325 East 54 Street
Manhattan, NY 10022BBL 1-01347-0012Map
Owner of record: 325-327 E 54 Realty, LLC
325 East 54 Street is a walk-up apartment building built in 1926 in Manhattan, 10022. It has 40 residential units across 5 floors. The owner of record is 325-327 E 54 Realty, LLC. HPD has recorded 22 housing violations here, most recently on August 19, 2024. City tax records listed 22 rent-stabilized apartments here in 2024.
- HPD violations
- 22
- DOB violations
- 3
- ECB violations
- 9
- HPD complaints
- 41
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt d, 1st story, 1st apartment from west at north
Aug 19, 2024 · Apt D
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt d, 1st story, 1st apartment from west at north
Aug 19, 2024 · Apt D
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt d, 1st story, 1st apartment from west at north
Aug 19, 2024 · Apt D
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt d, 1st story, 1st apartment from west at north
Aug 19, 2024 · Apt D
Closed — Violation dismissed - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at public hall, 1st story
Aug 19, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to yard in the 1st room from north located at apt d, 1st story, 1st apartment from west at north
Aug 19, 2024 · Apt D
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on balcony of fire escape at building front at fire escape, 2nd story
Jul 31, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame leading to rear yard in the 1st room from north located at apt d, 1st story, 1st apartment from west at north
Apr 10, 2024 · Apt D
Closed — Violation dismissed - ANon-hazardous
Refit door leading to rear yard in the 1st room from north located at apt d, 1st story, 1st apartment from west at north
Apr 10, 2024 · Apt D
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective hard wood floor in the 1st room from north located at apt d, 1st story, 1st apartment from west at north
Apr 10, 2024 · Apt D
Closed — Violation dismissed
Show 12 more ↓
- ANon-hazardous
Properly repair with similar material the broken or defective hard wood floor in the private hallway located at apt d, 1st story, 1st apartment from west at north
Apr 10, 2024 · Apt D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame in the entrance located at apt d, 1st story, 1st apartment from west at north
Apr 10, 2024 · Apt D
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of radiator at public hall, 1st story
Apr 10, 2024
Closed — Violation dismissed - ANon-hazardous
Refit door in the entrance located at apt d, 1st story, 1st apartment from west at north
Apr 10, 2024 · Apt D
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt d, 1st story, 1st apartment from west at north
Apr 10, 2024 · Apt D
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt d, 1st story, 1st apartment from west at north
Apr 10, 2024 · Apt D
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2d, 3rd story, 1st apartment from west at north
Jul 21, 2022 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2d, 3rd story, 1st apartment from west at north
Jul 21, 2022 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 3rd story
Jul 21, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Jul 21, 2022
Closed — Violation dismissed - ANon-hazardous
Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Oct 28, 2015
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Oct 28, 2015
Closed — Violation dismissed
DOB building violations · 3
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Zoning none
Z-zoning none
Nov 16, 2000
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 16, 2000
Dob violation - dismissed
ECB violations · 9
- Class - 1
Failure to maintain buildind in code-compliant manner. failure to provide number of required means of egress for every floor per bc1018.1 and 27-366 for transient use in apartment 2d. remedy: discontinue illega
Oct 2, 2023
Resolve - Class - 1
Bc907.2.8 failure to provide a fire alarm system for transient use in apartment 2d. remedy: discontinue illegal use.
Oct 2, 2023
Resolve - Class - 2
Permanent dwelling used/converted for other than permanent-resident purposes. department of building records indicates building to be legally approved as a class a multiple dwelling. now apartment 20(2nd floor)
Oct 2, 2023
Resolve - Class - 1
Failure to maintain building in code-compliant manner. lack of a automatic sprinkler system where is required as bc903.2 and 27-954 for transient use in apartment 2d. remedy: discontinue illegal use.
Oct 2, 2023
Resolve - Class - 2
Failure to comply with commissioners order contained in summons/violation #35454941x issued on 10-31-2019, and to file a certificat eof correction pursuant to 28.201.1 and 1rcny 102-01.no c of c on file compy w
Dec 14, 2019
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. illumination for exits,exit discharges & public corridors per bc 1006.1;27-381 at emergency exit illuminated on 5th fl not operable at time of inspection.
Oct 31, 2019
Resolve - Class - 1
Failure to maintain bldg in code compliant manner;use of prohibited door &/or hardware per bc 1008.1.8;27-371(j)at bulkhead from inside a sliding bolt attached to door prevent fdny from access to bldg from roof
Oct 31, 2019
Resolve - Class - 1
Fail to maintain bldg in code compliant manner: illumination for exits,exit discharges & public corridors per bc 1006.1;27-381 illuminated exit lights on 1st,2nd & 5th fl are not operable at time of inspection.
Oct 31, 2019
Resolve - Class - 1
Failure to maintain bldg in code compliant manners: use of prohibited door &/or hardware per bc 1008.1.8;27-371(j)at bulkhead from inside slide bolt on door lock prevent fdny prom enter to bldg from roof. note
Oct 31, 2019
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Feb 26, 2025 · Apt D
Close - Unsanitary condition
Garbage/recycling storage
Aug 13, 2024 · Apt D
Close - Flooring/stairs
Floor
Aug 13, 2024 · Apt D
Close - Door/window
Door
Aug 13, 2024 · Apt D
Close - Plumbing
Basin/sink
Aug 13, 2024 · Apt D
Close - Plumbing
Toilet
Aug 13, 2024 · Apt D
Close - Door/window
Door frame
Jul 16, 2024 · Apt D
Close - Plumbing
Water supply
Jul 10, 2024 · Apt D
Close - Door/window
Door
Jul 10, 2024 · Apt D
Close - Door/window
Door
Jul 10, 2024 · Apt D
Close
Show 31 more ↓
- Appliance
Refrigerator
Nov 27, 2023 · Apt D
Close - Plumbing
Basin/sink
Nov 27, 2023 · Apt D
Close - Door/window
Door
Nov 27, 2023 · Apt D
Close - Paint/plaster
Ceiling
Nov 13, 2022 · Apt BASEME
Close - Paint/plaster
Ceiling
Jul 19, 2022 · Apt 2D
Close - Electric
No lighting
Aug 28, 2021 · Apt 1A
Close - Electric
Lighting
Jan 29, 2021 · Apt 2C
Close - Water leak
Slow leak
Jan 29, 2021 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 23, 2021 · Apt 1A
Close - Door/window
Door
Dec 9, 2020 · Apt 1A
Close - Plumbing
Basin/sink
Dec 9, 2020 · Apt 1A
Close - Plumbing
Bathtub/shower
Dec 9, 2020 · Apt 1A
Close - Flooring/stairs
Floor
Dec 9, 2020 · Apt 1A
Close - Heat/hot water
Entire building
Jun 14, 2016 · Apt A
Close - Heat/hot water
Entire building
Jun 13, 2016 · Apt 1
Close - Heat/hot water
Entire building
Jun 11, 2016 · Apt 2B
Close - Heat/hot water
Entire building
May 18, 2016 · Apt 4B
Close - Heat/hot water
Entire building
May 5, 2016 · Apt 1D
Close - Appliance
Refrigerator
Feb 18, 2016 · Apt C
Close - Heat/hot water
Entire building
Feb 3, 2016 · Apt 2C
Close - Heat/hot water
Entire building
Jan 22, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2016 · Apt 2D
Close - Heat/hot water
Entire building
Jan 21, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 19, 2015 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 18, 2015 · Apt A
Close - Heat/hot water
Apartment only
Oct 25, 2015 · Apt 3B
Close - Paint/plaster
Wall
Nov 21, 2006 · Apt C
Close - Plumbing
Radiator
Nov 21, 2006 · Apt C
Close - General
Mold
Apr 28, 2005 · Apt 2D
Close - Plumbing
Water-leaks
Apr 28, 2005 · Apt 2D
Close - Heating
Heat related
Jan 16, 2004 · Apt B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1926
- Floors
- 5
- Residential units
- 40
- Building area
- 16,900 ft²
- Lot area
- 4,853 ft²
- Zoning
- R8B
- Community board
- 106
- Council district
- 4
- Block / lot
- 1347 / 12
- Assessed value
- $2,345,850
- Landmark / historic district
- No
HPD registration #132368, last renewed Jul 27, 2026.
Questions about 325 East 54 Street
Who owns 325 East 54 Street?
The owner of record in NYC Department of City Planning PLUTO data is 325-327 E 54 Realty, LLC.
Does 325 East 54 Street have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 325 East 54 Street rent stabilized?
NYC Department of Finance tax bills listed 22 rent-stabilized units here in 2024 (about 55% of its 40 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 325 East 54 Street built?
City records list 1926 as the year it was built.
How many apartments are in 325 East 54 Street?
It has 40 residential units and 41 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.