roofy

150 East 85 Street

Manhattan, NY 10028BBL 1-01513-7502Map

Owner of record: Ventana Condominium

150 East 85 Street is a condominium built in 1986 in Manhattan, 10028. It has 102 residential units across 15 floors. The owner of record is Ventana Condominium. HPD has recorded 28 housing violations here, most recently on October 6, 2026. 4 of the 28 most recent violations are still open.

HPD violations
28
DOB violations
56
ECB violations
20
HPD complaints
31

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 6, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 28

  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 10a, 10th story, 1st apartment from north at east

    Oct 6, 2026 · Apt 10A

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system locked door at cellar at boiler room

    Oct 6, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Oct 5, 2020

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 5, 2020

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Oct 5, 2020

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at or near mailbox. at public hall, 1st story

    Oct 5, 2020

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at or near mailbox. at public hall, 1st story

    Oct 5, 2020

    Open — Not complied with
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story

    Oct 5, 2020

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Oct 5, 2020

    Closed — Violation closed
Show 18 more ↓
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Oct 5, 2020

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the bathroom located at apt 11d, 11th story, 4th apartment from south at west

    Oct 1, 2020 · Apt 11D

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 25, 2019

    Closed — Violation dismissed
  • A

    Refit at windows north wall in the 1st room from north located at apt 3d, 3rd story, 1st apartment from west at north

    Nov 17, 2017 · Apt 3D

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective caulking around interior window frames at north wall in the 1st room from north located at apt 3d, 3rd story, 1st apartment from west at north

    Nov 17, 2017 · Apt 3D

    Closed — Violation closed
  • A

    Refit windows at north wall in the 2nd room from north located at apt 3d, 3rd story, 1st apartment from west at north

    Nov 17, 2017 · Apt 3D

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective caulking around interior windows frame at north wall in the 2nd room from north located at apt 3d, 3rd story, 1st apartment from west at north

    Nov 17, 2017 · Apt 3D

    Closed — Violation closed
  • A

    Refit windows at north wall in the 2nd room from north located at apt 3d, 3rd story, 1st apartment from west at north

    Nov 17, 2017 · Apt 3D

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 3d, 3rd story, 1st apartment from west at north

    Nov 17, 2017 · Apt 3D

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 3d, 3rd story, 1st apartment from west at north

    Nov 17, 2017 · Apt 3D

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 3d, 3rd story, 1st apartment from west at north

    Nov 17, 2017 · Apt 3D

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 3d, 3rd story, 1st apartment from west at north

    Nov 17, 2017 · Apt 3D

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective caulking around interior window frames north wall in the 2nd room from north located at apt 3d, 3rd story, 1st apartment from west at north

    Nov 17, 2017 · Apt 3D

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at lobby, 1st story

    Mar 2, 2011

    Open — Not complied with
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north

    Mar 2, 2011 · Apt 3D

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at lobby, 1st story

    Mar 2, 2011

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north

    Mar 2, 2011 · Apt 3D

    Closed — Violation closed
  • B

    Properly repair the broken or defective wooden floor in the private hallway located at apt 3d, 3rd story, 1st apartment from west at north

    Mar 2, 2011 · Apt 3D

    Closed — Violation closed

DOB building violations · 56

  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 external hgh pressure inspection

    Sep 23, 2024

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 external hgh pressure inspection

    Sep 23, 2024

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 internal hgh pressure inspection

    Sep 23, 2024

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 internal hgh pressure inspection

    Sep 23, 2024

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
Show 40 more ↓
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 external hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 external hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 external hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 external hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 internal high pressure inspection

    Apr 25, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 internal high pressure inspection

    Apr 25, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 external high pressure inspection

    Apr 25, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 external high pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 12, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 10, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 10, 2020

    Dob violation - resolved
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued - failure to file 2017 internal high pressure boiler inspection

    Mar 16, 2020

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued - failure to file 2017 internal high pressure boiler inspection

    Mar 16, 2020

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)

    Mar 18, 2019

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)

    Mar 17, 2019

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)

    Mar 16, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)

    Jun 1, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 2, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 2, 2015

    Dob violation - resolved
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years

    Jun 1, 2015

    Dob violation - dismissed
  • Construction other optional

    Boro-comm

    Nov 15, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 13, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 13, 2014

    Dob violation - resolved

ECB violations · 20

  • Class - 1

    100/l/10 dlm is not working defective repair, 2/x/10 out side comm inoperative repair,56/y/13 hoist machine oil leak seal.

    Feb 17, 2026 · Penalty $1,250

    Active
  • Class - 2

    No parapet panel.note:at the time of inspection observed a heavy duty sidewalk shed at exposure 1 & 4.pedestrian walking under those sws.also observed entire sidewalk shed missing information panel or parapet p

    Oct 21, 2021

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specification.note:at the time of inspection observed a heavy duty sidewalk shed at exposure 1 & 4.pedestrian walking under the sws.also observed(1)missing screw caps se

    Oct 21, 2021 · Penalty $2,400

    Resolve
  • Class - 1

    Owner failed to repair defective condition(parapet height at unit 12c roof terrace is 39 3/4 which is less than minimum parapet height 42" as per code)within time frame recommended by qewi.qewi recommended repa

    Feb 13, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    Bc3314.8.2 failure to maintain supported scaffold.at time of inspection observed a job site w/facade work in progress.during inspection noted that debris netting at supported scaffold is damaged/unsecured not

    Sep 4, 2020

    Resolve
  • Class - 1

    Sec. 3314.8.2 failure to adequately install debri netting. alt-2 15 sty occupied existing bldg-facade work at the time of my inspection i observed the debris netting did not fully enclose the pipe scaffold as

    Apr 9, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to provide approved/accepted construction documents at job site at time of inspection alt-2 15 sty occupied bldg facade work. at thetime of my inspection i observed unsafety installed supported scaffold

    Apr 9, 2019 · Penalty $312

    Resolve
  • Class - 1

    Sec. 3309.10 failure to protect or adequately protect adjoining properties during construction or demolition operation. no roof protection alt-2. 15 sty occupied bldg-facade work. at the time of my inspection i

    Apr 9, 2019 · Penalty $625

    Resolve
  • Class - 1

    Sec. 3314.8.1 inadequate guardrail system on pipe scaffold-missing toe boards. alt-2 15 sty existing occupied bldg-facade work. at the time of my inspection i observed the end toe boards was not installed on 4/

    Apr 9, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations-no overhead protection alt-2 15 sty occupied bldg-facade work. at the time of my inspection i observed that there was no overhead

    Apr 9, 2019 · Penalty $10,000

    Resolve
Show 10 more ↓
  • Class - 1

    Sec. 3314.4 failure to install supported scaffold in a gate working order-missing components/attachments-pins alt-2 15 sty occupied bldg-facade work. at the time of my inspection i observed that there was pins

    Apr 9, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain/display on site document required by chapter 33-no design drawings. alt-2 15 sty occupied bldg. at the time of my inspection i observed pulleys installed on 2/4 of the pipe scaffold upon my

    Apr 9, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Storage on sidewalk shed. alt-2 15 sty occupied bldg facade work. at the time of my inspection i observed a make shift storage/working table materials & a job box located on the sidewalk shed. @ exp#1 these ite

    Apr 9, 2019 · Penalty $2,400

    Resolve
  • Class - 1

    18b.50a.50b.50c.38.51.50a carbon monoxide spillage from boiler reading levels of 550 ppm repair immediately 50b adjust gas burner for effientcy and complete combustion to be done by a quality person w/knowledge

    May 29, 2009 · Penalty $1,000

    Resolve
  • Class - 2

    18b.50a.48a.50b 50a defective blow down tank valve and vent line 50b boiler fkue pipe must run independently to chimney base and not connected other boiler flue pipe 38 defective fresh air intake motor not work

    May 29, 2009 · Penalty $500

    Resolve
  • Class - 3

    38. 38 fresh air intake motor disconnected and not providing fresh airto boiler rm

    May 29, 2009 · Penalty $200

    Active
  • Class - 2

    100bb05,56y10,56y13,56y02,68m07,16b07,39p16,67x10,70p16,30p16,31p16. 100bb perform and file current 2year test. 56y repair and seal (blow) parking. 16b provide ropes drop key hole for access car top w/ 15th and

    Oct 3, 2008 · Penalty $500

    Resolve
  • Non-hazardous

    50.fulton v.t.boiler,20hp,nb 84648,gas,1999.50-gauge glass assembly defective & isolated from service on the operating boiler.restore gauge glass to service promptly.

    Oct 6, 2007

    Resolve
  • Non-hazardous

    50.fulton vt boiler,20hp,nb 84659,gas, 199.50-gauge glass assembly defective & dislocated from service on the operating boiler.restore gaugeglass to service promptly.

    Oct 6, 2007 · Penalty $180

    Resolve
  • Non-hazardous

    Work without a permit. noted: at apt 15c a hole was done at south exterior wall for a vent/ flu for fire place, including new gas line. the duplex apt has been renovated with new fixtures fittings for a 3 piece

    Jun 23, 2004 · Penalty $250

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Oct 5, 2026 · Apt 10A

    Close
  • General

    Signage missing

    Aug 10, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 6, 2022 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Sep 17, 2021 · Apt 11E

    Close
  • Heat/hot water

    Entire building

    Nov 12, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 3, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 3, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 3, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 2, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 1, 2020 · Apt BLDG

    Close
Show 21 more ↓
  • Heat/hot water

    Entire building

    Oct 31, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 31, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 2, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Sep 30, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 6, 2019 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Apr 30, 2018 · Apt 7A

    Close
  • Door/window

    Window frame

    Nov 9, 2017 · Apt 3D

    Close
  • Water leak

    Heavy flow

    Nov 9, 2017 · Apt 3D

    Close
  • Heat/hot water

    Entire building

    Apr 29, 2014 · Apt 10G

    Close
  • Heating

    Heat related

    Dec 28, 2012 · Apt 5B

    Close
  • Heating

    Heat related

    Dec 13, 2011 · Apt BLDG

    Close
  • General

    Floor

    Feb 15, 2011 · Apt 3D

    Close
  • Appliance

    Refrigerator

    Feb 15, 2011 · Apt 3D

    Close
  • Appliance

    Refrigerator

    Aug 28, 2009 · Apt 3D

    Close
  • Plumbing

    Water-leaks

    Aug 28, 2009 · Apt 3D

    Close
  • Heating

    Heat related

    Mar 27, 2009 · Apt BLDG

    Close
  • Heating

    Heat related

    Mar 27, 2009 · Apt BLDG

    Close
  • Heating

    Heat related

    Mar 26, 2009 · Apt BLDG

    Close
  • Heating

    Heat related

    Jan 6, 2006 · Apt 7D

    Close
  • General

    Mold

    Aug 5, 2004 · Apt BLDG

    Close
  • Plumbing

    Water-leaks

    Aug 5, 2004 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
1986
Floors
15
Residential units
102
Building area
89,455 ft²
Lot area
9,494 ft²
Zoning
C1-8X
Community board
108
Council district
4
Block / lot
1513 / 7502
Assessed value
$10,808,544
Landmark / historic district
No

HPD registration #140527, last renewed Aug 28, 2025.

Questions about 150 East 85 Street

Who owns 150 East 85 Street?

The owner of record in NYC Department of City Planning PLUTO data is Ventana Condominium.

Does 150 East 85 Street have violations?

Yes. NYC HPD has recorded 28 housing violations at this property.

Is 150 East 85 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 150 East 85 Street built?

City records list 1986 as the year it was built.

How many apartments are in 150 East 85 Street?

It has 102 residential units and 103 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.