416 Amsterdam Avenue
Manhattan, NY 10024BBL 1-01227-0036Map
Owner of record: 200 W 80th Owner LLC
416 Amsterdam Avenue is a walk-up apartment building built in 1895 in Manhattan, 10024. It has 12 residential units across 5 floors. The owner of record is 200 W 80th Owner LLC. HPD has recorded 106 housing violations here, most recently on July 16, 2025. 6 of the 50 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 106
- DOB violations
- 12
- ECB violations
- 2
- HPD complaints
- 78
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 106
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing
Jul 16, 2025
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jul 16, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jul 16, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing
Jul 16, 2025
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Jul 16, 2025
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Jul 16, 2025
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 16, 2025
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing
Jul 16, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5w, 5th story, 1st apartment from south at west
Feb 3, 2025 · Apt 5W
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5w, 5th story, 1st apartment from south at west
Feb 3, 2025 · Apt 5W
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement
Feb 3, 2025
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 5n, 5th story, 1st apartment from west at north
May 19, 2021 · Apt 5N
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5n, 5th story, 1st apartment from west at north
May 19, 2021 · Apt 5N
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 5n, 5th story, 1st apartment from west at north
May 19, 2021 · Apt 5N
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the raditor in the kitchen located at apt 5n, 5th story, 1st apartment from west at north
May 19, 2021 · Apt 5N
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from south at west wall in the 5th room from north located at apt 2n, 2nd story, 1st apartment from north at east
Feb 16, 2021 · Apt 2N
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the north wall in the 5th room from north located at apt 2n, 2nd story, 1st apartment from north at east
Feb 16, 2021 · Apt 2N
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the 5th room from north located at apt 2n, 2nd story, 1st apartment from north at east
Feb 16, 2021 · Apt 2N
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 2nd room from east, the 1st room from east located at apt 2n, 2nd story, 1st apartment from north at east
Feb 16, 2021 · Apt 2N
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ... in the entire apartment located at apt 5n, 5th story, 1st apartment from west at north
Dec 16, 2020 · Apt 5N
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ..... in the entire apartment located at apt 3n, 3rd story, 1st apartment from west at north
Dec 16, 2020 · Apt 3N
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Oct 3, 2020
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ... in the entire apartment located at apt 4w, 4th story, 1st apartment from south at west
Oct 3, 2020 · Apt 4W
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ... in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south
Oct 3, 2020 · Apt 3S
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ... in the entire apartment located at apt 2n, 2nd story, 1st apartment from north at east
Oct 3, 2020 · Apt 2N
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Apr 28, 2020
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 5th story
Jan 7, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective metal corince above the door at building entrance
Jan 7, 2020
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 4th room from east at south located at apt 5w, 5th story, 1st apartment from south at west
Jun 12, 2019 · Apt 5W
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, south wall, east wall, west wall, 1st window frame from west at north wall in the bathroom located at apt 5w, 5th story, 1st apartment from south at west
Jun 12, 2019 · Apt 5W
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall, south wall in the private hallway located at apt 5w, 5th story, 1st apartment from south at west
Jun 12, 2019 · Apt 5W
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st door frame from south at west wall, north wall, south wall, east wall, west wall, 1st window frame from west at north wall in the 3rd room from east located at apt 5w, 5th story, 1st apartment from south at west
Jun 12, 2019 · Apt 5W
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 4th room from east at north located at apt 5w, 5th story, 1st apartment from south at west
Jun 12, 2019 · Apt 5W
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall, east wall, west wall, 1st window frame from north at east wall in the kitchen located at apt 5w, 5th story, 1st apartment from south at west
Jun 12, 2019 · Apt 5W
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the foyer located at apt 5w, 5th story, 1st apartment from south at west
Jun 12, 2019 · Apt 5W
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st door frame from east at south wall, north wall, east wall, west wall, 1st window frame from west at north wall in the 2nd room from east at north located at apt 5w, 5th story, 1st apartment from south at west
Jun 12, 2019 · Apt 5W
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east at north located at apt 5w, 5th story, 1st apartment from south at west
Jun 12, 2019 · Apt 5W
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 5w, 5th story, 1st apartment from south at west
Jun 12, 2019 · Apt 5W
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall, 1st window frame from south at west wall in the 4th room from east at south located at apt 5w, 5th story, 1st apartment from south at west
Jun 12, 2019 · Apt 5W
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 5w, 5th story, 1st apartment from south at west
Jun 12, 2019 · Apt 5W
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at apt 5w, 5th story, 1st apartment from south at west
Jun 12, 2019 · Apt 5W
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 5w, 5th story, 1st apartment from south at west
Jun 12, 2019 · Apt 5W
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from east located at apt 5w, 5th story, 1st apartment from south at west
Oct 10, 2018 · Apt 5W
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the foyer located at apt 5w, 5th story, 1st apartment from south at west
Oct 10, 2018 · Apt 5W
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, east wall, west wall, 1st window frame from west at north wall in the 2nd room from east at north located at apt 5w, 5th story, 1st apartment from south at west
Oct 10, 2018 · Apt 5W
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway located at apt 5w, 5th story, 1st apartment from south at west
Oct 10, 2018 · Apt 5W
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, west wall, 1st window frame from west at north wall in the bathroom located at apt 5w, 5th story, 1st apartment from south at west
Oct 10, 2018 · Apt 5W
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 5w, 5th story, 1st apartment from south at west
Oct 10, 2018 · Apt 5W
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall in the 4th room from east at north located at apt 5w, 5th story, 1st apartment from south at west
Oct 10, 2018 · Apt 5W
Closed — Violation closed
DOB building violations · 12
- Landmark none
Landmk-landmark none
Dec 8, 2004
Dob violation - dismissed - Landmark none
Landmk-landmark none
Dec 8, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Landmark none
Landmk-landmark none
Apr 11, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
Show 2 more ↓
- Landmark none
Landmrk-landmark none
Feb 14, 1991
Dob violation - dismissed - Landmark none
Landmk-landmark none
Feb 14, 1991
Dob violation - dismissed
ECB violations · 2
- Class - 2
Following the receipt of a permit to erect a sidewalk shed the permit holder shall post a readily visible sign on the shed,such sign shall include (1) name/address/# (2) permit #,(3) expiration date -contractor
Mar 26, 2013
Resolve - Non-hazardous
Work w/o permit.work noted:the removal of plaster(existing)from walls & ceilings thru-out the apt.(approx 1200 s.f. of plaster).note:fire rating is being compromised due to the wall & ceilings are left exposed
Jul 27, 2006 · Penalty $500
Resolve
Complaints
- Plumbing
Water supply
Jun 25, 2026 · Apt 5W
Close - Plumbing
Bathtub/shower
Jun 25, 2026 · Apt 5W
Close - General
Bell/buzzer/intercom
Jun 25, 2026 · Apt 5W
Close - General
Bell/buzzer/intercom
Mar 4, 2026 · Apt 5W
Close - Plumbing
Water supply
Mar 4, 2026 · Apt 5W
Close - Outside building
Porch/balcony
Jan 25, 2026 · Apt 3N
Close - Heat/hot water
Entire building
Nov 3, 2025 · Apt 4E
Close - Heat/hot water
Entire building
Nov 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2025 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jul 14, 2025 · Apt 3N
Close - Heat/hot water
Entire building
Jul 12, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jun 20, 2025 · Apt 5W
Close - Heat/hot water
Entire building
Mar 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 2, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 21, 2025 · Apt 5W
Close - Heat/hot water
Entire building
Feb 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 1, 2025 · Apt 5W
Close - Heat/hot water
Entire building
Feb 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 31, 2025 · Apt 5W
Close - Heat/hot water
Entire building
Jan 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Jul 21, 2023 · Apt 5W
Close - Plumbing
Toilet
Nov 21, 2022 · Apt 5W
Close - Paint/plaster
Wall
May 5, 2022 · Apt 5A
Close - Unsanitary condition
Pests
May 5, 2022 · Apt 5A
Close - Door/window
Window frame
Dec 18, 2021 · Apt 5E
Close - Paint/plaster
Wall
Apr 4, 2021 · Apt 5N
Close - Paint/plaster
Radiator
Apr 4, 2021 · Apt 5N
Close - Plumbing
Water supply
Mar 20, 2021 · Apt 5W
Close - Plumbing
Steam pipe/riser
Feb 15, 2021 · Apt 2N
Close - Paint/plaster
Wall
Feb 15, 2021 · Apt 2N
Close - Paint/plaster
Wall
Jun 6, 2019 · Apt 5W
Close - Appliance
Refrigerator
Sep 29, 2018 · Apt 5W
Close - Plumbing
Water supply
Feb 10, 2018 · Apt 5W
Close - Heat/hot water
Entire building
Dec 28, 2017 · Apt 2N
Close - General
Mailbox
Mar 21, 2017 · Apt 2W
Close - Door/window
Door
Mar 21, 2017 · Apt 2W
Close - Paint/plaster
Wall
Mar 21, 2017 · Apt 2W
Close - Appliance
Electric/gas range
Mar 21, 2017 · Apt 2W
Close - Door/window
Window frame
Mar 21, 2017 · Apt 2W
Close - Flooring/stairs
Floor
Mar 9, 2017 · Apt 2W
Close - Door/window
Door
Mar 9, 2017 · Apt 2W
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1895
- Floors
- 5
- Residential units
- 12
- Building area
- 12,090 ft²
- Lot area
- 2,720 ft²
- Zoning
- C2-7A
- Community board
- 107
- Council district
- 6
- Block / lot
- 1227 / 36
- Assessed value
- $2,498,400
- Landmark / historic district
- Upper West Side / Central Park West Historic District
HPD registration #120741, last renewed Aug 15, 2025.
Questions about 416 Amsterdam Avenue
Who owns 416 Amsterdam Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 200 W 80th Owner LLC.
Does 416 Amsterdam Avenue have violations?
Yes. NYC HPD has recorded 106 housing violations at this property.
Is 416 Amsterdam Avenue rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 25% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 416 Amsterdam Avenue built?
City records list 1895 as the year it was built.
How many apartments are in 416 Amsterdam Avenue?
It has 12 residential units and 17 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.