152 East 87 Street
Manhattan, NY 10128BBL 1-01515-0046Map
Owner of record: Allan Garage,
152 East 87 Street is an elevator apartment building built in 2018 in Manhattan, 10128. It has 56 residential units across 19 floors. The owner of record is Allan Garage,. HPD has recorded 4 housing violations here, most recently on October 9, 2018. City tax records listed 1 rent-stabilized apartment here in 2024.
- HPD violations
- 4
- DOB violations
- 83
- ECB violations
- 46
- HPD complaints
- 10
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 4
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 9, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2015
Closed — Violation dismissed
DOB building violations · 83
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2020
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 23, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed
Show 40 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 5, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 5, 2017
Dob violation - dismissed - Construction other optional
Owner to submit signed and sealed set of concrete formwork design, no later than 1/17/17
Jan 4, 2017
Dob violation - dismissed - Construction other optional
Borys hayda, eor, to submit complete and approved set of structural plans, no later than 01/17/17
Jan 4, 2017
Dob violation - dismissed - Construction other optional
Owner to submit complete and approved set of structural plans, no late r than 1/17/17
Jan 4, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Construction other optional
C-construction other optional
Dec 23, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 10, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 10, 2016
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2015
Mar 14, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 14, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 14, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 14, 2011
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 5, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 2, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 2, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Marquee other required
Cmq-marquee other required
Mar 20, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 22, 2006
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed
ECB violations · 46
- Class - 1
Failure to notify the department of na incident that resulted in a fatality or injury note one owkrer was installing door frame when part of the door fra eloosed and hit another worker on his head sustain cut a
Sep 11, 2019 · Penalty $1,250
Resolve - Class - 2
1rcny3319-01(9)2(i)(a)cranse plans do not show perminent features and actual site conditions required to be shown on these documents for crane use.while performing the pre layout inspection for the cranes requi
Apr 7, 2018 · Penalty $625
Resolve - Class - 2
Failure to maintain adequate housekeeping. note: @ time of insp a 19 story nb @ roof level. observed construction over other debris scattered on several flrs scattered @ various locations. this creates a potent
Jul 26, 2017 · Penalty $400
Resolve - Class - 1
Work w/out permit: note @ time of insp of a 19 story nb. a supported scaffold approx 48 ft right (8 sections) installed in elevator shaft in front a permit.stop all work in supported scaffold installed in eleva
Jul 26, 2017 · Penalty $1,600
Resolve - Class - 1
Bc3303.2.1 failure to take adequate measures to protect utilities.at tihe time of inspection it was observed that the contractor damaged coned power line while excavating to make connection for main power.the
Jun 2, 2017
Resolve - Class - 1
Sec. 3301.2 no overhead protection. at time of inspection at a 19 sty bldg under alteration w/concrete operations in process,at exp#1,main construction entrance does not have overhead protection to safeguard
Dec 23, 2016 · Penalty $1,600
Resolve - Class - 2
Sec. 3306.3 vertical safety netting inadequate at time of inspection,19 sty proposed bldg under alteration has inadequate vertical safety netting pulling away leaving gaps at various locations. remedy: repair
Dec 23, 2016
Resolve - Class - 1
No site-specific formwork design drawings present per 3301.7. at time of inspection of 19 sty proposed bldg under alteration,has concrete operations in process w/no formwork or design plans for concrete w/o box
Dec 23, 2016
Resolve - Class - 2
Failure to perform proper concrete washout water proceducers at site. at time of inspection of proposed 19 sty bldg under alteration w/concrete operations in process,observed concrete water & (slurry) in street
Dec 23, 2016
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. as noted: @ time of insp @ an active job site observed a concrete column blowout on the 3rd flr exp#3 column#15. while pouring 86
Dec 23, 2016
Resolve
Show 36 more ↓
- Class - 1
No guardrails-inadequate. noted: at construction of a 19 sty bldg w/concrete operations in procress,i noticed inadewquate guardrails around perimeter of shaftway. rails were damaged due to construction activity
Dec 23, 2016
Resolve - Class - 1
Sec. 3310-01. failure to comply w/rules(progress)by the commissioners site safety rule. ssm logbook at time of inspection the site safety manager on site only produced signs logs up to 12/17/16 w/no updated
Dec 23, 2016 · Penalty $400
Resolve - Class - 2
Failure to safeguard all persons & property. holes/opening not coveredat 19 sty proposed alteration w/concrete operations in process has not covered yp holes around columns,creating a hazardous condition for on
Dec 23, 2016
Resolve - Class - 2
Sec. 3309.1 failure to protected adjoing property. noted: at construction of a 14 sty bldg concrete operations in process. no window protection at exp#4 form work inches away from glass & bldg. partial stop wor
Dec 23, 2016
Resolve - Class - 2
Sec. 3301.5 unsafe conditions & equipment. noted: at construction siteof 19 sty bldg,concrete operations in process,has temporary pedestrianwalkway installed at exp#1 in roadway,barriers were not filled w/water
Dec 23, 2016 · Penalty $400
Resolve - Class - 2
Failure to maintain housekeeping. noted: at time of inspection(with)respoding to incident of 19 sty concrete bldg under construction has flammable debris & construction cut offs,piled up creating tripping hazar
Dec 23, 2016
Resolve - Class - 1
Failure of the concrete safety manager to perform required duties. as noted: @ time of insp @ active constructio site formwork failed during concrete ops on the 3rd flr exp#3 column blowout(#15) resulting in a
Dec 23, 2016
Resolve - Class - 2
Failure to post"no smoking signs" at 3rd fl of construction site w/alteration in process,no signs were present. remedy: post"no smoking signs".
Dec 23, 2016
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. at time of inspection respoding to incident of worker falling in shaftway observed uncapped rebars at ground floor level & workin
Dec 23, 2016 · Penalty $5,000
Resolve - Class - 1
No toeboards. at time of inspection,no toeboard observed at 2nd sty,exp#1 of alteration of concrete bldg in process. remedy: install toeboards.
Dec 23, 2016
Resolve - Class - 1
Sec. 3303.7.2 fire extingushiers as per fire code. no fire exitinguisher observed on 3rd fl for bldg under cvonstruction w/(slanders)on site. remedy: obtain fire extinguishers.
Dec 23, 2016
Resolve - Class - 2
Sec. 3301.2 failure to provide 3'x6" guardrail system around open & accessible floor openings. noted: above construction site has approx 40%of 1 floor demoished open & accessible to cellar below. jersey barrier
Apr 8, 2016
Resolve - Class - 1
Work does not conform to approved const docs &/or approved amendments.note:@the time of my insp of a 19 story bldg alteration in demo phase of a 6 story bldg.i observed that 6 story bldg was down to grade level
Feb 3, 2016
Resolve - Class - 2
Failure to provide approved/accepted plans @jobsite @time of insp of a19 story alteration job in demo phase of a story bldg down to grade level,w/exp#2,3 & 4 perimeter walls partially inplace.upon request for a
Feb 3, 2016
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations.noted ongoing demo work @ top elevation & contractor failed to remove excessive debris accumulated by demo operations garbage & de
Nov 18, 2015 · Penalty $400
Resolve - Class - 2
Failure to provide exit required width per bc1016.2;27-369. noted: at garage: the cellar rear exit is partially obstructed w/tight fitting parked vehicle. remedy: remove vehicle/maintain exit width clear.
Jan 19, 2014
Resolve - Class - 2
Exit door not self closing. noted: at garage,the cellar rear exit firedoor is not self closing w/frame & door bottom rotted,rusting & corroded through. remedy: repair &/or replaces - maintain fire doors self cl
Jan 19, 2014
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: at garage,defective concrete ceiling w/pieces missing exposing rebars at 6th fl stairway,3rd & 4th fls. also 3rd fl rear exit door has broken panic bar
Jan 19, 2014
Resolve - Class - 3
Failure to maintain bldg. noted: doors accessed from interior stairwell & exterior metal stairs at exp 3, are w/o handles, making re-entry inconvenient.doors are held open or partially open usinglumber,traffic
Jan 31, 2012
Resolve - Class - 1
Fail to provide unobstructed exit passageway. noted: at 3rd fl to 6th fl & 1st fl south exit stairway is blocked by motor vehicles. also note at 2nd fl north exit stairway is block by vehicles. remedy: remove
Dec 10, 2009 · Penalty $1,200
Resolve - Class - 1
Fail to maintain bldg in code compliant manner. noted: at 1st fl concrete ceiling is spalling, cracks at ceiling beams. cellar south wall cracks & fl in disrepair. 4th fl concrete ceiling rebar exposed. remed
Dec 10, 2009 · Penalty $250
Resolve - Class - 2
Failure to maintain building wall(s) or appurtenances. noted: at roof level of above premises cracks at south wall. also note at 2nd fl front window pane missing from one window. remedy: repair replace defects.
Dec 10, 2009 · Penalty $250
Resolve - Hazardous
Installed equipment does nto match approved plans operation of hoisting equipment in an unsafe manner. observed two lifelines attached to one parapet clamp. outrigger beam with less counterweights than needed.
Oct 19, 2007 · Penalty $4,500
Resolve - Non-hazardous
1b10/15m7/33p16/41r9 1b10=alarm 41r9=wires connected to fuses
Oct 10, 2003
Resolve - Non-hazardous
1b10/33p16/3x10 1b10=alarm 33p16=provide access to hoistway 3x10=fire service phase 2
Oct 10, 2003
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5),indicating correction of hazardous conditions described in initial ll10/80 report.remedy:file an am
Jan 26, 2001 · Penalty $1,000
Resolve - Hazardous
Failue to file amended round 5 reprt acceptable to this dept. pursuantto rule rcny 32-03b(5) indicating correction of hazardous conditions described in initial ll10/80 reprt. remedy:file amended reprt following
Oct 10, 2000 · Penalty $400
Resolve - Hazardous
Using hoisting equipment an unsafe manner(a)outrigger beams extendedi6ft(beam rated for a maximum of 4ft)(b) insufficient counterweights on outrigger beams i450lbs used,2400lbs needed(c) no filing for outrigger
Sep 8, 2000 · Penalty $4,500
Resolve - Non-hazardous
13m12,30o02,57o02,14m07,
Apr 3, 2000
Resolve - Non-hazardous
75u05,35o02,57o02,
Apr 3, 2000 · Penalty $2,500
Resolve - Non-hazardous
75u05,57o02,
Apr 3, 2000 · Penalty $350
Resolve - Non-hazardous
37l 38l 40u 46k 50y 53l 03m 37 adjust contracts 38 repair 40 5yr test 46 cables rusted 50 repair 53 repair
Jun 16, 1999 · Penalty $350
Resolve - Non-hazardous
400 46o 53m 74# 55m 40 perform 5yr test 46 clean cables 53 lighting 73 provide screen for fan in motor rm 55 pit light
Jun 16, 1999
Resolve - Non-hazardous
40j 41q 39h
Feb 1, 1996
Resolve - Non-hazardous
20m,21m,53x,18j. 21hall calls.
Nov 7, 1991 · Penalty $150
Resolve - Non-hazardous
37 74 73o 31q 36w installed new controller and firemen service without a permit file and obtain permit and have test by this dept
Jun 11, 1991 · Penalty $75
Resolve
Complaints
- Heat/hot water
Apartment only
Jan 19, 2023 · Apt 12C
Close - Heat/hot water
Entire building
Nov 5, 2019 · Apt BLDG
Close - Unsanitary condition
Pests
Jul 31, 2016 · Apt 46
Close - Construction
Elevator
May 1, 2007 · Apt 1F
Close - Nonconst
Vermin
May 1, 2007 · Apt 1F
Close - Nonconst
Vermin
May 1, 2007 · Apt 1F
Close - General
Windows
May 1, 2007 · Apt 1F
Close - General
Mold
May 1, 2007 · Apt 1F
Close - Plumbing
Bathtub/shower
May 1, 2007 · Apt 1F
Close - Electric
Wiring
May 1, 2007 · Apt 1F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D8)
- Year built
- 2018
- Floors
- 19
- Residential units
- 56
- Building area
- 154,952 ft²
- Lot area
- 13,013 ft²
- Zoning
- C2-8A
- Community board
- 108
- Council district
- 4
- Block / lot
- 1515 / 46
- Assessed value
- $23,640,300
- Landmark / historic district
- No
HPD registration #115967, last renewed Aug 23, 2025.
Questions about 152 East 87 Street
Who owns 152 East 87 Street?
The owner of record in NYC Department of City Planning PLUTO data is Allan Garage,.
Does 152 East 87 Street have violations?
Yes. NYC HPD has recorded 4 housing violations at this property.
Is 152 East 87 Street rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 2% of its 56 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 152 East 87 Street built?
City records list 2018 as the year it was built.
How many apartments are in 152 East 87 Street?
It has 56 residential units and 59 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.