roofy

330 East 52 Street

Manhattan, NY 10022BBL 1-01344-0036Map

Owner of record: Redrock Manager Fo LLC

330 East 52 Street is an elevator apartment building built in 1927 in Manhattan, 10022. It has 40 residential units across 6 floors. The owner of record is Redrock Manager Fo LLC. HPD has recorded 121 housing violations here, most recently on September 8, 2026. 30 of the 50 most recent violations are still open. City tax records listed 9 rent-stabilized apartments here in 2024.

HPD violations
121
DOB violations
19
ECB violations
2
HPD complaints
93

What to know

Concern
12 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 8, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
9
About 23% of the building's 40 apartments
Up from 8 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 121

  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the foyer located at apt 42, 4th story, 2nd apartment from east at south

    Sep 8, 2026 · Apt 42

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from west at north wall door frame, 1st door frame from south at west wall in the private hallway located at apt 42, 4th story, 2nd apartment from east at south

    Sep 8, 2026 · Apt 42

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, west wall in the private hallway located at apt 42, 4th story, 2nd apartment from east at south

    Sep 8, 2026 · Apt 42

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the bathroom located at apt 42, 4th story, 2nd apartment from east at south

    Sep 8, 2026 · Apt 42

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st door from south at west wall, 1st window frame from east at south wall in the 1st room from east located at apt 42, 4th story, 2nd apartment from east at south

    Sep 8, 2026 · Apt 42

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, east wall in the foyer located at apt 42, 4th story, 2nd apartment from east at south

    Sep 8, 2026 · Apt 42

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the private hallway located at apt 42, 4th story, 2nd apartment from east at south

    Sep 8, 2026 · Apt 42

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 1st window frame from south at west wall in the 3rd room from east located at apt 42, 4th story, 2nd apartment from east at south

    Sep 8, 2026 · Apt 42

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the private hallway located at apt 42, 4th story, 2nd apartment from east at south

    May 21, 2026 · Apt 42

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st door from south at west wall in the 1st room from east located at apt 42, 4th story, 2nd apartment from east at south

    May 21, 2026 · Apt 42

    Open — Certification postponment granted
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department at west wall in the kitchen located at apt 42, 4th story, 2nd apartment from east at south

    May 21, 2026 · Apt 42

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall in the bathroom located at apt 42, 4th story, 2nd apartment from east at south

    May 21, 2026 · Apt 42

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from south at west wall door frame, 1st door frame from south at west wall in the 1st room from east located at apt 42, 4th story, 2nd apartment from east at south

    May 21, 2026 · Apt 42

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 42, 4th story, 2nd apartment from east at south

    May 21, 2026 · Apt 42

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the bathroom located at apt 42, 4th story, 2nd apartment from east at south

    May 21, 2026 · Apt 42

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 42, 4th story, 2nd apartment from east at south

    May 21, 2026 · Apt 42

    Open — Nov certified late
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 1st window frame from south at west wall in the kitchen located at apt 42, 4th story, 2nd apartment from east at south

    May 21, 2026 · Apt 42

    Open — Certification postponment granted
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 42, 4th story, 2nd apartment from east at south

    May 21, 2026 · Apt 42

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st door frame from west at north wall in the bathroom located at apt 42, 4th story, 2nd apartment from east at south

    May 21, 2026 · Apt 42

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st closet from south at west wall door frame, 1st door frame from south at west wall in the 1st room from east located at apt 42, 4th story, 2nd apartment from east at south

    May 21, 2026 · Apt 42

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 42, 4th story, 2nd apartment from east at south

    May 12, 2026 · Apt 42

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from west at north wall, 1st door frame from west at north wall in the foyer located at apt 42, 4th story, 2nd apartment from east at south

    Apr 21, 2026 · Apt 42

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt 42, 4th story, 2nd apartment from east at south

    Apr 21, 2026 · Apt 42

    Open — Nov sent out
  • C

    Remove the illegal double cylinder key operated locking device at door ... in the entrance located at apt 42, 4th story, 2nd apartment from east at south

    Apr 21, 2026 · Apt 42

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective spring balance at upper sash at 1st and 2nd window from east at south wall in the 1st room from east located at apt 42, 4th story, 2nd apartment from east at south

    Apr 21, 2026 · Apt 42

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 42, 4th story, 2nd apartment from east at south

    Apr 21, 2026 · Apt 42

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 42, 4th story, 2nd apartment from east at south

    Apr 21, 2026 · Apt 42

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st door from west at north wall, 1st door frame from west at north wall in the foyer located at apt 42, 4th story, 2nd apartment from east at south

    Apr 21, 2026 · Apt 42

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective lower sash lock at west window in the kitchen located at apt 42, 4th story, 2nd apartment from east at south

    Apr 21, 2026 · Apt 42

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt apt37, 3rd story, 1st apartment from north at east

    Apr 16, 2025 · Apt APT37

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt apt37, 3rd story, 1st apartment from north at east

    Apr 16, 2025 · Apt APT37

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 37, 3rd story, 1st apartment from north at east

    Dec 2, 2024 · Apt 37

    Open — Notice of issuance sent to tenant
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 37, 3rd story, 1st apartment from north at east

    Dec 2, 2024 · Apt 37

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 37, 3rd story, 1st apartment from north at east

    Dec 2, 2024 · Apt 37

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing hook and eye at vestibule door

    Apr 22, 2024

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing hook and eye at entrance door to building

    Apr 22, 2024

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 15, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling in closet apprx 4 square feet in the 1st room from north at west located at apt 66, 6th story, 2nd apartment from west at north original violation 14708316 issued 30-nov-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Nov 30, 2021 · Apt 66

    Open — First no access to re- inspect violation
  • B

    Trace and repair the source and abate the visible mold condition... at north wall apprx 4 square feet in the kitchen located at apt 66, 6th story, 2nd apartment from west at north original violation 14708314 issued 30-nov-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Nov 30, 2021 · Apt 66

    Open — First no access to re- inspect violation
  • B

    Trace and repair the source and abate the visible mold condition... at north wall apprx 2 square feet in the bathroom located at apt 66, 6th story, 2nd apartment from west at north original violation 14708312 issued 30-nov-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Nov 30, 2021 · Apt 66

    Open — First no access to re- inspect violation
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling apprx 2 square feet in the bathroom located at apt 12, 3rd story, 2nd apartment from west at north original violation 14708325 issued 30-nov-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Nov 30, 2021 · Apt 12

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 12, 3rd story, 2nd apartment from west at north

    Nov 30, 2021 · Apt 12

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt 12, 3rd story, 2nd apartment from west at north

    Nov 30, 2021 · Apt 12

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt 12, 3rd story

    Nov 30, 2021 · Apt 12

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling apprx 2 square feet in the bathroom located at apt 12, 3rd story, 2nd apartment from west at north

    Nov 30, 2021 · Apt 12

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective brick at mortar at bulkhead to roof at public hall, 6th story

    Nov 30, 2021

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of scalding hot water temperature exceeding over 130 degrees in the entire apartment located at apt 66, 6th story, 2nd apartment from west at north

    Nov 30, 2021 · Apt 66

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling in closet apprx 4 square feet in the 1st room from north at west located at apt 66, 6th story, 2nd apartment from west at north

    Nov 30, 2021 · Apt 66

    Closed — Violation closed

DOB building violations · 19

  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2024

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2023

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 12, 2020

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 1, 2018

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 6, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 31, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 22, 2013

    Dob violation - resolved
Show 9 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 31, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 15, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 29, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 19, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 25, 2002

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 16, 2001

    Dob violation - resolved
  • Elevator elevatorrequired

    1p6613

    Sep 8, 1999

    Dob violation - resolved
  • Elevator elevatorrequired

    (29)eliminate noise (30) eliminate lost motion in main machine

    Aug 9, 1988

    Dob violation - resolved

ECB violations · 2

  • Class - 2

    B251:16j01,39o02,54bb12,02x10.16j:adjust door checks(swing doors)on various floors.02x:2-way communication-inoperable.

    Jan 14, 2013 · Penalty $2,500

    Resolve
  • Non-hazardous

    34q06/ 34b07/ 48##/ 80##/ 50##/ 51##/ 34 - secure 34 provide lighting 48 - reshacles hosit cables 80 - restore car communication 50 - reshackle 51- reshackle

    Apr 21, 2003

    Resolve

Complaints

  • Paint/plaster

    Door/frame

    Aug 31, 2026 · Apt 42

    Close
  • Water leak

    Damp spot

    Jul 10, 2026 · Apt 42

    Close
  • Paint/plaster

    Wall

    May 12, 2026 · Apt 42

    Close
  • Paint/plaster

    Window/frame

    May 7, 2026 · Apt 42

    Close
  • Paint/plaster

    Door/frame

    May 7, 2026 · Apt 42

    Close
  • Door/window

    Window frame

    Apr 16, 2026 · Apt 42

    Close
  • Paint/plaster

    Wall

    Apr 16, 2026 · Apt 42

    Close
  • Door/window

    Window frame

    Apr 16, 2026 · Apt 42

    Close
  • Paint/plaster

    Ceiling

    Apr 13, 2025 · Apt APT37

    Close
  • Unsanitary condition

    Sewage

    Apr 13, 2025 · Apt APT37

    Close
Show 40 more ↓
  • Plumbing

    Bathtub/shower

    Apr 13, 2025 · Apt APT37

    Close
  • Unsanitary condition

    Pests

    Nov 30, 2024 · Apt 37

    Close
  • Paint/plaster

    Ceiling

    Nov 30, 2024 · Apt 37

    Close
  • Water leak

    Damp spot

    Nov 30, 2024 · Apt 37

    Close
  • Water leak

    Heavy flow

    Aug 25, 2024 · Apt 37

    Close
  • Heat/hot water

    Entire building

    Apr 21, 2024 · Apt BLDG

    Close
  • Outside building

    Roof door/hatch

    Sep 30, 2021 · Apt 66

    Close
  • Paint/plaster

    Wall

    Sep 30, 2021 · Apt 66

    Close
  • Water leak

    Damp spot

    Sep 30, 2021 · Apt 66

    Close
  • Water leak

    Slow leak

    Feb 27, 2021 · Apt 37

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2019 · Apt 56

    Close
  • Water leak

    Damp spot

    Dec 22, 2018 · Apt 66

    Close
  • Water leak

    Damp spot

    Dec 22, 2018 · Apt 66

    Close
  • Water leak

    Slow leak

    Dec 22, 2018 · Apt 66

    Close
  • Water leak

    Slow leak

    Dec 22, 2018 · Apt 66

    Close
  • Unsanitary condition

    Mold

    Dec 12, 2018 · Apt 23

    Close
  • Unsanitary condition

    Mold

    Dec 12, 2018 · Apt 23

    Close
  • Water leak

    Slow leak

    Nov 30, 2018 · Apt 66

    Close
  • Water leak

    Damp spot

    Nov 30, 2018 · Apt 66

    Close
  • Water leak

    Damp spot

    Jul 25, 2018 · Apt 15

    Close
  • Water leak

    Slow leak

    Jul 25, 2018 · Apt 15

    Close
  • Water leak

    Slow leak

    Jul 24, 2018 · Apt 15

    Close
  • Unsanitary condition

    Sewage

    Jul 24, 2018 · Apt 15

    Close
  • Door/window

    Door

    Apr 4, 2018 · Apt 67

    Close
  • Door/window

    Door

    Mar 12, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 15, 2017 · Apt 15

    Close
  • Heat/hot water

    Entire building

    Apr 22, 2017 · Apt 66

    Close
  • Paint/plaster

    Ceiling

    Oct 28, 2016 · Apt 42

    Close
  • General

    Bell/buzzer/intercom

    Oct 11, 2016 · Apt 51

    Close
  • General

    Cooking gas

    Oct 11, 2016 · Apt 51

    Close
  • General

    Cooking gas

    Oct 5, 2016 · Apt BLDG

    Close
  • General

    Cooking gas

    Oct 5, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 5, 2016 · Apt 43

    Close
  • General

    Cooking gas

    Oct 5, 2016 · Apt 43

    Close
  • General

    Cooking gas

    Oct 5, 2016 · Apt 46

    Close
  • General

    Cooking gas

    Oct 4, 2016 · Apt 37

    Close
  • General

    Cooking gas

    Oct 4, 2016 · Apt 67

    Close
  • General

    Bell/buzzer/intercom

    Sep 16, 2016 · Apt 23

    Close
  • Plumbing

    Basin/sink

    Sep 16, 2016 · Apt 23

    Close
  • Paint/plaster

    Ceiling

    Sep 16, 2016 · Apt 23

    Close

Sales history

DatePriceTypeUnits
Oct 8, 2025Non-market transferRentals - elevator apartments41

Building details

Building type
Elevator apartment building (D1)
Year built
1927
Floors
6
Residential units
40
Building area
28,570 ft²
Lot area
6,656 ft²
Zoning
R8B
Community board
106
Council district
4
Block / lot
1344 / 36
Assessed value
$3,108,150
Landmark / historic district
No

HPD registration #138316, last renewed Jul 14, 2025.

Questions about 330 East 52 Street

Who owns 330 East 52 Street?

The owner of record in NYC Department of City Planning PLUTO data is Redrock Manager Fo LLC.

Does 330 East 52 Street have violations?

Yes. NYC HPD has recorded 121 housing violations at this property.

Is 330 East 52 Street rent stabilized?

NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 23% of its 40 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 330 East 52 Street built?

City records list 1927 as the year it was built.

How many apartments are in 330 East 52 Street?

It has 40 residential units and 41 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.