roofy

152 East 87 Street

Manhattan, NY 10128BBL 1-01515-0046Map

Owner of record: Allan Garage,

152 East 87 Street is an elevator apartment building built in 2018 in Manhattan, 10128. It has 56 residential units across 19 floors. The owner of record is Allan Garage,. HPD has recorded 4 housing violations here, most recently on October 9, 2018. City tax records listed 1 rent-stabilized apartment here in 2024.

HPD violations
4
DOB violations
83
ECB violations
46
HPD complaints
10

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Oct 9, 2018

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
1
About 2% of the building's 56 apartments
Down from 51 in 2020

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 4

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 9, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 6, 2017

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 25, 2016

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 1, 2015

    Closed — Violation dismissed

DOB building violations · 83

  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 15, 2020

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 23, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 3, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 3, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 3, 2017

    Dob violation - dismissed
Show 40 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 3, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 3, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 3, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 3, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 3, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 3, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 3, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 5, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 5, 2017

    Dob violation - dismissed
  • Construction other optional

    Owner to submit signed and sealed set of concrete formwork design, no later than 1/17/17

    Jan 4, 2017

    Dob violation - dismissed
  • Construction other optional

    Borys hayda, eor, to submit complete and approved set of structural plans, no later than 01/17/17

    Jan 4, 2017

    Dob violation - dismissed
  • Construction other optional

    Owner to submit complete and approved set of structural plans, no late r than 1/17/17

    Jan 4, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Dec 23, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 10, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 10, 2016

    Dob violation - resolved
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2015

    Mar 14, 2016

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7a technical report by 02/21/2012

    Jan 31, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 14, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 14, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 14, 2011

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Feb 27, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 5, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 2, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 2, 2009

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 18, 2008

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Marquee other required

    Cmq-marquee other required

    Mar 20, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 22, 2006

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed

ECB violations · 46

  • Class - 1

    Failure to notify the department of na incident that resulted in a fatality or injury note one owkrer was installing door frame when part of the door fra eloosed and hit another worker on his head sustain cut a

    Sep 11, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    1rcny3319-01(9)2(i)(a)cranse plans do not show perminent features and actual site conditions required to be shown on these documents for crane use.while performing the pre layout inspection for the cranes requi

    Apr 7, 2018 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping. note: @ time of insp a 19 story nb @ roof level. observed construction over other debris scattered on several flrs scattered @ various locations. this creates a potent

    Jul 26, 2017 · Penalty $400

    Resolve
  • Class - 1

    Work w/out permit: note @ time of insp of a 19 story nb. a supported scaffold approx 48 ft right (8 sections) installed in elevator shaft in front a permit.stop all work in supported scaffold installed in eleva

    Jul 26, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3303.2.1 failure to take adequate measures to protect utilities.at tihe time of inspection it was observed that the contractor damaged coned power line while excavating to make connection for main power.the

    Jun 2, 2017

    Resolve
  • Class - 1

    Sec. 3301.2 no overhead protection. at time of inspection at a 19 sty bldg under alteration w/concrete operations in process,at exp#1,main construction entrance does not have overhead protection to safeguard

    Dec 23, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    Sec. 3306.3 vertical safety netting inadequate at time of inspection,19 sty proposed bldg under alteration has inadequate vertical safety netting pulling away leaving gaps at various locations. remedy: repair

    Dec 23, 2016

    Resolve
  • Class - 1

    No site-specific formwork design drawings present per 3301.7. at time of inspection of 19 sty proposed bldg under alteration,has concrete operations in process w/no formwork or design plans for concrete w/o box

    Dec 23, 2016

    Resolve
  • Class - 2

    Failure to perform proper concrete washout water proceducers at site. at time of inspection of proposed 19 sty bldg under alteration w/concrete operations in process,observed concrete water & (slurry) in street

    Dec 23, 2016

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. as noted: @ time of insp @ an active job site observed a concrete column blowout on the 3rd flr exp#3 column#15. while pouring 86

    Dec 23, 2016

    Resolve
Show 36 more ↓
  • Class - 1

    No guardrails-inadequate. noted: at construction of a 19 sty bldg w/concrete operations in procress,i noticed inadewquate guardrails around perimeter of shaftway. rails were damaged due to construction activity

    Dec 23, 2016

    Resolve
  • Class - 1

    Sec. 3310-01. failure to comply w/rules(progress)by the commissioners site safety rule. ssm logbook at time of inspection the site safety manager on site only produced signs logs up to 12/17/16 w/no updated

    Dec 23, 2016 · Penalty $400

    Resolve
  • Class - 2

    Failure to safeguard all persons & property. holes/opening not coveredat 19 sty proposed alteration w/concrete operations in process has not covered yp holes around columns,creating a hazardous condition for on

    Dec 23, 2016

    Resolve
  • Class - 2

    Sec. 3309.1 failure to protected adjoing property. noted: at construction of a 14 sty bldg concrete operations in process. no window protection at exp#4 form work inches away from glass & bldg. partial stop wor

    Dec 23, 2016

    Resolve
  • Class - 2

    Sec. 3301.5 unsafe conditions & equipment. noted: at construction siteof 19 sty bldg,concrete operations in process,has temporary pedestrianwalkway installed at exp#1 in roadway,barriers were not filled w/water

    Dec 23, 2016 · Penalty $400

    Resolve
  • Class - 2

    Failure to maintain housekeeping. noted: at time of inspection(with)respoding to incident of 19 sty concrete bldg under construction has flammable debris & construction cut offs,piled up creating tripping hazar

    Dec 23, 2016

    Resolve
  • Class - 1

    Failure of the concrete safety manager to perform required duties. as noted: @ time of insp @ active constructio site formwork failed during concrete ops on the 3rd flr exp#3 column blowout(#15) resulting in a

    Dec 23, 2016

    Resolve
  • Class - 2

    Failure to post"no smoking signs" at 3rd fl of construction site w/alteration in process,no signs were present. remedy: post"no smoking signs".

    Dec 23, 2016

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations. at time of inspection respoding to incident of worker falling in shaftway observed uncapped rebars at ground floor level & workin

    Dec 23, 2016 · Penalty $5,000

    Resolve
  • Class - 1

    No toeboards. at time of inspection,no toeboard observed at 2nd sty,exp#1 of alteration of concrete bldg in process. remedy: install toeboards.

    Dec 23, 2016

    Resolve
  • Class - 1

    Sec. 3303.7.2 fire extingushiers as per fire code. no fire exitinguisher observed on 3rd fl for bldg under cvonstruction w/(slanders)on site. remedy: obtain fire extinguishers.

    Dec 23, 2016

    Resolve
  • Class - 2

    Sec. 3301.2 failure to provide 3'x6" guardrail system around open & accessible floor openings. noted: above construction site has approx 40%of 1 floor demoished open & accessible to cellar below. jersey barrier

    Apr 8, 2016

    Resolve
  • Class - 1

    Work does not conform to approved const docs &/or approved amendments.note:@the time of my insp of a 19 story bldg alteration in demo phase of a 6 story bldg.i observed that 6 story bldg was down to grade level

    Feb 3, 2016

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans @jobsite @time of insp of a19 story alteration job in demo phase of a story bldg down to grade level,w/exp#2,3 & 4 perimeter walls partially inplace.upon request for a

    Feb 3, 2016

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations.noted ongoing demo work @ top elevation & contractor failed to remove excessive debris accumulated by demo operations garbage & de

    Nov 18, 2015 · Penalty $400

    Resolve
  • Class - 2

    Failure to provide exit required width per bc1016.2;27-369. noted: at garage: the cellar rear exit is partially obstructed w/tight fitting parked vehicle. remedy: remove vehicle/maintain exit width clear.

    Jan 19, 2014

    Resolve
  • Class - 2

    Exit door not self closing. noted: at garage,the cellar rear exit firedoor is not self closing w/frame & door bottom rotted,rusting & corroded through. remedy: repair &/or replaces - maintain fire doors self cl

    Jan 19, 2014

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. noted: at garage,defective concrete ceiling w/pieces missing exposing rebars at 6th fl stairway,3rd & 4th fls. also 3rd fl rear exit door has broken panic bar

    Jan 19, 2014

    Resolve
  • Class - 3

    Failure to maintain bldg. noted: doors accessed from interior stairwell & exterior metal stairs at exp 3, are w/o handles, making re-entry inconvenient.doors are held open or partially open usinglumber,traffic

    Jan 31, 2012

    Resolve
  • Class - 1

    Fail to provide unobstructed exit passageway. noted: at 3rd fl to 6th fl & 1st fl south exit stairway is blocked by motor vehicles. also note at 2nd fl north exit stairway is block by vehicles. remedy: remove

    Dec 10, 2009 · Penalty $1,200

    Resolve
  • Class - 1

    Fail to maintain bldg in code compliant manner. noted: at 1st fl concrete ceiling is spalling, cracks at ceiling beams. cellar south wall cracks & fl in disrepair. 4th fl concrete ceiling rebar exposed. remed

    Dec 10, 2009 · Penalty $250

    Resolve
  • Class - 2

    Failure to maintain building wall(s) or appurtenances. noted: at roof level of above premises cracks at south wall. also note at 2nd fl front window pane missing from one window. remedy: repair replace defects.

    Dec 10, 2009 · Penalty $250

    Resolve
  • Hazardous

    Installed equipment does nto match approved plans operation of hoisting equipment in an unsafe manner. observed two lifelines attached to one parapet clamp. outrigger beam with less counterweights than needed.

    Oct 19, 2007 · Penalty $4,500

    Resolve
  • Non-hazardous

    1b10/15m7/33p16/41r9 1b10=alarm 41r9=wires connected to fuses

    Oct 10, 2003

    Resolve
  • Non-hazardous

    1b10/33p16/3x10 1b10=alarm 33p16=provide access to hoistway 3x10=fire service phase 2

    Oct 10, 2003

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5),indicating correction of hazardous conditions described in initial ll10/80 report.remedy:file an am

    Jan 26, 2001 · Penalty $1,000

    Resolve
  • Hazardous

    Failue to file amended round 5 reprt acceptable to this dept. pursuantto rule rcny 32-03b(5) indicating correction of hazardous conditions described in initial ll10/80 reprt. remedy:file amended reprt following

    Oct 10, 2000 · Penalty $400

    Resolve
  • Hazardous

    Using hoisting equipment an unsafe manner(a)outrigger beams extendedi6ft(beam rated for a maximum of 4ft)(b) insufficient counterweights on outrigger beams i450lbs used,2400lbs needed(c) no filing for outrigger

    Sep 8, 2000 · Penalty $4,500

    Resolve
  • Non-hazardous

    13m12,30o02,57o02,14m07,

    Apr 3, 2000

    Resolve
  • Non-hazardous

    75u05,35o02,57o02,

    Apr 3, 2000 · Penalty $2,500

    Resolve
  • Non-hazardous

    75u05,57o02,

    Apr 3, 2000 · Penalty $350

    Resolve
  • Non-hazardous

    37l 38l 40u 46k 50y 53l 03m 37 adjust contracts 38 repair 40 5yr test 46 cables rusted 50 repair 53 repair

    Jun 16, 1999 · Penalty $350

    Resolve
  • Non-hazardous

    400 46o 53m 74# 55m 40 perform 5yr test 46 clean cables 53 lighting 73 provide screen for fan in motor rm 55 pit light

    Jun 16, 1999

    Resolve
  • Non-hazardous

    40j 41q 39h

    Feb 1, 1996

    Resolve
  • Non-hazardous

    20m,21m,53x,18j. 21hall calls.

    Nov 7, 1991 · Penalty $150

    Resolve
  • Non-hazardous

    37 74 73o 31q 36w installed new controller and firemen service without a permit file and obtain permit and have test by this dept

    Jun 11, 1991 · Penalty $75

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Jan 19, 2023 · Apt 12C

    Close
  • Heat/hot water

    Entire building

    Nov 5, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jul 31, 2016 · Apt 46

    Close
  • Construction

    Elevator

    May 1, 2007 · Apt 1F

    Close
  • Nonconst

    Vermin

    May 1, 2007 · Apt 1F

    Close
  • Nonconst

    Vermin

    May 1, 2007 · Apt 1F

    Close
  • General

    Windows

    May 1, 2007 · Apt 1F

    Close
  • General

    Mold

    May 1, 2007 · Apt 1F

    Close
  • Plumbing

    Bathtub/shower

    May 1, 2007 · Apt 1F

    Close
  • Electric

    Wiring

    May 1, 2007 · Apt 1F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D8)
Year built
2018
Floors
19
Residential units
56
Building area
154,952 ft²
Lot area
13,013 ft²
Zoning
C2-8A
Community board
108
Council district
4
Block / lot
1515 / 46
Assessed value
$23,640,300
Landmark / historic district
No

HPD registration #115967, last renewed Aug 23, 2025.

Questions about 152 East 87 Street

Who owns 152 East 87 Street?

The owner of record in NYC Department of City Planning PLUTO data is Allan Garage,.

Does 152 East 87 Street have violations?

Yes. NYC HPD has recorded 4 housing violations at this property.

Is 152 East 87 Street rent stabilized?

NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 2% of its 56 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 152 East 87 Street built?

City records list 2018 as the year it was built.

How many apartments are in 152 East 87 Street?

It has 56 residential units and 59 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.