Owner of record: D'agostino, Jane
170 East 61 Street is a store building built in 1910 in Manhattan, 10065. The owner of record is D'agostino, Jane. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 27
- ECB violations
- 22
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 27
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 22, 2021
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - active
Show 17 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Aug 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 25, 2013
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2012
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 4, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 14, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 18, 2008
Dob violation - resolved - Emergency power none
Ll2604e-emergency power none
Mar 31, 2008
Dob violation - active - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 8, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2004
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - active - Facade facade optional
Ll1080-local law 10/80 - facade facade optional
Jul 1, 1992
Dob violation - active
ECB violations · 22
- Class - 1
Burnham boiler model 5019n and aosmith boiler model hw300 were installed without a boiler permit.
May 9, 2024
Resolve - Class - 2
Ao smith boiler model hw300 is not registered. register boiler.
May 9, 2024
Resolve - Class - 2
Burnham boiler model 5019n is not registered. register boiler.
May 9, 2024
Resolve - Class - 2
Failure to submit an acceptable required cycle 7a and 8a report of critical examination documenting condition of exterior wall and appurtannces required by 28-302.4 for control #805006 agg2 history of noncompli
May 20, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation #35344903h issued on 9/24/2018, and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptible cert
Jul 10, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building and appurtenances. roof ending on the roof. roof soft. exterior door (stairwell bulkhead) defective. termination at coping not complete (i.e. west window) north elev exp1
Sep 24, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control#805006. remedy: submit required technical report
May 18, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4. agg2 history of noncompliance on 36027934h (agg1), 36027714x.
Aug 11, 2016 · Penalty $1,000
Resolve - Class - 2
Failure to maintain exterior bldg north elev. exp 1-horizontal/verticles in facade flrs 3,4,5,6,7, a/c grills rusting/missing east elev. exp2 horizontal cracks in facade west elev. exp 3 horizontal/verticle cra
May 24, 2016 · Penalty $530
Resolve - Class - 2
Failure to maintain exterior building roof-parapet verticle and horizontal cracking stairwell bulkhead-metal coping not secure north elev.exp 1-horizontal cracking in facade-floors 3,4,5,6,7 cracking at window
Dec 21, 2015 · Penalty $500
Resolve
Show 12 more ↓
- Class - 2
Failure to file an acceptable technical report in compliance w/code provisions:periodic insp of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.rem:file the required r
Sep 15, 2015 · Penalty $2,000
Resolve - Class - 2
Failure to maintain exterior bldg.north elevation exp1 cracking in masonry @ 3rd,5th fl,bulging masonry on several fls.west elevation exp4 vertical & horizontal cracking in masonry.rem maintain exterior bldg pr
Sep 3, 2015
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
May 21, 2015 · Penalty $2,000
Resolve - Class - 2
Failuer to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Apr 21, 2014 · Penalty $2,000
Resolve - Class - 2
Failure to file an architect/engineer report certifying exit/directional signs are connected to emergency power source/storage battery equipment.rem:file architect/engineer report
Jan 27, 2010 · Penalty $4,000
Resolve - Class - 2
Failure to submit an acceptable 6 round tech.report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances asrequired by article 28.302 & the dept. of bldgs rules & regulations.
Dec 12, 2008 · Penalty $800
Resolve - Non-hazardous
Failure to submit a fifth round technical report in compliance with code provisions: periodic inspection of exterior walls and appurtenancesas required by local law 11 of 1998 and the dob rules and regulations
Nov 12, 2004 · Penalty $1,750
Resolve - Non-hazardous
Failure to submit a fifth round technical report:periodic inspection of exteriror walls and appurtenances as required by local law 11 of 19 98 and the department of buildings rules and regulations .remedy:file
Jun 25, 2004 · Penalty $1,750
Resolve - Non-hazardous
Failure to submit a fifth round technical report:periodic inspection of exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and regulations.remedy:file th
Mar 31, 2004 · Penalty $700
Resolve - Non-hazardous
36t16,37a11,43u16,43y14,35d6. 36-mark motor room door. 37-properly wire controller. 43-2 year test. 43-oil leak. 35-secure smoke hole in motor room.
Aug 25, 1999
Resolve - Non-hazardous
37n, 43y, 37- mount realy & transformer to controller and removed jumper from relay 43- clean oil under pump unit and remove empty cans & replace missing covers.
Dec 7, 1995 · Penalty $500
Resolve - Hazardous
Failure to submit a third round technical report: periodic inspection of exterior wall and appurtenances as required by local law 10 of 1980 and the department of building rules and regulatioins. remedy: file t
Jul 19, 1994 · Penalty $400
Resolve
Complaints
- Heat/hot water
Entire building
Nov 7, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1910
- Floors
- 7
- Residential units
- —
- Building area
- 11,700 ft²
- Lot area
- 1,508 ft²
- Zoning
- C1-9
- Community board
- 108
- Council district
- 4
- Block / lot
- 1395 / 41
- Assessed value
- $2,647,350
- Landmark / historic district
- No
Questions about 170 East 61 Street
Who owns 170 East 61 Street?
The owner of record in NYC Department of City Planning PLUTO data is D'agostino, Jane.
Does 170 East 61 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 170 East 61 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 170 East 61 Street built?
City records list 1910 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.