6 East 48 Street
Manhattan, NY 10017BBL 1-01283-0064Map
Owner of record: Ruradan Corp
6 East 48 Street is an elevator apartment building built in 1942 in Manhattan, 10017. It has 35 residential units across 6 floors. The owner of record is Ruradan Corp. HPD has recorded 176 housing violations here, most recently on August 7, 2026. 7 of the 50 most recent violations are still open. City tax records listed 26 rent-stabilized apartments here in 2024.
- HPD violations
- 176
- DOB violations
- 53
- ECB violations
- 28
- HPD complaints
- 299
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 176
- ANon-hazardous
Properly repair with similar material the broken or defective cement floor in the bathroom located at apt 5a, 5th story, 2nd apartment from north at east
Aug 7, 2026 · Apt 5A
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 5a, 5th story, 2nd apartment from north at east
Aug 7, 2026 · Apt 5A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall in the bathroom located at apt 5a, 5th story, 2nd apartment from north at east
Aug 7, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to the apartment south wall panel in the private hallway located at apt 5a, 5th story, 2nd apartment from north at east
Aug 7, 2026 · Apt 5A
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the foyer located at apt 5a, 5th story, 2nd apartment from north at east
Aug 7, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Refit closet door at south wall in the foyer located at apt 5a, 5th story, 2nd apartment from north at east
Aug 7, 2026 · Apt 5A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective counter bottom at sink base cabinet in the kitchen located at apt 5a, 5th story, 2nd apartment from north at east
Aug 7, 2026 · Apt 5A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from east located at apt 5g, 5th story, 1st apartment from north at east
Aug 30, 2024 · Apt 5G
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 5g, 5th story, 1st apartment from north at east
Aug 30, 2024 · Apt 5G
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector inoperable in the entire apartment located at apt 5g, 5th story, 1st apartment from north at east
Aug 30, 2024 · Apt 5G
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the private hallway located at apt 5a, 5th story, 2nd apartment from north at east
Feb 20, 2024 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at waste line at washbasin in the bathroom located at apt 5a, 5th story, 2nd apartment from north at east
Feb 20, 2024 · Apt 5A
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 5a, 5th story, 2nd apartment from north at east
Feb 20, 2024 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 5a, 5th story, 2nd apartment from north at east
Feb 20, 2024 · Apt 5A
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste line at sink in the kitchen located at apt 5a, 5th story, 2nd apartment from north at east
Feb 20, 2024 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 5a, 5th story, 2nd apartment from north at east
Feb 20, 2024 · Apt 5A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 5a, 5th story, 2nd apartment from north at east
Feb 20, 2024 · Apt 5A
Closed — Violation dismissed - BHazardous
Properly secure the loose washbasin in the bathroom located at apt 5a, 5th story, 2nd apartment from north at east
Feb 20, 2024 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 5a, 5th story, 2nd apartment from north at east
Feb 20, 2024 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at waste line at sink in the kitchen located at apt 5a, 5th story, 2nd apartment from north at east
Feb 20, 2024 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 5a, 5th story, 2nd apartment from north at east
Feb 20, 2024 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing kick stand installed at vestibule at public hall, 1st story
Feb 20, 2024
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation steam riser at east in the kitchen located at apt 5a, 5th story, 2nd apartment from north at east
Feb 20, 2024 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material, north wall bulkhead stairs at public hall, 6th story
Jul 12, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall at bulkhead stairs at public hall, 6th story
Jul 12, 2021
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors ... in the entrance located at apt 6g, 6th story, 1st apartment from north at east
May 21, 2019 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east, west and south wall in the kitchen located at apt 6g, 6th story, 1st apartment from north at east
May 21, 2019 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 6g, 6th story, 1st apartment from north at east
May 21, 2019 · Apt 6G
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective glass pane in upper window sash in the bathroom located at apt 6g, 6th story, 1st apartment from north at east
May 21, 2019 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing eschutchen plate heat riser at ceiling in the bathroom located at apt 6g, 6th story, 1st apartment from north at east
May 21, 2019 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 6g, 6th story, 1st apartment from north at east
May 21, 2019 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective counter balance at lower window sash in the 1st room from north located at apt 6g, 6th story, 1st apartment from north at east
May 21, 2019 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 6g, 6th story, 1st apartment from north at east
May 21, 2019 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 6g, 6th story, 1st apartment from north at east
May 21, 2019 · Apt 6G
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of garbage bin at public hall, 1st story
Oct 19, 2018
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing caps or covers at all walls at electrical outlets at public hall, 1st story
Oct 19, 2018
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in drain pipe at sink in the kitchen located at apt 5a, 5th story, 2nd apartment from north at east
Sep 29, 2018 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchen located at apt 5a, 5th story, 2nd apartment from north at east
Aug 15, 2018 · Apt 5A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and south wall in the bathroom located at apt 5a, 5th story, 2nd apartment from north at east
Aug 15, 2018 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair the broken or defective return buzzer system from front building entrance door to in the private hallway located at apt 5a, 5th story, 2nd apartment from north at east
Aug 15, 2018 · Apt 5A
Closed — Violation closed - ANon-hazardous
Provide in accordance with the rules and regulations of this department a waterproof floor and base for the water closet ... in the bathroom located at apt 5a, 5th story, 2nd apartment from north at east
Aug 15, 2018 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Remove all obstructions and repair all defects in wasteline at wash basin & bathtub in the bathroom located at apt 5a, 5th story, 2nd apartment from north at east
Aug 15, 2018 · Apt 5A
Closed — Violation closed - BHazardous
Replace with new the missing outer glass at lower sash west window in the 1st room from east at south located at apt 5a, 5th story
Aug 15, 2018 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5a, 5th story, 2nd apartment from north at east
Aug 15, 2018 · Apt 5A
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of flower pots at bulkhead landing
Jul 30, 2018
Closed — Violation dismissed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures electrical sockets at west wall in the 1st room from north located at apt 6b, 6th story
Jul 30, 2018 · Apt 6B
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective marble door saddle in the bathroom located at apt 6b, 6th story, 1st apartment from east at south
Jul 30, 2018 · Apt 6B
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches located at apt 6b, 6th story, 1st apartment from east at south
Jul 30, 2018 · Apt 6B
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation heat riser in the bathroom located at apt 6b, 6th story, 1st apartment from east at south
Jun 12, 2018 · Apt 6B
Closed — Violation closed
DOB building violations · 53
- Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 1, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 7, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 28, 2014
Dob violation - resolved - Construction other optional
Failure to maintain bldg in a code compliant manner. noted: at facade, broken masonry was observed at # 1,2 & 4 exposures at parapets remedy: immediatlly make safe, maintain facade in legal & safe manner, obtain all needed permits
May 17, 2013
Vpw*-violation unserved ecb-work without permit-dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 9, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 29, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 9, 2010
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 9, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 11, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 1, 2007
Dob violation - resolved - Construction other optional
C-construction other optional
Sep 8, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 6, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 28, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 14, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2001
Dob violation - resolved - Construction other optional
C-construction other optional
Sep 10, 2001
Dob violation - dismissed - Zoning none
Z-zoning none
Sep 10, 2001
Dob violation - dismissed - Elevator elevatorrequired
1p20906
Mar 23, 2000
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 10, 2000
Dob violation - dismissed - Plumbing none
P-plumbing none
May 6, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Elevator elevatorrequired
1p20906
Mar 3, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 21, 1998
Dob violation - dismissed - Zoning none
Z-zoning none
Jan 20, 1998
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 20, 1998
Dob violation - dismissed - Zoning none
Z-zoning none
Jan 20, 1998
Dob violation - dismissed - Zoning none
Z-zoning none
Jan 20, 1998
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 20, 1998
Dob violation - dismissed - Zoning none
Z-zoning none
Feb 4, 1997
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 4, 1997
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 30, 1996
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 30, 1996
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 30, 1996
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 30, 1996
Dob violation - dismissed - Zoning none
Z-zoning none
Dec 19, 1996
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 19, 1996
Dob violation - dismissed - Zoning none
Z-zoning none
Nov 26, 1996
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 26, 1996
Dob violation - dismissed - Zoning none
Z-zoning none
Nov 26, 1996
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 13, 1996
Dob violation - dismissed - Zoning none
Z-zoning none
Jun 13, 1996
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 18, 1995
Dob violation - dismissed - Zoning none
Z-zoning none
Dec 18, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 28
- Class - 2
Failure to provide parapet information panel for sidewalk shed.noted @time of inspection the sidewalk shed installed on exp1 does not have aparapet information installed.rem comply w/ code
Aug 7, 2015
Resolve - Class - 3
Failure to maintain bldg in code compliant manner. noted at roof level at southeast & south west court yard parapet walls,slight step cracking approx 3 runs up to coping from (16ft louvre) remedy: repair &/or
Aug 29, 2014 · Penalty $230
Resolve - Class - 2
Failure to maintain bldg wall(s) or appurtenances. defects noted: facing brick is missing mortar joints along entire length of and width of parapet wall at front facade. remedy: maintain exterior bldg wall.
Jun 28, 2013 · Penalty $500
Resolve - Class - 1
Failure to correct ecb 34775528n for illegal work on 3rd flr combined apts 3e & 3f. no record of correction w/dob. remedy: obtain permit.
Mar 27, 2010 · Penalty $6,000
Resolve - Class - 1
Work w/o a permit. noted: apt 3e & 3f at 3rd flr have been combined byremoving sections of load bearing partition walls and creating openings all w/o a permit. remedy: obtain a permit or restore premises to
Sep 24, 2009 · Penalty $800
Resolve - Class - 1
Occupancy contrary to that allowed by the c/o or bldg dept records. noted: apt 3e & 3f at 3rd flr have been combined together and are being occupied as office contrary to c/o #67029 dated 1.27.69. remedy:
Sep 24, 2009 · Penalty $2,400
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a certificate of correction w/the dob. noted: respondent failed to comply w/the commissioner's order to correct the violating conditions and file a cert of
Sep 11, 2009 · Penalty $800
Resolve - Class - 2
Failure to maintain bldg in a code-compliant manner. exhaust dischargemust be no closer than 10' from bldg openings as per rs2-2.1.4 & mc 401.5.2. noted: kitchen exhaust located at the rear sw corner of the
Sep 11, 2009 · Penalty $2,000
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a certificate of correction w/the dob. noted: respondent failed to comply w/the commissioner's order to correct the violating conditions and file a cert of
Sep 11, 2009 · Penalty $800
Resolve - Class - 1
Failure to comply w/an order of the commissioner. noted: respondent failed to correct the conditions cited in the prior nov #34775528n, having combined apt #3e & apt #3f at 3rd flr to one apt w/o a permit. no
Sep 11, 2009
Resolve
Show 18 more ↓
- Class - 1
Work w/o a permit noted third fl apt 3e and 3f have been combined to one apt demising partition has been made into an archway between each apt there's no record of a permit or application file for this work own
Apr 24, 2009 · Penalty $1,600
Resolve - Class - 1
Failure to maintain bldg in code compliant manner noted kitchen exhaust vent located at the rear southwest corner of the roof is discharging smoke and is less than 10ft from bldg windows kitchen exhaust vent
Apr 24, 2009 · Penalty $500
Resolve - Class - 1
Altered changed bldg occupied w/o a valid c of o as per 28-118.3.1 & 28-118.3.2 noted existing c of o 67029 indicates 7 apt on the 3rd fl existing conditions are a combined apt on the 3rd fl (apts 3e and 3f is
Apr 24, 2009
Resolve - Class - 1
Failure to maintain bldg in code compliant manner noted:commerical kitchen exhaust located on the roof has accumilated oily waste thru-out the fan housing vent is exhausting heavy smoke noted:all systems shall
Feb 2, 2009 · Penalty $1,000
Resolve - Class - 3
Work w/o a permit work noted at rear of bldg exposure #3 over lower roof wolf & lamb eating drinking establishment new ac compressors on steel dunnage installed w/o first obtaining permit job looks completed
Jul 17, 2008 · Penalty $200
Resolve - Non-hazardous
Work w/o a permit. work noted: at roof top east side an approx. 25' section of chimney exhaust breaching (24" diam 16ga pipe) has been dismatitled for replacement. remedy: obtain and proper permits and or appro
Sep 2, 2005
Resolve - Non-hazardous
Failure to maintain plumbing &/or appurtenances non hazardous. hot & cold water cross connected through improper hookup of washing machineshand showers sending hot water into cold water line. remedy: maintain
May 6, 1999
Resolve - Non-hazardous
08v,36i,74m,74ax,22d, 08-adjust car leveling at each floor 36 repair lock motor room door 74-provide cover for box under car 74a-repair hull indicators 22-secure top emergency exit
Nov 20, 1997
Resolve - Non-hazardous
Occupancy contrary to that allowed by c of o #67029 occupancy changes at 2 story from offices to tailor show apt 2c sw apt.remedy:amend c ofo or discontinue unlawful use per dept code.
Mar 5, 1996
Resolve - Non-hazardous
Failure to carry permitted work in accordance with applicable laws and regulations in that construction activities are being performed otherthan on weekdays between the hours of 24-24 of the various as required
Oct 14, 1995 · Penalty $350
Resolve - Non-hazardous
Occupancy contrary to that by certificate of occupancy 67029 occupancy changed at 2nd story from office to tailor shop apt 2c remedydiscontinue illegal use
Jul 8, 1993
Resolve - Non-hazardous
Occupancy contrary to that allowed by certificate of occupancy #67029,occupancy changed at 2nd story from offices to tailor shop (apt 2c). remedy: discontinue unlawful use forthwith
Apr 19, 1993
Resolve - Non-hazardous
13m,18m,50l,17m,15l,08v. 18-covers,17-guards,were missing 15-3rd-floordoor.
Mar 8, 1993
Resolve - Non-hazardous
Failure to have bn 8014/87 signed of remedy have bn 8014/87 signed off
Sep 21, 1989
Resolve - Non-hazardous
Occupancy contrary to that allowed by c of o #67029 occupancy changed at 2 sty from offices to tailor show apt 2c, sw apt . remedy discontinue unlawful use forht with
Jul 14, 1989 · Penalty $250
Resolve - Non-hazardous
Altered premises in that b/n 8014/87 has not been signed off. pa contraty to approved plan changed store installed new front entrance and installed food salad bar displays
Apr 25, 1989
Resolve - Non-hazardous
Failure to have alt 8014/87 signed off remedy have aklt 8017/87 sign off
Nov 4, 1988 · Penalty $100
Resolve - Non-hazardous
Pa contrary to plans. installed food salad bar, display and new exit door.
Jul 7, 1988 · Penalty $250
Resolve
Complaints
- Water leak
Damp spot
Aug 5, 2026 · Apt 5A
Close - Paint/plaster
Ceiling
Aug 5, 2026 · Apt 5A
Close - Flooring/stairs
Floor
Aug 5, 2026 · Apt 5A
Close - General
Cabinet
Aug 5, 2026 · Apt 5A
Close - Flooring/stairs
Floor
Aug 5, 2026 · Apt 5A
Close - Appliance
Electric/gas range
Aug 5, 2026 · Apt 5A
Close - Paint/plaster
Wall
Aug 5, 2026 · Apt 5A
Close - Door/window
Door
Aug 5, 2026 · Apt 5A
Close - Paint/plaster
Wall
Aug 5, 2026 · Apt 5A
Close - General
Bell/buzzer/intercom
Aug 5, 2026 · Apt 5A
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Aug 5, 2026 · Apt 5A
Close - Plumbing
Basin/sink
Aug 5, 2026 · Apt 5A
Close - Plumbing
Toilet
Aug 5, 2026 · Apt 5A
Close - Water leak
Slow leak
Aug 5, 2026 · Apt 5A
Close - Water leak
Damp spot
Aug 5, 2026 · Apt 5A
Close - Paint/plaster
Wall
Aug 14, 2024 · Apt 5G
Close - Water leak
Damp spot
Aug 14, 2024 · Apt 5G
Close - Unsanitary condition
Mold
Aug 14, 2024 · Apt 5G
Close - Water leak
Slow leak
Aug 14, 2024 · Apt 5G
Close - Door/window
Window frame
Feb 14, 2024 · Apt 5A
Close - Electric
Outlet/switch
Feb 14, 2024 · Apt 5A
Close - Plumbing
Toilet
Feb 14, 2024 · Apt 5A
Close - Flooring/stairs
Floor
Feb 14, 2024 · Apt 5A
Close - Paint/plaster
Ceiling
Feb 14, 2024 · Apt 5A
Close - Appliance
Electric/gas range
Feb 14, 2024 · Apt 5A
Close - Flooring/stairs
Floor
Feb 14, 2024 · Apt 5A
Close - Water leak
Slow leak
Feb 14, 2024 · Apt 5A
Close - General
Cabinet
Feb 14, 2024 · Apt 5A
Close - Plumbing
Basin/sink
Feb 14, 2024 · Apt 5A
Close - Water leak
Slow leak
Feb 14, 2024 · Apt 5A
Close - Paint/plaster
Wall
Feb 14, 2024 · Apt 5A
Close - Plumbing
Bathtub/shower
Feb 14, 2024 · Apt 5A
Close - Flooring/stairs
Floor
Feb 14, 2024 · Apt 5A
Close - Plumbing
Basin/sink
Feb 14, 2024 · Apt 5A
Close - Electric
Lighting
Feb 14, 2024 · Apt 5A
Close - General
Bell/buzzer/intercom
Feb 14, 2024 · Apt 5A
Close - Paint/plaster
Ceiling
Feb 14, 2024 · Apt 5A
Close - Paint/plaster
Wall
Feb 14, 2024 · Apt 5A
Close - General
Cabinet
Feb 14, 2024 · Apt 5A
Close - Unsanitary condition
Mold
Feb 14, 2024 · Apt 5A
Close - Door/window
Window frame
Dec 22, 2023 · Apt 5A
Close - Plumbing
Basin/sink
Dec 22, 2023 · Apt 5A
Close - General
Cabinet
Dec 22, 2023 · Apt 5A
Close - Water leak
Damp spot
Dec 22, 2023 · Apt 5A
Close - Water leak
Slow leak
Dec 22, 2023 · Apt 5A
Close - Water leak
Damp spot
Dec 22, 2023 · Apt 5A
Close - Paint/plaster
Wall
Dec 22, 2023 · Apt 5A
Close - Flooring/stairs
Floor
Dec 22, 2023 · Apt 5A
Close - Paint/plaster
Ceiling
Dec 22, 2023 · Apt 5A
Close - Paint/plaster
Ceiling
Dec 22, 2023 · Apt 5A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1942
- Floors
- 6
- Residential units
- 35
- Building area
- 45,001 ft²
- Lot area
- 7,531 ft²
- Zoning
- C5-2.5
- Community board
- 105
- Council district
- 4
- Block / lot
- 1283 / 64
- Assessed value
- $6,028,650
- Landmark / historic district
- No
HPD registration #101730, last renewed Jul 27, 2026.
Questions about 6 East 48 Street
Who owns 6 East 48 Street?
The owner of record in NYC Department of City Planning PLUTO data is Ruradan Corp.
Does 6 East 48 Street have violations?
Yes. NYC HPD has recorded 176 housing violations at this property.
Is 6 East 48 Street rent stabilized?
NYC Department of Finance tax bills listed 26 rent-stabilized units here in 2024 (about 74% of its 35 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 6 East 48 Street built?
City records list 1942 as the year it was built.
How many apartments are in 6 East 48 Street?
It has 35 residential units and 40 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.