190 Riverside Drive
Manhattan, NY 10024BBL 1-01251-7501Map
Owner of record: 190 Riverside Drive Condominium
190 Riverside Drive is a condominium built in 1910 in Manhattan, 10024. It has 44 residential units across 12 floors. The owner of record is 190 Riverside Drive Condominium. HPD has recorded 31 housing violations here, most recently on June 16, 2023. City tax records listed 9 rent-stabilized apartments here in 2024.
- HPD violations
- 31
- DOB violations
- 39
- ECB violations
- 10
- HPD complaints
- 64
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 31
- CImmediately hazardous
Remove device preventing door from being self-closing chain and hook installed at door at building entrance at public hall, 1st story
Jun 16, 2023
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective rubber gasket at lower refrigerator door in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east
Jun 5, 2023 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 4th room from east located at apt 5b, 5th story, 1st apartment from north at east
Mar 22, 2023 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from north at east
Mar 22, 2023 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Mar 22, 2023 · Apt 5B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector inoperable in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Mar 22, 2023 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Mar 22, 2023 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall, 1st closet from north at east wall ceiling, 1st closet from north at east wall door frame, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 4th room from east located at apt 5b, 5th story, 1st apartment from north at east
Mar 22, 2023 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, 1st closet from west at north wall wall in the private hallway located at apt 5b, 5th story, 1st apartment from north at east
Mar 22, 2023 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall, 1st window frame from east at south wall in the bathroom located at apt 5b, 5th story, 1st apartment from north at east
Mar 22, 2023 · Apt 5B
Closed — Violation closed
Show 21 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, 1st closet from west at north wall wall, 1st closet from south at west wall door frame, 1st closet from south at west wall wall in the 2nd room from east at north located at apt 5b, 5th story, 1st apartment from north at east
Mar 22, 2023 · Apt 5B
Closed — Violation closed - BHazardous
Properly repair the broken or defective window counter balance at lower sashes in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Feb 11, 2023 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector which is behind door in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Feb 11, 2023 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). which is behind door in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Feb 11, 2023 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Feb 11, 2023 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective window counter balance lower sashes in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east
Feb 11, 2023 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at waste line under wash basin in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Feb 11, 2023 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3a, 3rd story, 3rd apartment from west at north
Feb 11, 2023 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector must be within 15 ft of sleeping area in the entire apartment located at apt 3a, 3rd story, 3rd apartment from west at north
Feb 11, 2023 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). must be within 15 ft of sleeping area in the entire apartment located at apt 3a, 3rd story, 3rd apartment from west at north
Feb 11, 2023 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
M/d law abate the nuisance consisting of condensation in between lower sashes 1st window from east in the 2nd room from east located at apt 3a, 3rd story, 3rd apartment from west at north
Feb 11, 2023 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor improperly installed at public hall, 1st story
Oct 11, 2018
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 11, 2018
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding 130 degrees in the kitchen located at apt 9c, 9th story, 2nd apartment from north at east
Jan 27, 2017 · Apt 9C
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 21, 2016
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceilings and walls in the entire apartment located at apt 11a, 11th story, 1st apartment from north at east
May 10, 2010 · Apt 11A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north located at apt 11a, 11th story, 1st apartment from north at east
Dec 15, 2009 · Apt 11A
Closed — Violation closed - BHazardous
Properly secure the loose wood stairs at roof terrace , 12th story
Jun 22, 2009
Closed — Violation closed - BHazardous
Replace with new the broken or defective wire glass, at skylight stair bulkhead roof.
Oct 4, 2006
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Dec 11, 2004
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of painted and unopenable skylight window at ceiling in the bathroom located at apt ph-e, 12th story, 1st apartment from west at north
Jun 6, 2002 · Apt PH-E
Closed — Violation closed
DOB building violations · 39
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2021
Nov 21, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2021
Dob violation - resolved - Construction other optional
Borough commissioner stop work order application #123732372 .due to contractor withdrawal. work is approximately 80% complete.
Feb 10, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 17, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 17, 2020
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 24, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 24, 2019
Dob violation - resolved - Facade safety program facade required
Fisp-facade safety program facade required
Jan 28, 2019
Dob violation - dismissed
Show 29 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 20, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 3, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 3, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2015
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 11, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 1, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 1, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 20, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 20, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2009
Dob violation - resolved - Construction other optional
Work w/out permit
Sep 7, 2008
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 18, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 18, 2006
Dob violation - resolved - Elevator elevatorrequired
1p9187
Mar 27, 2003
Dob violation - resolved
ECB violations · 10
- Class - 2
Failure to maintain exterior building facade and appurtenances. noted at time of inspection roof level deteriorated and loose mortar joint between coping stone and parapet at the penthouse on exposure#4 east el
Nov 2, 2020
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/viollation#35319589y issued on 9/11/2018,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptible certt
Jul 10, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building facade as per 1 rcny 103-04. noted at time of inspection: south elevation exp#1. cracked decorative stone/terra cotta underneath below. bay windows on 3rd floor. rmdy:main
Sep 11, 2018 · Penalty $1,250
Resolve - Class - 1
44h08/ 56q03/ 44- traction sheave worn must regroove 56- install guards on hoist machine and deflector sheaves
Nov 21, 2014 · Penalty $1,000
Resolve - Class - 1
Fail to safeguard all persons and property affected by const ops.notice @time of insp(incident)sidewalk shed being removed from alteration jobsite men working on removal of shed passing planks from top of shed
Jul 8, 2014
Resolve - Class - 2
Work without a permit. noted: wall being framed at roof level and bulkhead there are not permits in dob database no plans at site. rem: obtain permit or restore to prior legal condition.
Jun 6, 2009
Resolve - Class - 1
Work w/o a permit. noted: temporary structures erected thru-out entirerooftop approx 15 separated structures made up of 3/4" plywood & metalframing holed in place w/cement blocks creating a wind hazard. remedy:
Sep 7, 2008 · Penalty $8,000
Resolve - Non-hazardous
Failure to maintain building.(interior) noted: at perthouse level the interior wall north side wall is crack and missing plaster work. also noted: several area penetration on the out. side wall. remedy: make al
May 22, 2002 · Penalty $180
Resolve - Hazardous
Failure to provide required means of egress from floor. noted: at penthouse level: east penthouse. the secondary means of egress door (east) steos missing (two) that provide access to fire escape north. also no
May 22, 2002 · Penalty $480
Resolve - Non-hazardous
Work without a permit. 30 x 3 section of masonary parapet wall has been removed because the said parapet wall was structurally defective creating a hazardous condition
Feb 17, 2000 · Penalty $2,500
Resolve
Complaints
- Appliance
Refrigerator
May 15, 2023 · Apt 3B
Close - Paint/plaster
Wall
Mar 21, 2023 · Apt 5B
Close - Flooring/stairs
Floor
Mar 6, 2023 · Apt 6A
Close - Flooring/stairs
Floor
Jan 31, 2023 · Apt 3A
Close - Flooring/stairs
Floor
Jan 31, 2023 · Apt 6A
Close - Door/window
Window frame
Jan 31, 2023 · Apt 3B
Close - Heat/hot water
Entire building
Feb 27, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2021 · Apt 3BAND8
Close - Plumbing
Water supply
Apr 24, 2019 · Apt 10A
Close - Paint/plaster
Door/frame
Oct 1, 2018 · Apt 3B
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Jan 23, 2017 · Apt 9C
Close - General
Cooking gas
Apr 6, 2012 · Apt 4A
Close - Heating
Heat related
Mar 6, 2012 · Apt BLDG
Close - Paint/plaster
Ceiling
Oct 13, 2011 · Apt 11C
Close - Heating
Heat related
Mar 29, 2011 · Apt 11C
Close - Construction
Elevator
Nov 17, 2010 · Apt 11C
Close - Plumbing
Water-leaks
Nov 17, 2010 · Apt 11C
Close - Heating
Heat related
May 11, 2010 · Apt 2B
Close - Plumbing
Water-leaks
Mar 30, 2010 · Apt 11A
Close - Nonconst
Vermin
Mar 25, 2010 · Apt 3B
Close - Paint/plaster
Wall
Mar 25, 2010 · Apt 3B
Close - Plumbing
Water-leaks
Mar 25, 2010 · Apt 3B
Close - Electric
Wiring
Mar 25, 2010 · Apt 3B
Close - Nonconst
Vermin
Feb 3, 2010 · Apt 6F
Close - Plumbing
Water-leaks
Nov 13, 2009 · Apt 11A
Close - Plumbing
Water-leaks
Nov 13, 2009 · Apt 11A
Close - Plumbing
Water-leaks
Nov 13, 2009 · Apt 11A
Close - General
Stairs
Jun 22, 2009 · Apt PHE
Close - Paint/plaster
Wall
Jun 11, 2009 · Apt 3B
Close - Heating
Heat related
May 18, 2009 · Apt BLDG
Close - Heating
Heat related
May 5, 2009 · Apt BLDG
Close - Heating
Heat related
May 5, 2009 · Apt PHE
Close - Heating
Heat related
Oct 5, 2008 · Apt BLDG
Close - Plumbing
Water-leaks
Sep 11, 2008 · Apt PHE
Close - Paint/plaster
Wall
Sep 11, 2008 · Apt PHE
Close - Paint/plaster
Ceiling
Sep 11, 2008 · Apt PHE
Close - Heating
Heat related
May 20, 2008 · Apt 6A
Close - Heating
Heat related
May 20, 2008 · Apt BLDG
Close - Heating
Heat related
May 16, 2008 · Apt BLDG
Close - Heating
Heat related
Apr 30, 2008 · Apt PHE
Close - Heating
Heat related
Apr 29, 2008 · Apt BLDG
Close - Heating
Heat related
Apr 28, 2008 · Apt BLDG
Close - Heating
Heat related
Nov 19, 2007 · Apt 9A
Close - General
Windows
Mar 2, 2007 · Apt 7C
Close - General
Windows
Mar 2, 2007 · Apt 7C
Close - Plumbing
Water-leaks
Oct 12, 2006 · Apt 9C
Close - Paint/plaster
Wall
Sep 25, 2006 · Apt 6F
Close - Construction
Roof
Sep 25, 2006 · Apt PHE
Close - Heating
Heat related
May 23, 2006 · Apt BLDG
Close - Paint/plaster
Wall
May 3, 2006 · Apt 3E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (R4)
- Year built
- 1910
- Floors
- 12
- Residential units
- 44
- Building area
- 82,055 ft²
- Lot area
- 10,788 ft²
- Zoning
- R10A
- Community board
- 107
- Council district
- 6
- Block / lot
- 1251 / 7501
- Assessed value
- $13,027,471
- Landmark / historic district
- Riverside-West End Historic District
HPD registration #108097, last renewed Sep 17, 2025.
Questions about 190 Riverside Drive
Who owns 190 Riverside Drive?
The owner of record in NYC Department of City Planning PLUTO data is 190 Riverside Drive Condominium.
Does 190 Riverside Drive have violations?
Yes. NYC HPD has recorded 31 housing violations at this property.
Is 190 Riverside Drive rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 20% of its 44 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 190 Riverside Drive built?
City records list 1910 as the year it was built.
How many apartments are in 190 Riverside Drive?
It has 44 residential units and 52 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.