roofy

845 2 Avenue

Manhattan, NY 10017BBL 1-01319-7502Map

Owner of record: The Second Avenue Condominium

845 2 Avenue is a condominium built in 2001 in Manhattan, 10017. It has 18 residential units across 10 floors. The owner of record is The Second Avenue Condominium. HPD has recorded 17 housing violations here, most recently on December 22, 2020. 14 of the 17 most recent violations are still open.

HPD violations
17
DOB violations
18
ECB violations
7
HPD complaints
5

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Dec 22, 2020

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 17

  • B

    Repair the roof so that it will not leak over the ceiling at public hall, 10th story

    Dec 22, 2020

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 10th story

    Dec 22, 2020

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 10th story

    Dec 22, 2020

    Open — Nov sent out
  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at entrance door to the building , 1st story

    Dec 22, 2020

    Open — Nov sent out
  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at vestibule door to the building , 1st story

    Dec 22, 2020

    Open — Nov sent out
  • B

    Provide security in the event of a power outage by means of an acceptable heavy duty lock and latch set at entrance door to the building , 1st story

    Dec 22, 2020

    Open — Nov sent out
  • B

    Provide security in the event of a power outage by means of an acceptable heavy duty lock and latch set at vestibule door to the building , 1st story

    Dec 22, 2020

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Dec 22, 2020

    Open — Nov sent out
  • A

    Replace with new the broken or defective electrical outlet cover plate at north wall at public hall, 10th story

    Dec 22, 2020

    Open — Nov sent out
  • A

    Provide safety cover caps /plugs to electrical outlets at north and east walls at public hall, 10th story

    Dec 22, 2020

    Open — Nov sent out
Show 7 more ↓
  • A

    Paint or post a sign indicating floors .. at public hall, 10th story

    Dec 22, 2020

    Open — Nov sent out
  • A

    Provide safety cover caps /plugs to electrical outlets at north and east walls at public hall, 4th story

    Dec 22, 2020

    Open — Nov sent out
  • B

    Replace with new the missing protective wire screen mesh at skylight at public hall, 4th story

    Dec 9, 2020

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the 1st room from east located at apt 4a, 4th story, 2nd apartment from west at north

    Dec 3, 2020 · Apt 4A

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the 1st room from east located at apt 4a, 4th story, 2nd apartment from west at north

    Dec 3, 2020 · Apt 4A

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 4a, 4th story, 2nd apartment from west at north

    Dec 3, 2020 · Apt 4A

    Open — Nov sent out
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following , 100 watts required.

    Aug 25, 2010

    Open — Nov certified late

DOB building violations · 18

  • Immediate emergency anythingoptional

    Remedy: repair sidewalk shed immediately, to safeguard the public and property

    Dec 11, 2023

    Dob violation - dismissed
  • Construction other optional

    Structure rendered non compliant. damages observed to have been sustai ned by vehicle impact. the impactto sidewalk shed

    Dec 10, 2023

    Dob violation - dismissed
  • Hazardous condition (facade) facade required

    Cycle 9a unsafe report filed

    Feb 21, 2022

    Dob violation - active
  • Failure to correct swarmp conditions (facade) facade required

    Cycle 9a failure to correct swarmp conditions

    Feb 21, 2022

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 12, 2017

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 19, 2014

    Dob violation - resolved
Show 8 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 12, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 28, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 25, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 25, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 24, 2008

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Feb 8, 2008

    Dob violation - active
  • Zoning none

    Z-zoning none

    Feb 8, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed

ECB violations · 7

  • Class - 2

    Failure to maintain exterior bldg exp 2&4 rusting exterior clips exp 1sign cover (missing)(non recurring) rem:maintain exterior facade.provide safety measures-repair damaged facade make safe as per 1rcny 103-04

    Jan 16, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. ecb 35348370m. remedy: file a certificate of correction. provision of law: 28-204.4.

    Dec 13, 2018 · Penalty $650

    Resolve
  • Class - 2

    Permanent dwelling offered for others than permanent-residential ourposes c of o#102546942 indicate premises to be legally approved as a class'a'multiple dwelling. based on physical inspection & internet resear

    Aug 17, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #814498.remedy: submit required technical report

    May 18, 2018

    Resolve
  • Class - 2

    Failure to maintain exterior bldg east elev exp1 - 1st flr detached exterior light fixture south elev exp2 rusting clips at top floor horizontal sealnt cracked and cracked.west elev exp3 all balconies framing

    Aug 30, 2017

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner:flr. numbering signsmissing and/or defective per bc 1019.1.7;27-392;noted:(1)no flr. numb ering at public halls or stairwells(2)no emergency lighting at public

    Apr 8, 2009 · Penalty $500

    Active
  • Hazardous

    Failure to maintain exterior building wall,defect is: rear facade 3rd story west bricks missing and lieing on 2nd story extension. remainingbricks at top loose and unkeyed. two chimney's at north west and south

    Jun 7, 2000 · Penalty $2,500

    Resolve

Complaints

  • General

    Cooking gas

    May 5, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 7, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2020 · Apt 4A

    Close
  • Heating

    Heat related

    Nov 8, 2007 · Apt 9B

    Close
  • Heating

    Heat related

    Nov 8, 2007 · Apt 2B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
2001
Floors
10
Residential units
18
Building area
14,844 ft²
Lot area
2,500 ft²
Zoning
C1-9
Community board
106
Council district
4
Block / lot
1319 / 7502
Assessed value
$2,383,202
Landmark / historic district
No

HPD registration #142005, last renewed Jul 30, 2026.

Questions about 845 2 Avenue

Who owns 845 2 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is The Second Avenue Condominium.

Does 845 2 Avenue have violations?

Yes. NYC HPD has recorded 17 housing violations at this property.

Is 845 2 Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 845 2 Avenue built?

City records list 2001 as the year it was built.

How many apartments are in 845 2 Avenue?

It has 18 residential units and 19 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.