roofy

1150 Madison Avenue

Manhattan, NY 10028BBL 1-01497-0009Map

Owner of record: 12 East 86th Streetllc

1150 Madison Avenue is an elevator apartment building built in 1923 in Manhattan, 10028. It has 343 residential units across 15 floors. The owner of record is 12 East 86th Streetllc. HPD has recorded 36 housing violations here, most recently on June 25, 2023. City tax records listed 118 rent-stabilized apartments here in 2024.

HPD violations
36
DOB violations
105
ECB violations
76
HPD complaints
391

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jun 25, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
118
About 34% of the building's 343 apartments
Down from 129 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 36

  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 3rd room from east located at apt 731, 7th story, 1st apartment from north at east , section ''northeast''

    Jun 25, 2023 · Apt 731

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the kitchen located at apt 731, 7th story, 1st apartment from north at east , section ''northeast''

    Jun 25, 2023 · Apt 731

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 731, 7th story, 1st apartment from north at east , section ''northeast''

    Jun 25, 2023 · Apt 731

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 731, 7th story, 1st apartment from north at east , section ''northeast''

    Jun 25, 2023 · Apt 731

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective wood floor in the 4th room from east located at apt 731, 7th story, 1st apartment from north at east , section ''northeast''

    Jun 25, 2023 · Apt 731

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 731, 7th story, 1st apartment from north at east , section ''northeast''

    Jun 25, 2023 · Apt 731

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 731, 7th story, 1st apartment from north at east , section ''northeast''

    Jun 25, 2023 · Apt 731

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, ceiling, west wall, east wall in the 3rd room from east located at apt 731, 7th story, 1st apartment from north at east , section ''northeast''

    Jun 25, 2023 · Apt 731

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling ceiling in the 1st room from east at north located at apt 731, 7th story, 1st apartment from north at east , section ''northeast''

    Jun 25, 2023 · Apt 731

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 403, 4th story, 1st apartment from north at east , section at south

    Apr 29, 2019 · Apt 403

    Closed — Violation closed
Show 26 more ↓
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 403, 4th story, 1st apartment from north at east , section at south

    Apr 29, 2019 · Apt 403

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 403, 4th story, 1st apartment from north at east , section at south

    Apr 29, 2019 · Apt 403

    Closed — Violation closed
  • B

    Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 403, 4th story, 1st apartment from north at east , section at south

    Apr 29, 2019 · Apt 403

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 1st room from east at north located at apt 403, 4th story, 1st apartment from north at east , section at south

    Apr 29, 2019 · Apt 403

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls inside closet. in the foyer located at apt 403, 4th story, 1st apartment from north at east , section at south

    Apr 29, 2019 · Apt 403

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 4; located at apt 201, 2nd story, 5th apartment from north at east

    Dec 2, 2018 · Apt 201

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1109, 11th story, 2nd apartment from south at west

    Apr 3, 2017 · Apt 1109

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the south and north walls in the bathroom located at apt 1109, 11th story, 2nd apartment from south at west

    Apr 3, 2017 · Apt 1109

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 1026, 10th story, 2nd apartment from east at south

    Dec 26, 2015 · Apt 1026

    Closed — Violation closed
  • A

    Replace the broken or defective or reglaze the bathtub in the bathroom located at apt 1026, 10th story, 2nd apartment from east at south

    Dec 26, 2015 · Apt 1026

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective wood floor in the 4th room from east at south located at apt 1026, 10th story, 2nd apartment from east at south

    Dec 26, 2015 · Apt 1026

    Closed — Violation closed
  • A

    Refit hinges at closet doors at east-2 closet in the 4th room from north located at apt 1026, 10th story, 2nd apartment from south at west

    Oct 8, 2015 · Apt 1026

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood stool at 2 windows at west wall in the 4th room from north located at apt 1026, 10th story, 2nd apartment from south at west

    Oct 8, 2015 · Apt 1026

    Closed — Violation closed
  • A

    Refit doors at wall cabinets at north and south walls in the kitchen located at apt 1026, 10th story, 2nd apartment from south at west

    Oct 8, 2015 · Apt 1026

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective parquet floor in the kitchen located at apt 1026, 10th story, 2nd apartment from south at west

    Oct 8, 2015 · Apt 1026

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls in the kitchen located at apt 1026, 10th story, 2nd apartment from south at west

    Oct 8, 2015 · Apt 1026

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls in the 2nd room from north located at apt 1026, 10th story, 2nd apartment from south at west

    Oct 8, 2015 · Apt 1026

    Closed — Violation closed
  • A

    Refit door at vanity under wash basin in the bathroom located at apt 1026, 10th story, 2nd apartment from south at west

    Oct 8, 2015 · Apt 1026

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation radiator in the bathroom located at apt 1026, 10th story, 2nd apartment from south at west

    Oct 8, 2015 · Apt 1026

    Closed — Violation closed
  • B

    Replace with new the broken or defective shut off radiator valve in the bathroom located at apt 1026, 10th story, 2nd apartment from south at west

    Oct 8, 2015 · Apt 1026

    Closed — Violation closed
  • B

    Properly repair the broken or defective counter balance at upper window sash in the kitchen located at apt 1026, 10th story, 2nd apartment from south at west

    Oct 8, 2015 · Apt 1026

    Closed — Violation closed
  • B

    Properly repair the broken or defective counter balances at lower and upper sashes at west-1 window in the 4th room from north located at apt 1026, 10th story, 2nd apartment from south at west

    Oct 8, 2015 · Apt 1026

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective parquet floor near closets at east wall in the 4th room from north located at apt 1026, 10th story, 2nd apartment from south at west

    Oct 8, 2015 · Apt 1026

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east, the 2nd bathroom from east, the 1st room from east at south located at apt 500, 5th story, 2nd apartment from north at east

    Oct 4, 2015 · Apt 500

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Nov 2, 2012

    Closed — Violation closed
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story

    Nov 2, 2012

    Closed — Violation closed

DOB building violations · 105

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 22, 2025

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 20, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 2, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 2, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 2, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 2, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 2, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 2, 2020

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 30, 2020

    Dob violation - dismissed
Show 40 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 24, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 24, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 24, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 24, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 24, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 24, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 24, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 24, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 15, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 15, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 15, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 15, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 15, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 15, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 25, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 25, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 25, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 25, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 25, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 25, 2014

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 9, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 9, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 9, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 9, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 9, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 9, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 3, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 27, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 27, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 23, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 23, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 23, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 23, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 4, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 4, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 4, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 4, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 4, 2010

    Dob violation - resolved

ECB violations · 76

  • Class - 2

    Work contrary to plans:scaffolds have extended net above guardrail system not on plans, 1m platform installed-not as per manufacturers specification-no design drawing, lifeline/tieback anchors bolts installed

    Sep 4, 2025

    Resolve
  • Class - 1

    Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips)report documenting the conditions of psid#m0000

    Oct 1, 2024 · Penalty $625

    Active
  • Class - 3

    Electrical work without permit. at time of inspection, observed electrical bx cable being installed from ceiling light and connected to a electrical switch on the living room wall and continued to existing outl

    Mar 4, 2024

    Resolve
  • Class - 1

    Work contrary to swo. at the time of comp inspecion i observed tile worker in apt 1721 doing active construction work in bathroom stop work issued on 7-7-20 by badge #3149 violation number 35481513n for failu

    Oct 23, 2020

    Resolve
  • Class - 1

    Ac2810484-inadequate tenant protection plan.at time of inspection,observed work under aformentioned job number.the submitted tpp lacks specific means and methods of protecting tenants on the fire safety & healt

    Aug 10, 2020 · Penalty $6,250

    Resolve
  • Class - 2

    Failure to file cert of correction note: failure to comply with the commisisoners order to file a cert of correction for violation (#35256575h) with the dept of buildings.rem: file a cert of correction

    Jul 16, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to file a cert of correction note: failure to comply with the commissioners order to file a cert of correction for violation (#35256472p) with the dept of bldg.rem: file a cert of correction

    Jul 16, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to file cert of correction note: failure to comply with the commissioners order tof ile a cert of correction for vioaltion(#3526473r) with the dept of buildingsrem: file a cert of correction.

    Jul 16, 2020 · Penalty $6,250

    Active
  • Class - 2

    Failure to file cert of correction.note: failure to comply with the commissioners order to file a cert of ocrrection for violation (#35256576j) with the department of bldgs.rem: file a cert of correction

    Jul 16, 2020 · Penalty $3,125

    Resolve
  • Class - 1

    Failure to safeguard all person & property affected by construction operations. note: at time of my inspection a 15 sty bldg,i observed construction work in progress in the living room & bathroom of apt #1721

    Jul 7, 2020

    Resolve
Show 40 more ↓
  • Class - 2

    Failure to distribute or post a notice of tenant protection plans tpp. noted work occurring under permit #'s 123892886 and 140907197 and no tpp distributed or posted in partially multiple dwelling at time of in

    Jun 29, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to distribute or post a notice of the safe construction bill of rights in accordance with the housing and maintenance code section 27-2009.2b1. noted work occurring under under permits 123892886 and 140

    Jun 29, 2020 · Penalty $1,250

    Active
  • Class - 1

    Filed a certification form, application etc. containing a material false statement. noted: the owner/representative made false certification on section# 26 of pwi job application# 120843659 which was filed on 1

    Nov 1, 2017 · Penalty $4,800

    Resolve
  • Class - 1

    Filed a certificate form application etc containing a material false statement. noted: the owner/representative made false certification on section# 26 of pwi job application# 122279079 which was filed on 2/10/

    Nov 1, 2017 · Penalty $4,800

    Active
  • Class - 1

    Filed a certification form, application etc containing a material false statement. noted: the owner/representation made false certification on section# 26 of pwi job application# 121070081 which was filed on 10

    Nov 1, 2017 · Penalty $4,800

    Resolve
  • Class - 1

    File a certification form application etc containing a material false statement. noted: the owner/representative made false certification on section# 26 of pwi job application# 121468447 which was filed on 9/18

    Nov 1, 2017 · Penalty $4,800

    Resolve
  • Class - 1

    File a certification form application etc containing a false statement. noted: the owner/representative made false certification on section# 26 of pwi job application# 121568295 which was filed on 7/17/2013 by

    Nov 1, 2017 · Penalty $4,800

    Active
  • Class - 1

    Filed a certification form, application etc containing a material false statement. noted: the owner/representative made false certification on section# 26 of pwi job application# 122211203 which was filed on 1/

    Nov 1, 2017 · Penalty $4,800

    Resolve
  • Class - 1

    File a certification form, application etc containing a material falsestatement. note: the owner/representative made false certification on section# 26 of pwi job application# 120785695 which was filed on 8/10/

    Nov 1, 2017 · Penalty $4,800

    Active
  • Class - 1

    File a certificate form application etc containing a material false statement. noted: the owner/representative made false certification on section# 26 of pwi job application# 122406903 which was filed on 9/8/15

    Nov 1, 2017 · Penalty $2,400

    Resolve
  • Class - 1

    File a certificate form, application etc containing a material false statement. noted: the owner/representative made false certification on section# 26 of pwi job application# 140360552 which was filed on 6/15/

    Nov 1, 2017 · Penalty $2,400

    Resolve
  • Class - 2

    Sec. 3307.10 failure to remove part of pedestrian protection to facilitate city work. noted: at time of inspection respodent failed to remove sidewalk shed on north west corner for sidewalk repair scheduled by

    Nov 1, 2017

    Resolve
  • Class - 1

    Filed a certificate form,application,etc containing a material false statements. noted: the owner/representative made false certification on6-15-17 by checking marking"no"for both "owners certification regardin

    Oct 17, 2017 · Penalty $2,400

    Resolve
  • Class - 1

    Sec: 3314.5. platform. all working levels of a scaffold shall be fully planked. note: @ time insp observed workers working on several supported scaffold on roof level w/ working levels of supported scaffold not

    May 23, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Built in accordance w/ plan. all equipment must be installed as per cd-5/approved plan. note: @ time of insp observed several installed in used suspended scaffold that is contrary to the approved cd-5. (a)the i

    May 23, 2017 · Penalty $250

    Resolve
  • Class - 1

    Storage. unsafe storage of materials during construction or demolition. note @ time insp observed active construction site w/ unsafe storage of construction materials & construction debris on bldg roof level. r

    May 23, 2017 · Penalty $2,400

    Resolve
  • Class - 2

    Site condition. condition of site has to be in conformance w/ ssp. note: @ time of insp observed active site that is contrary to the site safety plan. (1)occupying of 1 lane of the street on east 86 st & east 8

    May 23, 2017 · Penalty $400

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction. note: @ time of insp observed active construction site w/ no parapet wall on place on roof level. rope & netting is installed as tall protec

    May 23, 2017 · Penalty $10,000

    Resolve
  • Class - 1

    Sec: 3314.10.9. horizontal tieback- single angle tie back installed in angle is prohibited. opposing angle tie back shall be installed. note: @ time of insp observed suspended scaffold installed on exp#4 w/ tie

    May 23, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3314.11.5/suspended scaffold welding precautions.note:at time of inspection i observed on going welding activities on suspended scaffold on expo#4 that does not comply to the welding precaution on a suspended

    Apr 12, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Approved drawings on site.approved drawings are.required to be on siteavailable at inspector commissioners request.note:at time of inspection i observed several suspended scaffold available at site.

    Apr 12, 2017

    Resolve
  • Class - 1

    Bc3314.15.2/stirrups;stirrups are to be installed as per manufacturersspecification.note:at time of inspection i observed several suspended scaffold an used with stirrups of suspended scaffold not installed as

    Apr 12, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Unlawful act.failure to comply to an order of the commissioners.note:at time of inspection i observed proof of welding activities on suspended scaffold on exposure #4 and that is failure to comply to an order o

    Apr 12, 2017 · Penalty $2,400

    Resolve
  • Class - 2

    Job signs project information panel sidewalk;shed parapet panel construction sign not provided or in compliance with section.note:at time ofinspection i observed sidewalk shed in place on expo#1 with no jobsite

    Apr 7, 2017

    Resolve
  • Class - 2

    Painted hunter green.sidewalk shed does not meet code specification.note:at time of inspection i observed sidewalk shed in place on exp#1 with sidewalk shed parapet not painted hunter green several sidewalk she

    Apr 7, 2017

    Resolve
  • Class - 2

    Pedestrian protection does not code specifications.note:at time of inspection i observed sidewalk shed overhead protection in place on expo#4 with excessive storage of construction debris and construction mater

    Apr 7, 2017

    Resolve
  • Class - 2

    Sec. 3314.4.3.1.1. failed to provide proof of parapet wall inspection.noted: at time of inspection parapet clamps are used for tiebacks. no proof or parapet wall inspection is provided. remedy: provide proof of

    Mar 22, 2016

    Resolve
  • Class - 2

    Sec. 3310.4 failure to comply w/site safety monotoring program. noted:at time of inspection no proof of safety inspection of the site done by site safety manager prior to commencement of the project. remedy pro

    Mar 22, 2016

    Resolve
  • Class - 2

    42d06,61j01,39o02,39x10,77x10,25h11.(42d)tighten wire contacts where needed.(61j)not in line of sight of hoist machine.(39,77x)light.(25h)place where needed.

    Oct 24, 2011 · Penalty $250

    Resolve
  • Class - 2

    42n09,61g11,39o02,16h11,67x10,76m07,53b14,05d06,17d06.(42n)by passed fuse.(61g)unreadable fuses.(39o)clean.(16h)rollers where needed.(67x)repair.(76m)wind-up key.(53b)shorten.(17d)secure where needed.

    Oct 24, 2011 · Penalty $250

    Resolve
  • Class - 2

    21-b-07/12-q-03/42-g-07/21-provide fire rated wire for all dr locks/12-provide guard for car light in cab/42-use proper fuses on main controller

    Dec 7, 2009

    Resolve
  • Class - 2

    Failed to notify department of building prior the installation of outrigger beams in connection w/"susp" scaffolds. notification expired on 10/7/08. remedy: notify department of building.

    Oct 21, 2008

    Resolve
  • Class - 2

    Failed to clean sidewalk shed roof daily. observed sidewalk shed roof w/debris,materials,sand,cement and metals. remedy: keep sidewalk shed roof clean.

    Oct 21, 2008 · Penalty $4,000

    Resolve
  • Class - 2

    04w07.21b10.21q,m 03.07.100m07.34b09.80b10.68m07.04w07 top emeergency exit lock 21b10 h locks d/l interlocks shake or pull door elevator will stop check all fl's 21q,m3,7 interlocks missing 7 secure screws miss

    Sep 24, 2008 · Penalty $500

    Resolve
  • Class - 2

    52b14.52b14 hoist ropes need shorten ct/w to buffer

    Sep 24, 2008

    Resolve
  • Class - 1

    Licensed rigger failed to ensure scaffold worker met minimum requirements. no certificates of fitness for workers utilizing scaffold. remedycomply with code.

    Jul 18, 2008 · Penalty $1,600

    Resolve
  • Class - 1

    Rigger failed to name a designated foreman. no designated foreman availivable at site at time of inspection.

    Jul 18, 2008 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans at job at time of inspection. cd-5 not available for inspection at time of inspection at the of inspection. remedy: provide plans.

    Jul 18, 2008 · Penalty $500

    Resolve
  • Non-hazardous

    83-l-10/(83-l-10) elevator not working defective repair/restore to service so that proper insp may be performed by dob inspector.

    Apr 24, 2006

    Resolve
  • Non-hazardous

    83-x-10/83-restore to service for proper inspection.

    Apr 10, 2006

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Dec 9, 2025 · Apt 420

    Close
  • Appliance

    Refrigerator

    Apr 23, 2025 · Apt 326

    Close
  • General

    Cabinet

    Apr 23, 2025 · Apt 326

    Close
  • Plumbing

    Bathtub/shower

    Apr 23, 2025 · Apt 326

    Close
  • Unsanitary condition

    Pests

    Apr 23, 2025 · Apt 326

    Close
  • Paint/plaster

    Wall

    Apr 23, 2025 · Apt 326

    Close
  • Flooring/stairs

    Floor

    Apr 23, 2025 · Apt 326

    Close
  • Unsanitary condition

    Mold

    Apr 23, 2025 · Apt 326

    Close
  • Appliance

    Electric/gas range

    Apr 23, 2025 · Apt 326

    Close
  • Paint/plaster

    Ceiling

    Nov 20, 2024 · Apt 437

    Close
Show 40 more ↓
  • Door/window

    Door

    Nov 20, 2024 · Apt 437

    Close
  • Unsanitary condition

    Mold

    Nov 20, 2024 · Apt 437

    Close
  • Plumbing

    Bathtub/shower

    May 2, 2024 · Apt 1717

    Close
  • General

    Cabinet

    May 2, 2024 · Apt 1717

    Close
  • Plumbing

    Water supply

    May 2, 2024 · Apt 1717

    Close
  • Paint/plaster

    Wall

    Jun 9, 2023 · Apt 731

    Close
  • Water leak

    Heavy flow

    Jun 9, 2023 · Apt 731

    Close
  • Heat/hot water

    Entire building

    Oct 20, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 20, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 2, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 1, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 1, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2022 · Apt BLDG

    Close
  • General

    Cooking gas

    Oct 6, 2020 · Apt 1229

    Close
  • General

    Cooking gas

    Aug 27, 2020 · Apt 1000

    Close
  • Heat/hot water

    Entire building

    May 14, 2019 · Apt 236

    Close
  • Flooring/stairs

    Floor

    Apr 1, 2019 · Apt 403

    Close
  • Unsanitary condition

    Pests

    Apr 1, 2019 · Apt 403

    Close
  • Unsanitary condition

    Mold

    Apr 1, 2019 · Apt 403

    Close
  • Plumbing

    Toilet

    Nov 25, 2018 · Apt 201

    Close
  • Unsanitary condition

    Sewage

    Nov 25, 2018 · Apt 201

    Close
  • Heat/hot water

    Apartment only

    Oct 14, 2018 · Apt 328

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2018 · Apt 328

    Close
  • Water leak

    Damp spot

    May 25, 2018 · Apt 839

    Close
  • Unsanitary condition

    Pests

    May 25, 2018 · Apt 839

    Close
  • Safety

    Window guard broken/missing

    Oct 23, 2017 · Apt 6C

    Close
  • Outside building

    Roof door/hatch

    Apr 22, 2017 · Apt 17

    Close
  • Door/window

    Window frame

    Mar 30, 2017 · Apt 1109

    Close
  • Unsanitary condition

    Mold

    Mar 30, 2017 · Apt 1109

    Close
  • Appliance

    Refrigerator

    Mar 30, 2017 · Apt 1109

    Close
  • Plumbing

    Toilet

    Mar 30, 2017 · Apt 1109

    Close
  • Unsanitary condition

    Mold

    Mar 30, 2017 · Apt 1109

    Close
  • Plumbing

    Bathtub/shower

    Mar 30, 2017 · Apt 1109

    Close
  • Appliance

    Electric/gas range

    Mar 30, 2017 · Apt 1109

    Close
  • Heat/hot water

    Entire building

    Feb 23, 2017 · Apt 1625

    Close
  • Plumbing

    Water supply

    Feb 23, 2017 · Apt 1625

    Close
  • Unsanitary condition

    Mold

    Feb 8, 2017 · Apt 1109

    Close
  • Unsanitary condition

    Mold

    Feb 8, 2017 · Apt 1109

    Close
  • Plumbing

    Toilet

    Feb 8, 2017 · Apt 1109

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
1923
Floors
15
Residential units
343
Building area
472,600 ft²
Lot area
44,953 ft²
Zoning
C5-1
Community board
108
Council district
4
Block / lot
1497 / 9
Assessed value
$56,947,950
Landmark / historic district
No

HPD registration #118967, last renewed Oct 14, 2025.

Questions about 1150 Madison Avenue

Who owns 1150 Madison Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 12 East 86th Streetllc.

Does 1150 Madison Avenue have violations?

Yes. NYC HPD has recorded 36 housing violations at this property.

Is 1150 Madison Avenue rent stabilized?

NYC Department of Finance tax bills listed 118 rent-stabilized units here in 2024 (about 34% of its 343 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 1150 Madison Avenue built?

City records list 1923 as the year it was built.

How many apartments are in 1150 Madison Avenue?

It has 343 residential units and 360 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.