50 West 86 Street
Manhattan, NY 10024BBL 1-01199-0060Map
Owner of record: Fifth West Eighty Sixth, LLC
50 West 86 Street is a walk-up apartment building built in 1907 in Manhattan, 10024. It has 9 residential units across 5 floors. The owner of record is Fifth West Eighty Sixth, LLC. HPD has recorded 34 housing violations here, most recently on October 14, 2026. 26 of the 34 most recent violations are still open.
- HPD violations
- 34
- DOB violations
- 10
- ECB violations
- 0
- HPD complaints
- 44
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 34
- ANon-hazardous
Properly secure the loose electrical outlet at south wall in the 1st room from north located at apt ph1 upper level, 4th story, 1st apartment from south at west
Oct 14, 2026 · Apt PH1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt ph1, 4th story, 1st apartment from south at west
Oct 14, 2026 · Apt PH1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt ph1, 4th story, 1st apartment from south at west
Oct 14, 2026 · Apt PH1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt ph1, 4th story, 1st apartment from south at west
Oct 14, 2026 · Apt PH1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the 1st room from north at west located at apt ph1, 4th story, 1st apartment from south at west
Oct 14, 2026 · Apt PH1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at west located at apt ph1, 4th story, 1st apartment from south at west
Oct 14, 2026 · Apt PH1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt ph1, 4th story, 1st apartment from south at west
Oct 14, 2026 · Apt PH1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt ph1, 4th story, 1st apartment from south at west
Oct 14, 2026 · Apt PH1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balances at lower sash of 1st window from west at north in the 1st room from north located at apt 3c, 3rd story, 1st apartment from south at west
Jun 22, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balances at lower sash of 2nd window from west at north in the 1st room from north located at apt 3c, 3rd story, 1st apartment from south at west
Jun 22, 2026 · Apt 3C
Open — Nov sent out
Show 24 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the private hallway located at apt 3c, 3rd story, 1st apartment from south at west
Jun 22, 2026 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3c, 3rd story, 1st apartment from south at west
Jun 22, 2026 · Apt 3C
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt b3, 2nd story, 1st apartment from south at west
Aug 13, 2019 · Apt B3
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt b3, 2nd story, 1st apartment from south at west
Aug 13, 2019 · Apt B3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cement at exterior wall at deck in the 2nd room from north located at apt b3, 2nd story, 1st apartment from south at west
Aug 13, 2019 · Apt B3
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items stored at public hall, 1st story
Aug 13, 2019
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items stored at public hall, 4th story
Aug 13, 2019
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items stored at public hall, 5th story
Aug 13, 2019
Open — Nov sent out - BHazardous
Provide a piece of garden hose 10 feet in length with female coupling and a 10 quart pail on premises to test sprinkler system. at public hall, 5th story
Aug 13, 2019
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of bicycle stored at public hall stairs, 5th story
Aug 13, 2019
Open — Nov sent out - BHazardous
Replace with new the missing upper and lower metal screen at skylight at roof
Aug 13, 2019
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
Aug 13, 2019
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 26, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 3, 2015
Closed — Violation dismissed - ANon-hazardous
D26-20.08,20.09 adm code file certification of satisfactory installation of smoke detecting device in accordance with h.p.d. rules and regulations.
Jul 30, 1990
Closed — Violation closed - BHazardous
D26-10.01 adm code & 309 m/d law abate the nuisance consisting of broken defective wood deck causing trip hazard terrace at rear 2 sty rear west apt b3. , section '' ''
Jul 3, 1986 · Apt B3
Closed — Violation closed
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Mold
Oct 7, 2026 · Apt PH1
Close - Electric
Outlet/switch
Oct 7, 2026 · Apt PH1
Close - Safety
Smoke detector
Oct 7, 2026 · Apt PH1
Close - Door/window
Door
Oct 7, 2026 · Apt PH1
Close - Safety
Carbon monoxide detector
Oct 7, 2026 · Apt PH1
Close - Water leak
Heavy flow
Jun 12, 2026 · Apt 3C
Close - Water leak
Heavy flow
Jun 12, 2026 · Apt 3C
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Water leak
Slow leak
Feb 4, 2026 · Apt C3
Close - Unsanitary condition
Mold
Feb 4, 2026 · Apt C3
Close
Show 34 more ↓
- Unsanitary condition
Pests
Feb 4, 2026 · Apt C3
Close - Heat/hot water
Apartment only
Jan 6, 2023 · Apt 3
Close - Heat/hot water
Apartment only
Dec 30, 2022 · Apt B3
Close - General
Cooking gas
Jul 1, 2022 · Apt BLDG
Close - General
Cooking gas
Jul 1, 2022 · Apt A2
Close - Heat/hot water
Apartment only
Nov 3, 2019 · Apt B1
Close - Door/window
Window frame
Oct 24, 2019 · Apt B1
Close - Plumbing
Basin/sink
Oct 20, 2019 · Apt B1
Close - Appliance
Electric/gas range
Oct 20, 2019 · Apt B1
Close - Heat/hot water
Apartment only
Oct 20, 2019 · Apt B1
Close - Plumbing
Bathtub/shower
Oct 20, 2019 · Apt B1
Close - Door/window
Window frame
Oct 20, 2019 · Apt B1
Close - General
Floor
Apr 16, 2013 · Apt C3
Close - Construction
Pavement
Apr 16, 2013 · Apt C3
Close - General
Doors
Apr 16, 2013 · Apt C3
Close - General
Cabinet
Apr 16, 2013 · Apt C3
Close - Electric
Wiring
Apr 16, 2013 · Apt C3
Close - General
Doors
Apr 16, 2013 · Apt C3
Close - Electric
Wiring
Apr 16, 2013 · Apt C3
Close - General
Windows
Apr 16, 2013 · Apt C3
Close - Electric
Wiring
Apr 16, 2013 · Apt C3
Close - Electric
Wiring
Apr 16, 2013 · Apt C3
Close - Heating
Heat related
Apr 16, 2013 · Apt C3
Close - Nonconst
Vermin
Apr 16, 2013 · Apt C3
Close - Paint/plaster
Wall
Apr 16, 2013 · Apt C3
Close - General
Doors
Apr 16, 2013 · Apt C3
Close - General
Floor
Apr 16, 2013 · Apt C3
Close - General
Windows
Apr 16, 2013 · Apt C3
Close - General
Windows
Apr 16, 2013 · Apt C3
Close - Heating
Heat related
Apr 16, 2013 · Apt C3
Close - Heating
Heat related
Apr 16, 2013 · Apt C3
Close - Nonconst
Vermin
Apr 16, 2013 · Apt C3
Close - Heating
Heat related
Apr 15, 2013 · Apt C3
Close - Nonconst
Vermin
Oct 6, 2006 · Apt PH2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1907
- Floors
- 5
- Residential units
- 9
- Building area
- 6,981 ft²
- Lot area
- 2,554 ft²
- Zoning
- R10A
- Community board
- 107
- Council district
- 6
- Block / lot
- 1199 / 60
- Assessed value
- $1,897,200
- Landmark / historic district
- Upper West Side / Central Park West Historic District
HPD registration #137058, last renewed Nov 14, 2025.
Questions about 50 West 86 Street
Who owns 50 West 86 Street?
The owner of record in NYC Department of City Planning PLUTO data is Fifth West Eighty Sixth, LLC.
Does 50 West 86 Street have violations?
Yes. NYC HPD has recorded 34 housing violations at this property.
Is 50 West 86 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 50 West 86 Street built?
City records list 1907 as the year it was built.
How many apartments are in 50 West 86 Street?
It has 9 residential units and 10 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.