40 East 66 Street
Manhattan, NY 10065BBL 1-01380-7501Map
Owner of record: The 40 East 66th St Condominium
40 East 66 Street is a condominium built in 1929 in Manhattan, 10065. It has 32 residential units across 13 floors. The owner of record is The 40 East 66th St Condominium. HPD has recorded 1 housing violation here, most recently on January 14, 2008. 1 of the 1 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 1
- DOB violations
- 16
- ECB violations
- 28
- HPD complaints
- 10
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- BHazardous
Properly repair the broken or defective counter balance at lower sash window in the 3rd room from north located at apt 7c, 7th story, 1st apartment from east at south
Jan 14, 2008 · Apt 7C
Open — Nov sent out
DOB building violations · 16
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 5, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 5, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 5, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2010
Dob violation - resolved
Show 6 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 6, 2001
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 6, 2001
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 6, 2001
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 6, 2001
Dob violation - resolved
ECB violations · 28
- Class - 1
In response to incident where worker got injured i observed metal door frame header that fell and hit worker in head causing injury that required staples. issued 1 ecb and swo for failure to maintain safety mea
Jul 27, 2022
Resolve - Class - 2
Pedestrian protection doesnt meet code spec note:atoi observed hd sws on exp1&4,pedestrian walking under that sws.also observed exposed lifeelectrical wire from cellar to sws top thru sws pipe column.creating e
May 25, 2021 · Penalty $2,400
Resolve - Class - 2
Bc1704.3 structural steel note:atoi observed alt type work for structural work in progress@penthouse&roof.worker working on it.also observedthey did structural steel (column,beam) welding (bc1704.3.1) structura
May 25, 2021
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements at th etime of my inspection on an active job site i observed that the permit holder failed to maintain adequate housekeeping which was seen o
Apr 29, 2021
Resolve - Class - 1
Bc3301.6-temporary platform (o design drawings) at th etime of my inspection i observed active construction site on the penthouse level 14 workers on site workers are temprary platform on the way to supported
Jul 22, 2020 · Penalty $625
Resolve - Class - 2
Failure to distribute or port notice of tenant protetcion plan at the time of inspection an active construction site on penthouse level i observed missing tenant protetction plan tenant protetction plan tenant
Jul 22, 2020
Resolve - Class - 1
Work does not conform to approved construction documents an d/or approved amendmnets at the time of inspection i observed active construction site workers removed debris from penthosue apartment debris and garb
Jul 22, 2020 · Penalty $625
Resolve - Class - 2
Failure to post or distribute safe cosntrcution bill of rights at the time of inspection i observed active construction job at 15 story building enthouse level also observed that safe construction bill of right
Jul 22, 2020
Resolve - Class - 2
3314.4.3.3-failure to provide information inspection report for supported scaffold at the time of inspection i observed active construction site at penthouse level sws and supproted scaffold in place upon reque
Jul 22, 2020
Resolve - Class - 1
3301.7 failure to maintain/display on site drawings/documents requiredby chapter 33(no design drawings for working platform-temporary support-pulley). at time of inspection on an active jobsite of an existing 1
Nov 15, 2019 · Penalty $625
Resolve
Show 18 more ↓
- Class - 1
3309.10 inadequate and missing roof protection. at time of inspection on an active jobsite of an existing 13 story building,observed that roof protection missing at adjoining property at exp#2. work in progress
Nov 15, 2019 · Penalty $2,500
Resolve - Class - 2
Pedestrian protection does not meet code specifications. at time of inspection on an active jobsite of an existing 13 story building,observed a sidewalk shed(sws) installed at exp#1&4. the sws lacked the requir
Nov 15, 2019 · Penalty $2,400
Resolve - Class - 2
3314.4.3 failure to maintain daily log inspection book(pipe scaffold-stair tower). at time of inspection on an active jobsite of an existing13 story building,observed pipe scaffold w/ enclosed at penthouse and
Nov 15, 2019
Resolve - Class - 1
3314.4.8 failure to maintain scaffold as per code subsection. at time of inspection on an existing 13 story building,observed pipe scaffold w/ plywood enclosed at penthouse and roof level erected,approx 18' in
Nov 15, 2019 · Penalty $2,500
Resolve - Class - 1
28-110.1 inadequate site safety plan(ssp). at time of inspection on anactive jobsite of an existing 13 story building,observed work in progress at penthouse and roof level. amended site safety plan ssp-011.00 d
Nov 15, 2019 · Penalty $625
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments. at time of inspection on an active jobsite of an existing 13 story building,observed pipe scaffold w/ plywood enclosed at pen
Nov 15, 2019 · Penalty $625
Resolve - Class - 1
Failure to institute/maintain safety equipment measures of temporary construction-no guard rails. at time of inspection on an active jobsiteof an existing 13 story building,observed guard rails missing at roof
Nov 15, 2019
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. attime of inspection on an active jobsite of an existing 13 story building,observed inadequate housekeeping consisting of large amounts of deb
Nov 15, 2019 · Penalty $625
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guardrails. alt2 13 sty occupied bldg-facade work. at the time of my inspection i observed that there was no guardrails syste
Feb 28, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction-overhead protection. alt2 13 sty occupied bldg at the time of my inspection i observed that there was no overhead protection in place for the
Feb 28, 2019
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. alt2 13 sty occupied bldg-facade work. at the time of my inspection i observed jobsite areas on roof,bulkhead & balconies was not being kept
Feb 28, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to perform safe proper inspection of 3314.4.3.2;3314.4.3.1 suspended scaffold pre & post installation inspection. alt-2 13 sty occupied bldg-facade work. at the time of my inspection i observed outrigge
Feb 28, 2019 · Penalty $625
Resolve - Class - 1
Sec. 3309.10 failure to protect or adequately protect adjoining properties during construction or demo operation-roof protection. alt-2 13 sty occupied bldg facade work. at the time of my inspection i observed
Feb 28, 2019 · Penalty $2,500
Resolve - Class - 2
Respondent failed to prope notification for mobile crane after may 1 2018 to the department.mobile crane cn#28/18 departed from 40 east 66thstreet but did not notify the dept of it departure.rem:notify the dept
Dec 20, 2018 · Penalty $2,500
Resolve - Non-hazardous
Failure to provide a system of automatic sprinklers where required up physical inspection of cellar basement found in laundry room where there are 3 clothes dryers there are no sprinkler at location remedy:
Mar 15, 2008 · Penalty $400
Resolve - Non-hazardous
Failure to maintain plumbing and or appuretenances upon physical inspection found gas appliances in laundry room not having solid conn (flexible comm) in a comm bldg remedy: maintain plumbing work and or
Mar 15, 2008 · Penalty $800
Resolve - Non-hazardous
Failure to provide approved plans @ premises @ time of inspection. as noted: 12 stories bldg under alt: however there are no approved plans available @ time of inspection demo & installation of new plumbing
Aug 31, 2007 · Penalty $2,500
Resolve - Hazardous
Plumbing work w/o permit. as noted: 12 stories bldg under alt w/ permit #104746777. installation of new plumbing pipe on 4th flr in progressthere is no plumbing permit available as per dob record. remedy: stop
Aug 31, 2007 · Penalty $1,000
Resolve
Complaints
- Plumbing
Basin/sink
Apr 15, 2026 · Apt 6B
Close - Safety
Window guard broken/missing
Apr 15, 2026 · Apt 6B
Close - Unsanitary condition
Mold
Jan 3, 2024 · Apt 2C
Close - Nonconst
Vermin
Mar 27, 2009 · Apt 5C
Close - Electric
Wiring
Mar 27, 2009 · Apt 5C
Close - General
Mold
Dec 13, 2007 · Apt 7C
Close - General
Mold
Nov 30, 2007 · Apt 7C
Close - General
Windows
Nov 30, 2007 · Apt 7C
Close - Construction
Elevator
Nov 30, 2007 · Apt 7C
Close - Plumbing
Radiator
Jan 17, 2007 · Apt 9B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1929
- Floors
- 13
- Residential units
- 32
- Building area
- 97,890 ft²
- Lot area
- 10,041 ft²
- Zoning
- C5-1
- Community board
- 108
- Council district
- 4
- Block / lot
- 1380 / 7501
- Assessed value
- $33,461,999
- Landmark / historic district
- Upper East Side Historic District
HPD registration #101739, last renewed Jul 24, 2026.
Questions about 40 East 66 Street
Who owns 40 East 66 Street?
The owner of record in NYC Department of City Planning PLUTO data is The 40 East 66th St Condominium.
Does 40 East 66 Street have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 40 East 66 Street rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 9% of its 32 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 40 East 66 Street built?
City records list 1929 as the year it was built.
How many apartments are in 40 East 66 Street?
It has 32 residential units and 33 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.