120 West 71 Street
Manhattan, NY 10023BBL 1-01142-0041Map
Owner of record: 120 West 71 Street LLC
120 West 71 Street is a walk-up apartment building built in 1886 in Manhattan, 10023. It has 10 residential units across 4 floors. The owner of record is 120 West 71 Street LLC. HPD has recorded 33 housing violations here, most recently on June 4, 2025. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 33
- DOB violations
- 3
- ECB violations
- 0
- HPD complaints
- 36
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 33
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Jun 6, 2022 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Jun 6, 2022 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective , in the entrance located at apt 2f, 2nd story, 1st apartment from north at east
Jun 6, 2022 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Jun 6, 2022 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Jun 6, 2022 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at bsmt-apt 1r, 1st bsmt-apt from east at south
Oct 13, 2021 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 3rd room from north located at bsmt-apt 1r, 1st bsmt-apt from east at south
Oct 13, 2021 · Apt 1R
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling ( approx.10.sq.ft. ) and south wall ( approx.10.sq.ft. ) in the 3rd room from north located at bsmt-apt 1r, 1st bsmt-apt from east at south
Oct 13, 2021 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at bsmt-apt 1r, 1st bsmt-apt from east at south
Oct 13, 2021 · Apt 1R
Closed — Violation dismissed
Show 23 more ↓
- BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at bsmt-apt 1r, 1st bsmt-apt from east at south
Oct 13, 2021 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at bsmt-apt 1r, 1st bsmt-apt from east at south
Oct 13, 2021 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective locking device at door leading to building entrance
Mar 19, 2019
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the stairs at front areaway
Sep 6, 2018
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, section ''basement''
Sep 6, 2018
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, section ''basement''
Sep 6, 2018
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east located at apt 1r, 1st story, 1st apartment from east at south
Dec 8, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 1r, 1st story, 1st apartment from east at south
Dec 8, 2017 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Dec 5, 2017
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of mattress, ladder and construction material at public hall, 1st story
Dec 5, 2017
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 3f, 3rd story
Oct 31, 2017 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3f, 3rd story
Oct 31, 2017 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at lobby
Sep 20, 2016
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardent material at south wall at lobby
Sep 20, 2016
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall at lobby
Sep 20, 2016
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby
Sep 20, 2016
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing missing at lobby
Sep 20, 2016
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at lobby
Sep 20, 2016
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the foyer located at apt 2r, 2nd story, 1st apartment from east at south
Jun 11, 2007 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 1st room from north located at apt 2r, 2nd story, 1st apartment from east at south
Jun 11, 2007 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening lockable slide bolt at bulkhead door to roof
Jun 11, 2007
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from east at south
Jun 11, 2007 · Apt 2R
Closed — Violation dismissed
DOB building violations · 3
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 5, 1988
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Pests
Aug 9, 2023 · Apt 1R
Close - Paint/plaster
Ceiling
Aug 9, 2023 · Apt 1R
Close - Water leak
Slow leak
Nov 30, 2021 · Apt 2F
Close - Water leak
Heavy flow
Nov 30, 2021 · Apt 2F
Close - Water leak
Heavy flow
Oct 8, 2021 · Apt 1R
Close - Unsanitary condition
Mold
Oct 8, 2021 · Apt 1R
Close - Paint/plaster
Ceiling
Oct 8, 2021 · Apt 1R
Close - General
Bell/buzzer/intercom
Dec 20, 2019 · Apt 5R
Close - Door/window
Door
Mar 3, 2019 · Apt FRONT
Close - Door/window
Door
Mar 3, 2019 · Apt BLDG
Close
Show 26 more ↓
- General
Signage missing
Feb 7, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 7, 2018 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 7, 2018 · Apt BLDG
Close - Plumbing
Radiator
Nov 28, 2017 · Apt 1R
Close - Paint/plaster
Ceiling
Nov 28, 2017 · Apt 1R
Close - Unsanitary condition
Mold
Nov 28, 2017 · Apt 1R
Close - Plumbing
Radiator
Nov 28, 2017 · Apt 1R
Close - Paint/plaster
Wall
Nov 28, 2017 · Apt 1R
Close - Paint/plaster
Wall
Nov 28, 2017 · Apt 1R
Close - Unsanitary condition
Pests
Nov 28, 2017 · Apt 1R
Close - Heat/hot water
Entire building
Oct 30, 2017 · Apt 3F
Close - Paint/plaster
Wall
Sep 12, 2016 · Apt 3R
Close - Unsanitary condition
Mold
Sep 13, 2014 · Apt 4R
Close - General
Cooking gas
Sep 13, 2014 · Apt 4R
Close - Heat/hot water
Entire building
Mar 11, 2014 · Apt 4R
Close - Heating
Heat related
Oct 27, 2013 · Apt 4R
Close - General
Doors
Apr 25, 2012 · Apt 1F
Close - Heating
Heat related
Jan 25, 2009 · Apt BLDG
Close - Heating
Heat related
Oct 18, 2008 · Apt 2R
Close - Plumbing
Water supply
Dec 1, 2007 · Apt 4F
Close - Heating
Heat related
Dec 1, 2007 · Apt 4F
Close - Plumbing
Water-leaks
Jun 13, 2007 · Apt 1F
Close - Plumbing
Water-leaks
May 21, 2007 · Apt 2R
Close - Nonconst
Vermin
Aug 15, 2005 · Apt 3R
Close - Nonconst
Vermin
Aug 15, 2005 · Apt 3R
Close - Electric
Bell-buzzer/intercom
Mar 4, 2005 · Apt 5R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1886
- Floors
- 4
- Residential units
- 10
- Building area
- 7,431 ft²
- Lot area
- 2,109 ft²
- Zoning
- R8B
- Community board
- 107
- Council district
- 6
- Block / lot
- 1142 / 41
- Assessed value
- $1,873,800
- Landmark / historic district
- Upper West Side / Central Park West Historic District
HPD registration #101524, last renewed Nov 13, 2025.
Questions about 120 West 71 Street
Who owns 120 West 71 Street?
The owner of record in NYC Department of City Planning PLUTO data is 120 West 71 Street LLC.
Does 120 West 71 Street have violations?
Yes. NYC HPD has recorded 33 housing violations at this property.
Is 120 West 71 Street rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 20% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 120 West 71 Street built?
City records list 1886 as the year it was built.
How many apartments are in 120 West 71 Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.