 33 more ↓
- Class - 1
Bc 3303.9 failure to maintain required means of egress and other element in existing bld.noted; at time of inspection,i observed active sitewith the upper stair cases blocked,obstructed by const.material.contr
Jun 20, 2019
Resolve - Class - 2
Bc 3314-4-3 design/drawings for c-hook.drawings are to be on site at time of inspection.noted;at time of inspection,i observed c-hook suspended scaffold in place at exp#3 with no drawings for c-hook suspended
Jun 20, 2019 · Penalty $625
Resolve - Class - 1
Bc 3309.1 failure to adequately protect adjoining properties during construction operation.noted:at time of inspection,i observed active site with the adjacent property roof exp#2,inadequate protection,is missi
Jun 20, 2019 · Penalty $625
Resolve - Class - 2
Bc 3314-1 unsafe supported scaffold.all scaffold shall be erected & maintained so that the safety of public and property will not be endangerd by falling materials,tools or debris,or by collapse.noted:at time o
Jun 20, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35373311r issued on 01-16-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. unlawfully continued work while on notice of a stop work order.
Mar 30, 2019 · Penalty $3,125
Resolve - Class - 1
Work unlawfully continued work while on notice of a stop work order. noted: at time of inspection at 1st floor approximatelly 1600 squre feet of ceiling work 100% completed unlawfully against ecb violation
Jan 16, 2019 · Penalty $5,000
Resolve - Class - 2
Work without a permit. storage room ceiling repair project completed without construction permit. remedy: obtain permit
Oct 15, 2018
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#37006790l issued on 2/14/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.comply with commissioner'
May 24, 2018
Resolve - Class - 1
Bc3307.6.4:deficient design-the respondent,design applicant,failed to meet the reqs of bc3307.6.4 and bc1604.2 in a heavy duty sidewalk shed application filed under professionally certified job#140604727.sws st
Feb 14, 2018
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation #35245045r issued on 08/05/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit,at
Dec 26, 2017 · Penalty $400
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio #35245045r issued on 08/05/17 & to file a cert 0f correction pursuant to 28-201.2 &1rcny 102-01. for work w/out a permit @1st fl pop area plaza.rem:
Nov 11, 2017
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35245046z issued on 08/05/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to immediately no
Sep 13, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35245047k issued on 08/05/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain buil
Sep 13, 2017 · Penalty $800
Resolve - Class - 1
Work without a permit.noted:at 1st floor pop area plaza approximately 1600 sq feet of ceiling was framed and laminated without a permit at time of inspection.stop all plaza work except to make safe.rem:obtain p
Aug 5, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to immediately notify the dept of an accident at a construction site.noted:while working in the plaza(pop)are approx.1600 sq ft of the entire ceiling collapsed without a notification made to dob @ time
Aug 5, 2017 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building.noted:at 1st floor plaza(pop)area the entire ceiling collapsed at time of inspection.rem:repair replace maintain building.
Aug 5, 2017 · Penalty $1,000
Resolve - Class - 1
Failure to take and provide safety measure such as sidewalk shed,netting,etc where require to protect and secure public safety from documented unsafe facade as per 1rcny 103-04. facade fisp3 filed unsafe compl
Jan 27, 2017 · Penalty $2,400
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Apr 28, 2014 · Penalty $800
Resolve - Class - 2
Sec. 105.8.2 temporary construction equipment on site-expired permit-sidewalk shed permit expired as of 4/1/12-fasade work in progress. remedy: renew permit.
Apr 2, 2012
Resolve - Class - 1
Failure to have site safety manager or coordinator present as required: 2 men working on elevation, 2 from suspended scaffolding - no site safety manager or log- 2 other men said to be supervisors did not have
Mar 12, 2012 · Penalty $1,200
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. noted:no approved plans on site for installation of stair tower at exposure #1. rem:provide plans.
Jan 12, 2012
Resolve - Class - 2
3314.4.3:inspection:all scaffolds except for suspended scaffolds shallbe inspected daily before each use by a competent person. noted:no daily record of inspection for supported scaffold at exposure on 1-12-12.
Jan 12, 2012
Resolve - Class - 2
Failed to notify dept/obtain permit prior to use/inst off outrigger beams in connection with suspended scaffold. noted:no outrigger beam notification made for suspended scaffold. noted:no outrigger beam notific
Jan 12, 2012 · Penalty $400
Resolve - Class - 2
3314.4.1:installation:upon completion of the installation of the scaffold an inspection report verifying that the scaffold has been installed in accordance with the design drawings. noted:no sign off letter on
Jan 12, 2012 · Penalty $400
Resolve - Class - 2
Sec 2801.1 & 27-860 misc viol: fail to install mechanical system in accorandance with nyc mechanical code. chimney of adjoining five story property has not been altered to controlled with the requirements of 2
Oct 15, 2010
Resolve - Class - 2
Failure to maintain defective fluted concrete masonry wall on exposure#2 (north elevation).debris from wall found on adjacent roof of #1069 park ave.excessive masonry patch repairs,cracks,& spalling.submit an a
Sep 16, 2010 · Penalty $5,000
Resolve - Class - 2
Fail to maintain bldg walls or appurtenances. at exp 2 left side of bldg, pieces of cement exterior wall found on roof of 1067 park ave. remedy: maintain exterior wall
Apr 15, 2010 · Penalty $500
Resolve - Non-hazardous
75b,-perform 5 year test
Jun 20, 1997
Resolve - Non-hazardous
75b- perform 5 year test.
Jun 20, 1997
Resolve - Non-hazardous
03r for new cab. #03 remove illegal material, that is covering the elev. cab walls. (draperie)
Jul 12, 1991
Resolve - Non-hazardous
03r for new cab. #03 remove illegal material, that is covering the elev. cab walls. (draperie)
Jul 12, 1991
Resolve - Non-hazardous
73#. perform 5 year test and file.
Mar 5, 1991
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 certifyingto the installation of required fire protection systems. remedy: file report.
Oct 26, 1987 · Penalty $500
Resolve
Complaints
- Heat/hot water
Apartment only
Dec 5, 2025 · Apt 4D
Close - Heat/hot water
Apartment only
Dec 21, 2024 · Apt 4D
Close - Heat/hot water
Apartment only
Oct 21, 2023 · Apt 8D
Close - General
Mold
Dec 31, 2014 · Apt 10D
Close - General
Floor
Dec 31, 2014 · Apt 10D
Close - Plumbing
Bathtub/shower
Dec 31, 2014 · Apt 10D
Close - Plumbing
Basin/sink
Dec 31, 2014 · Apt 10D
Close - Unsanitary condition
Mold
Sep 11, 2014 · Apt 10D
Close - Plumbing
Bathtub/shower
Sep 11, 2014 · Apt 10D
Close - Plumbing
Bathtub/shower
Sep 11, 2014 · Apt 10D
Close
Show 7 more ↓
- Unsanitary condition
Mold
Sep 11, 2014 · Apt 10D
Close - Heating
Heat related
Jan 7, 2014 · Apt 10D
Close - Plumbing
Shower-stall
Dec 23, 2013 · Apt 10D
Close - Heating
Heat related
Oct 14, 2006 · Apt 25AB
Close - Heating
Heat related
Oct 14, 2006 · Apt 25AB
Close - Heating
Heat related
Oct 14, 2006 · Apt 25AB
Close - Heating
Heat related
Oct 14, 2006 · Apt 25AB
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 12, 2026 | $4,678,750 | Coops - elevator apartments | — |
| Jul 27, 2026 | $2,545,000 | Coops - elevator apartments | — |
| Jul 1, 2026 | $2,450,000 | Coops - elevator apartments | — |
| Jun 12, 2026 | $1,225,000 | Coops - elevator apartments | — |
| Jun 12, 2026 | $735,000 | Coops - elevator apartments | — |
| Jun 1, 2026 | $775,000 | Coops - elevator apartments | — |
| May 1, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Mar 26, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Jan 14, 2026 | $1,950,000 | Coops - elevator apartments | — |
| Dec 17, 2025 | Non-market transfer | Coops - elevator apartments | — |
| Dec 16, 2025 | $635,000 | Coops - elevator apartments | — |
| Dec 8, 2025 | Non-market transfer | Coops - elevator apartments | — |
| Dec 2, 2025 | Non-market transfer | Coops - elevator apartments | — |
| Sep 22, 2025 | $660,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1973
- Floors
- 30
- Residential units
- 106
- Building area
- 114,000 ft²
- Lot area
- 6,057 ft²
- Zoning
- R10
- Community board
- 108
- Council district
- 4
- Block / lot
- 1516 / 1
- Assessed value
- $14,447,700
- Landmark / historic district
- Park Avenue Historic District
HPD registration #139122, last renewed Jan 29, 2026.
Questions about 1065 Park Avenue
Who owns 1065 Park Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1065 Park Avenue Corp.
Does 1065 Park Avenue have violations?
Yes. NYC HPD has recorded 10 housing violations at this property.
Is 1065 Park Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1065 Park Avenue built?
City records list 1973 as the year it was built.
How many apartments are in 1065 Park Avenue?
It has 106 residential units and 109 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.