80 West 82 Street
Manhattan, NY 10024BBL 1-01195-0064Map
Owner of record: Walber 82nd St Assoctes
80 West 82 Street is a walk-up apartment building built in 1891 in Manhattan, 10024. It has 8 residential units across 5 floors. The owner of record is Walber 82nd St Assoctes. HPD has recorded 42 housing violations here, most recently on August 26, 2026. 19 of the 42 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.
- HPD violations
- 42
- DOB violations
- 7
- ECB violations
- 7
- HPD complaints
- 54
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 42
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west
Aug 26, 2026 · Apt 2C
Open — Notice of issuance sent to tenant - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper., 1st story
Aug 26, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Aug 26, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Aug 26, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Aug 26, 2026
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective intercom system from east wall at vestibule to receiving panel at west wall in the private hallway located at apt 2b, 2nd story, 1st apartment from south at west
Apr 16, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Dec 28, 2025 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Dec 28, 2025 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Aug 6, 2025 · Apt 2B
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Aug 6, 2025 · Apt 2B
Open — Nov sent out
Show 32 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door
Aug 6, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective intercom system panel at west wall in the private hallway located at apt 2b, 2nd story, 1st apartment from south at west
Jun 11, 2025 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sloping wood floor in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
Jun 11, 2025 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at west in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Jun 11, 2025 · Apt 2B
Open — Nov sent out - ANon-hazardous
Refit closet door at north in the 4th room from north located at apt 2b, 2nd story, 1st apartment from south at west
Jun 11, 2025 · Apt 2B
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq. ft. underneath cabinet at sink in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west original violation 17976703 issued 11-jun-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jun 11, 2025 · Apt 2B
Open — Defect letter issued - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq. ft. underneath cabinet at sink in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Jun 11, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall around window opening in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west original violation 17923239 issued 28-may-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
May 28, 2025 · Apt 2B
Open — Defect letter issued - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall around window opening in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
May 28, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective defective intercom system from the building entrance to the panel at west wall in the foyer located at apt 2b, 2nd story, 1st apartment from south at west
May 28, 2025 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2b, 2nd story, 1st apartment from south at west
May 28, 2025 · Apt 2B
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 16, 2022
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bikes at public hall, 1st story
Oct 6, 2016
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at public hall ceiling , 3rd story
Oct 6, 2016
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at public hall ceiling at public hall, 4th story
Oct 6, 2016
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at public hall ceiling , 5th story
Oct 6, 2016
Closed — Violation dismissed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of an extention cord with junctionbox with outlets attched to a balaster at 5th story down going out the window at 1st story at public hall
Oct 6, 2016
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12. at public hall
Oct 6, 2016
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of a large box at public hall, 3rd story
Oct 6, 2016
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 6, 2016
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 6, 2016
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Oct 6, 2016
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Oct 6, 2016
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood wall below window in the kitchen located at apt 5c, 5th story, 1st apartment from west at north
Apr 12, 2011 · Apt 5C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor next to radiator in the kitchen located at apt 5c, 5th story, 1st apartment from west at north
Apr 12, 2011 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north at west located at apt 5c, 5th story, 1st apartment from west at north
Apr 12, 2011 · Apt 5C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department window frame in the kitchen located at apt 5c, 5th story, 1st apartment from west at north
Apr 12, 2011 · Apt 5C
Closed — Violation dismissed - ANon-hazardous
Paint or post a sign indicating floors on wall at or near all stys public hall stairs.
Jan 8, 1993
Closed — Violation dismissed
DOB building violations · 7
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Landmark none
Landmk-landmark none
Jun 27, 2006
Dob violation - dismissed - Landmark none
Landmk-landmark none
Jun 27, 2006
Dob violation - dismissed - Landmark none
Landmk-landmark none
Jun 27, 2006
Dob violation - dismissed
ECB violations · 7
- Class - 2
Failure to comply with commissioner's order to file a certificate of correction with the department of buildings: upon inspection observed the facade at exposure #4 with cracks and deterioration. previous compl
Jul 16, 2021 · Penalty $1,250
Active - Class - 2
Failure to maintain building exterior and interior walls in a code complaint manner. noted: multiple vertical cracks, spalling of bricks and concrete throughout exposure # 4 at columbus avenue side. also, broke
Jul 13, 2020 · Penalty $625
Resolve - Class - 2
Failure to post or distribute safety construction bill of rights. noted: at the time of inspection it was observed that the contractor failed to post/distribute scbofr., post or distribute safe construction bil
Jun 1, 2019 · Penalty $1,250
Active - Class - 2
Failure to post or distribute tenant protection plan. noted: at the time of inspection it was observed that the contractor did not distribute or post tpp to tenants, post or distribute notice of tpp
Jun 1, 2019 · Penalty $1,250
Active - Class - 2
Failure to maintain retaining wall in a safe condition. noted: at the time of inspection we noted that the retaining wall is leanign and ex hibiting structural duress. immediately retain a structural licensed
Jan 8, 2019
Resolve - Class - 2
Failed to obtain a temporary construction permit prior to installation/use of sidewalk shed (1)expired permit #104861829 12/31/07 remedy:re-new permit.
Dec 24, 2008 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit work noted interior partitions wood stud and plaster have been removed and new wood and metal studding erected in apt 2s 2n second sty north and osuth apartment
Oct 26, 1988
Resolve
Complaints
- Unsanitary condition
Pests
Aug 4, 2026 · Apt 2C
Close - Unsanitary condition
Pests
Aug 4, 2026 · Apt 2BAND2
Close - Unsanitary condition
Pests
Aug 4, 2026 · Apt 2BAND2
Close - Unsanitary condition
Pests
Aug 1, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Aug 1, 2026 · Apt 2B
Close - General
Bell/buzzer/intercom
Jan 29, 2026 · Apt 2B
Close - Door/window
Door
Jan 29, 2026 · Apt 2B
Close - Door/window
Door
Jan 29, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt 2B
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 28, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 26, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Dec 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 26, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Dec 26, 2025 · Apt 2B
Close - Plumbing
Water supply
Dec 25, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Dec 25, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Jul 30, 2025 · Apt 2B
Close - General
Bell/buzzer/intercom
Jul 30, 2025 · Apt 2B
Close - Paint/plaster
Wall
Jul 30, 2025 · Apt 2B
Close - Door/window
Window frame
Jun 7, 2025 · Apt 2B
Close - Plumbing
Bathtub/shower
Jun 6, 2025 · Apt 2B
Close - Door/window
Window frame
Jun 6, 2025 · Apt 2B
Close - Flooring/stairs
Floor
Jun 6, 2025 · Apt 2B
Close - General
Bell/buzzer/intercom
Jun 6, 2025 · Apt 2B
Close - Unsanitary condition
Mold
Jun 6, 2025 · Apt 2B
Close - Unsanitary condition
Mold
May 29, 2025 · Apt 2B
Close - Unsanitary condition
Mold
May 20, 2025 · Apt 2B
Close - General
Bell/buzzer/intercom
May 19, 2025 · Apt 2B
Close - Unsanitary condition
Mold
May 19, 2025 · Apt 2B
Close - Unsanitary condition
Pests
May 19, 2025 · Apt 2B
Close - Electric
Outlet/switch
May 19, 2025 · Apt 2B
Close - Appliance
Refrigerator
May 19, 2025 · Apt 2B
Close - Flooring/stairs
Floor
May 19, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Feb 1, 2021 · Apt 2A
Close - Paint/plaster
Wall
Jul 13, 2020 · Apt STORE
Close - Heat/hot water
Entire building
Dec 30, 2017 · Apt 4C
Close - Heat/hot water
Entire building
Nov 11, 2017 · Apt 5A
Close - Heat/hot water
Apartment only
Nov 11, 2017 · Apt 2C
Close - Heat/hot water
Entire building
Oct 30, 2017 · Apt 3B
Close - Heat/hot water
Entire building
Oct 30, 2017 · Apt 2C
Close - Heat/hot water
Entire building
Feb 24, 2017 · Apt 2A
Close - Unsanitary condition
Garbage/recycling storage
Oct 2, 2016 · Apt BLDG
Close - Heating
Heat related
Nov 12, 2011 · Apt 5C
Close - General
Floor
Apr 11, 2011 · Apt 5C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1891
- Floors
- 5
- Residential units
- 8
- Building area
- 12,780 ft²
- Lot area
- 3,065 ft²
- Zoning
- C1-8A
- Community board
- 107
- Council district
- 6
- Block / lot
- 1195 / 64
- Assessed value
- $2,377,800
- Landmark / historic district
- Upper West Side / Central Park West Historic District
HPD registration #107030, last renewed Aug 8, 2025.
Questions about 80 West 82 Street
Who owns 80 West 82 Street?
The owner of record in NYC Department of City Planning PLUTO data is Walber 82nd St Assoctes.
Does 80 West 82 Street have violations?
Yes. NYC HPD has recorded 42 housing violations at this property.
Is 80 West 82 Street rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 13% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 80 West 82 Street built?
City records list 1891 as the year it was built.
How many apartments are in 80 West 82 Street?
It has 8 residential units and 12 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.