roofy

1252 Lexington Avenue

Manhattan, NY 10028BBL 1-01513-0056Map

Owner of record: 1252 Lexington Avenue, LLC

1252 Lexington Avenue is a mixed residential and retail building built in 1910 in Manhattan, 10028. It has 6 residential units across 4 floors. The owner of record is 1252 Lexington Avenue, LLC. HPD has recorded 23 housing violations here, most recently on October 11, 2026. 13 of the 23 most recent violations are still open.

HPD violations
23
DOB violations
3
ECB violations
4
HPD complaints
47

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 23

  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Oct 11, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 11, 2026

    Open — Nov sent out
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Aug 24, 2026

    Open — Nov certified on time
  • C

    Remove device preventing door from being self-closing hook and eye permanently installed at building entrance door

    Aug 24, 2026

    Closed — Violation closed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Apr 26, 2025

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at south wall, bulkhead.

    Oct 16, 2024

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department south wall, bulkhead

    Oct 16, 2024

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of house hold items at public hall, 1st story

    Oct 2, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 15, 2023

    Closed — Violation dismissed
Show 13 more ↓
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation dismissed
  • C

    Replace with new the broken or defective 1st 2nd 3rd and 4th wood treads from bottom up at public hall stairs, 1st story

    Jul 13, 2020

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story

    Jul 13, 2020

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jul 13, 2020

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jul 13, 2020

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing 3 sty north apt 3r e zimmerman , section '' ''

    Feb 24, 1998 · Apt 3R

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at or near mail boxes 1 sty vestibule public hall.

    Feb 10, 1998

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing at 3 sty rear north apt 3r harding. located at apt 3r

    Feb 10, 1998 · Apt 3R

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures door to cellar at 1 sty public hall locked.

    Feb 10, 1998

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing 4 sty northeast apt 4f ms sheth. , section '' ''

    Dec 7, 1996 · Apt 4F

    Open — Nov sent out
  • C

    Section 231 m/d law provide legal second means of egress and file application for approval before doing the work 2 sty northwest apt 2r west room to 2nd sty rear extension roof. located at apt 2r

    Jan 4, 1988 · Apt 2R

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of ventilating ducts obstructing egress to adjacent building 2nd sty rear extension roof at north.

    Jan 4, 1988

    Open — Nov sent out

DOB building violations · 3

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Electric signs none

    Es-electric signs none

    Jun 3, 1992

    Dob violation - dismissed

ECB violations · 4

  • Class - 2

    Failure to comply with commissioner's order contained in summons#39051290k issued on 11/17/2021,and failure to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptable certific

    Aug 26, 2024 · Penalty $1,280

    Resolve
  • Class - 2

    As per hpd section of law, 27-2033. boiler access notice. sign not posted conspicuously in lobby of building. post signage.

    Nov 17, 2021 · Penalty $625

    Resolve
  • Class - 2

    Work w/o permit.noted:no permits for illuminated accessory business signs on facade & projection from facade including text "world of wines""liquor".rem:obtain all required permits or restore premises to prior

    Mar 13, 2014 · Penalty $4,000

    Resolve
  • Class - 3

    Failure to maintain bldg in a code compliant manner. defects noted: attime of inspection interior stairs are (loading) to roof. water damageto walls & ceilings in bulkhead. hvac condenser unit & a door stored

    Jan 2, 2013 · Penalty $100

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Sep 5, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 6, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 31, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 29, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 26, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 25, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 24, 2025 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Oct 22, 2025 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2025 · Apt 3R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 19, 2025 · Apt BLDG

    Close
Show 37 more ↓
  • Unsanitary condition

    Garbage/recycling storage

    Sep 5, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 29, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 28, 2025 · Apt BLDG

    Close
  • Electric

    No lighting

    Jul 1, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 19, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 11, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Nov 5, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Nov 5, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Nov 1, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 18, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 15, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 13, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 13, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 13, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Aug 20, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Aug 20, 2024 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Oct 20, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 11, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 10, 2023 · Apt BLDG

    Close
  • Water leak

    Damp spot

    Jun 29, 2023 · Apt 4R

    Close
  • Paint/plaster

    Wall

    Jun 29, 2023 · Apt 4R

    Close
  • Paint/plaster

    Ceiling

    Jun 29, 2023 · Apt 4R

    Close
  • Water leak

    Slow leak

    Jun 29, 2023 · Apt 4R

    Close
  • Paint/plaster

    Wall

    Jun 29, 2023 · Apt 4R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 10, 2020 · Apt 4F

    Close
  • Flooring/stairs

    Stairs

    Jul 10, 2020 · Apt 4F

    Close
  • Flooring/stairs

    Stairs

    Jul 10, 2020 · Apt 4F

    Close
  • Unsanitary condition

    Mold

    Jul 10, 2020 · Apt 4F

    Close
  • Unsanitary condition

    Pests

    Jul 10, 2020 · Apt 4F

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 9, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 12, 2018 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S5)
Year built
1910
Floors
4
Residential units
6
Building area
4,336 ft²
Lot area
1,343 ft²
Zoning
C1-8X
Community board
108
Council district
4
Block / lot
1513 / 56
Assessed value
$1,853,550
Landmark / historic district
No

HPD registration #103953, last renewed Aug 8, 2025.

Questions about 1252 Lexington Avenue

Who owns 1252 Lexington Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 1252 Lexington Avenue, LLC.

Does 1252 Lexington Avenue have violations?

Yes. NYC HPD has recorded 23 housing violations at this property.

Is 1252 Lexington Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1252 Lexington Avenue built?

City records list 1910 as the year it was built.

How many apartments are in 1252 Lexington Avenue?

It has 6 residential units and 7 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.