331 Columbus Avenue
Manhattan, NY 10023BBL 1-01128-0061Map
Owner of record: 60 West 76th Street LLC
331 Columbus Avenue is an elevator apartment building built in 1894 in Manhattan, 10023. It has 56 residential units across 7 floors. The owner of record is 60 West 76th Street LLC. HPD has recorded 103 housing violations here, most recently on April 29, 2026. 19 of the 50 most recent violations are still open. City tax records listed 32 rent-stabilized apartments here in 2024.
- HPD violations
- 103
- DOB violations
- 47
- ECB violations
- 26
- HPD complaints
- 100
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 103
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
May 2, 2024
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front areaway
May 2, 2024
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of vermin fleas in the entire apartment located at apt 5c, 5th story, 2nd apartment from east at south
Dec 27, 2023 · Apt 5C
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 5c, 5th story, 2nd apartment from east at south
Dec 27, 2023 · Apt 5C
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 6c, 6th story, 2nd apartment from east at south
Oct 31, 2023 · Apt 6C
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 6c, 6th story, 2nd apartment from east at south
Oct 31, 2023 · Apt 6C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 6c, 6th story, 2nd apartment from east at south
Oct 31, 2023 · Apt 6C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 6c, 6th story, 2nd apartment from east at south
Oct 31, 2023 · Apt 6C
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective light fixture at south wall in the bathroom located at apt 6c, 6th story, 2nd apartment from east at south
Oct 31, 2023 · Apt 6C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at the ceiling in the bathroom located at apt 6c, 6th story, 2nd apartment from east at south
Oct 31, 2023 · Apt 6C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective door frame in the bathroom located at apt 6c, 6th story, 2nd apartment from east at south
Oct 31, 2023 · Apt 6C
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroom located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at wainscotting at south wall, 1st closet from north at east wall door frame in the 2nd room from east located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at north, the 3rd room from east at south located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at south located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the bathroom located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 3rd room from east at south located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st door frame from west at north wall, 1st door frame from west at north wall in the foyer located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the foyer located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallway located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st door from west at north wall in the foyer located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame in the private hallway located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the 2nd room from east located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, 1st window frame from south at west wall in the bathroom located at apt 2c, 2nd story, 2nd apartment from east at south
Apr 27, 2023 · Apt 2C
Open — Defect letter issued - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods drop ladder obstructed by side walk shed second stack from east drop ladder obstructed by sidewalk shed, first stack from east and second stack from east at builidng front at fire escape at north
Mar 15, 2022
Closed — Violation dismissed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods drop ladder obstructed by sidewalk shed, first stack from east and second stack from east at builidng front at fire escape at north
Mar 15, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 1a, 1st story, 1st apartment from north at east
Feb 28, 2022 · Apt 1A
Closed — Violation dismissed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 7e, 7th story, 3rd apartment from north at east
Feb 28, 2022 · Apt 7E
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 0; located at apt 1a, 1st story, 1st apartment from north at east
Feb 28, 2022 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 3rd room from north at east located at apt 1a, 1st story, 1st apartment from north at east
Feb 28, 2022 · Apt 1A
Closed — Violation dismissed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 7c, 7th story, 3rd apartment from east at south
Feb 28, 2022 · Apt 7C
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4g, 4th story, 1st apartment from north at east
Feb 28, 2022 · Apt 4G
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3h, 3rd story, 1st apartment from east at south
Feb 28, 2022 · Apt 3H
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3i, 3rd story, 2nd apartment from north at east
Feb 28, 2022 · Apt 3I
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2e, 2nd story, 3rd apartment from north at east
Feb 28, 2022 · Apt 2E
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1b, 1st story, 1st apartment from east at south
Feb 28, 2022 · Apt 1B
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6b, 6th story, 1st apartment from south at west
Feb 16, 2022 · Apt 6B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 5i, 5th story, 2nd apartment from south at west
Feb 16, 2022 · Apt 5I
Closed — Violation dismissed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5i, 5th story, 2nd apartment from south at west
Feb 16, 2022 · Apt 5I
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5i, 5th story, 2nd apartment from south at west
Feb 16, 2022 · Apt 5I
Closed — Violation dismissed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 7a, 7th story, 1st apartment from west at north
Feb 16, 2022 · Apt 7A
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 7h, 7th story, 1st apartment from east at south
Feb 16, 2022 · Apt 7H
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5h, 5th story, 1st apartment from east at south
Feb 16, 2022 · Apt 5H
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5d, 5th story, 2nd apartment from east at south
Feb 16, 2022 · Apt 5D
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5c, 5th story, 3rd apartment from east at south
Feb 16, 2022 · Apt 5C
Open — Nov sent out
DOB building violations · 47
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2018
Mar 18, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Landmark none
Landmk-landmark none
Nov 17, 2016
Dob violation - dismissed - Landmark none
Landmk-landmark none
Nov 17, 2016
Dob violation - dismissed - Landmark none
Landmk-landmark none
Nov 17, 2016
Dob violation - dismissed
Show 37 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2016
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2016
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jun 30, 2015
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Jun 30, 2015
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 21, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 23, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 2012
Dob violation - resolved - Construction other optional
C-construction other optional
Jun 17, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 13, 2011
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2010
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 21, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 21, 2008
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 1, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 1, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2003
Dob violation - resolved - Elevator elevatorrequired
1p8906
Jan 4, 2002
Dob violation - resolved - Elevator elevatorrequired
1p8907
Jan 4, 2002
Dob violation - resolved - Elevator elevatorrequired
1p8906
Dec 27, 2000
Dob violation - resolved - Elevator elevatorrequired
1p8907
Dec 27, 2000
Dob violation - resolved - Elevator elevatorrequired
1p8906
Jan 6, 2000
Dob violation - resolved - Elevator elevatorrequired
1p8907
Jan 6, 2000
Dob violation - resolved - Elevator elevatorrequired
1p8906
Mar 11, 1999
Dob violation - resolved - Elevator elevatorrequired
1p8907
Mar 11, 1999
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 1993
Vp*-violation unserved ecb- dismissed - Electric signs none
Es-electric signs none
Jun 4, 1992
Dob violation - dismissed - Electric signs none
Es-electric signs none
Jan 7, 1992
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 21, 1990
Dob violation - resolved
ECB violations · 26
- Class - 2
Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #903467. remedy: submit acceptable requ
Apr 11, 2024 · Penalty $3,125
Resolve - Class - 2
Failure to file acceptable amended cycle 7b and 8b indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #803467.remedy:fil acceptable report.
Oct 8, 2021 · Penalty $3,125
Resolve - Class - 1
Bc 3314.8.2 supported scaffolding netting note:at time of comp inspection at 7 story occupied building i observed sidewalk shed erected withpipe scaffold on top supported pipe scaffold netting was inadequately
Apr 19, 2021
Resolve - Class - 2
Bc3314.8.2 damaged/unsecured debris netting.atoi observed sws&supported scf@exp4 w/valid work permit.during insp noted damaged/unsecure debris netting around supported scf creating unsafe condition for debris t
Apr 19, 2021
Resolve - Class - 2
Pedestrian protection does not meet code specifications.note at time of inspection i observed sidewalk shed in place missing required extension on w 76 st side.remedy:comply with code-provide extension.
Feb 4, 2020 · Penalty $2,400
Resolve - Class - 1
Bc3314-supported scaffold not to code specification.at time of inspection i observed supported scaffold in place with (1) unsecured planking(2)loose netting (3)guardrails missing.remedy:comply with code,only al
Feb 4, 2020 · Penalty $2,500
Resolve - Class - 2
Pedestrian protection does not meet code specifications.note at time of inspection i observed sidewlak shed in place without infrmation panel on parapet.remedy:comply with code-provide information panel.
Feb 4, 2020
Resolve - Class - 2
Failure to maintain.note:at time of inspection i observed sidewalk shed in place not maintained,1.some bracing not secured.2)some bulbs out 3)fire escapes blocked.rem:comply with code-maintain sidewalk shed
Oct 22, 2018 · Penalty $2,400
Resolve - Class - 2
Expired permit.note:@ time of inspection i observe supported scaffold in place with permit #140701550 expired 10/4/2018.rem:comply with code-renew permit
Oct 22, 2018
Resolve - Class - 2
Failure to provide information panel.note:at time of inspection i observed sidewalk shed in place without information panel on parapet.rem:comply with code-provide information panel
Oct 22, 2018 · Penalty $1,250
Resolve
Show 16 more ↓
- Class - 2
Failure to file acceptable cycle 8b report indicating corrections of unsafe conditions described in initial facades report by 28-302.5 for control # 803467. aggi prior nov 37001405n under 28-302.5
Aug 1, 2018 · Penalty $3,125
Resolve - Class - 2
Failure to file acceptable amended report indicating correction of unsafe conditions described in nitial local law 11/98 report. remedy: file acceptable amended report.
Nov 7, 2016 · Penalty $800
Resolve - Class - 2
Failure to maintain bldg in a code compliant manner.noted in apt 6c in living room section of celing approximately, 8' x 4' has fallen onto floor. rem:repair and/or replace.
Jul 15, 2014 · Penalty $250
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Jul 14, 2014 · Penalty $2,000
Resolve - Class - 1
Failure to maintain building in code-complaint manner. note: (brick) parapet wall at roof does not conform to building code of 42" high. at east wall height of parapet is 10". remedy: comply w/code provide
Oct 19, 2010 · Penalty $2,500
Resolve - Class - 1
Unlawful acts. failure to comply w/an order of the commissioner. note: respondent failed to correct the conditions cited in the prior n.o.v. 34863134k for failure to maintain building in code-compliant manners
Oct 19, 2010 · Penalty $2,400
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner.noted:brick parapet wall @ roof,does not comply w/ the bldg code,which mandates a height of 42".worst case is wall on the east,which is approx 10" high.repair &
Jun 29, 2010 · Penalty $1,000
Resolve - Class - 2
Failure to comply w/ the commissioner's order to file a certificate ofcorrection w/ the dob.noted:respondent failed to comply w/ the commis sioner's order to correct the violating conditions & file a certificat
Jun 29, 2010 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in code compliant manner.noted:the following condition:brick parapet walls do not comply w/the bldg code section 1509.8 which requires the parapet to be 42 inches in height.note:in the
Feb 16, 2010 · Penalty $1,000
Resolve - Class - 3
Work does not conform to approved construction documents and/or approved amendments noted work contrary to approved drawings dated 2/6/07 under application #104625871 non-conforming work non installation of new
Jul 21, 2009 · Penalty $200
Resolve - Non-hazardous
55y13.57h10.58y02.89q0360t07.41g11.41n09.58v01.85m05.86bb05.21m07.36o02.36t07.36w06.39y02.38y02.52h11.55y seal leakds 57h play in worm & gear 58y residue on drum 59q provde light guards 60t provide current co
Mar 12, 2008 · Penalty $2,500
Resolve - Non-hazardous
85bb05.86bb05.36t07.12q03.52h11.17m11.16d06.16e01.84x10.31h11.55y13.58y02.57h11.21m07.66o02.66i10 85,86bb exp. 2 & 5 yr tags 36t provide sign 12q provide light 52m kink in gov. rope 17,16,h,d,e adjust & properl
Mar 12, 2008 · Penalty $2,500
Resolve - Non-hazardous
Work contrary to approved plans. noted: sidewalk shed under appl. #103810039 contrary to plans-razor wire width of building (approx. 90'-100'0) installed on shed, north (76th str) and west (columbus ave) approx
Sep 14, 2004 · Penalty $2,500
Resolve - Non-hazardous
33p 33o no ladder to entrance
Feb 8, 1993
Resolve - Non-hazardous
Work without a permit.expired permit erected temporary fence approx. 70' length x 20' height @ 1st story, under alt 2 permit #100237691 exp4/19/91. remedy:renew permit forthwith.
Jun 6, 1991
Resolve - Hazardous
Failure to have approve plans available for pa inspection remedy provide approved pa plans
Oct 19, 1988
Resolve
Complaints
- Heat/hot water
Entire building
Mar 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 25, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 12, 2024 · Apt 5G
Close - Unsanitary condition
Garbage/recycling storage
Jan 27, 2024 · Apt BLDG
Close - Flooring/stairs
Floor
Dec 19, 2023 · Apt 5C
Close - Unsanitary condition
Pests
Dec 19, 2023 · Apt 5C
Close - Unsanitary condition
Mold
Dec 19, 2023 · Apt 5C
Close - Unsanitary condition
Mold
Oct 31, 2023 · Apt 7C
Close - Heat/hot water
Apartment only
Oct 30, 2023 · Apt 4E
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Oct 25, 2023 · Apt 6C
Close - Heat/hot water
Entire building
Oct 21, 2023 · Apt 3C
Close - Water leak
Damp spot
Oct 18, 2023 · Apt 7C
Close - Water leak
Damp spot
Oct 18, 2023 · Apt 7C
Close - Heat/hot water
Apartment only
Oct 17, 2023 · Apt 2H
Close - Unsanitary condition
Mold
Oct 14, 2023 · Apt 6C
Close - Heat/hot water
Entire building
Oct 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 23, 2023 · Apt BLDG
Close - Plumbing
Water supply
Sep 23, 2023 · Apt 2A
Close - General
Bell/buzzer/intercom
Sep 6, 2023 · Apt 3C
Close - Unsanitary condition
Garbage/recycling storage
Jun 14, 2023 · Apt BLDG
Close - Unsanitary condition
Mold
Apr 26, 2023 · Apt 2C
Close - Paint/plaster
Wall
Dec 27, 2022 · Apt 4F
Close - Door/window
Window frame
Dec 27, 2022 · Apt 4F
Close - Water leak
Slow leak
Dec 27, 2022 · Apt 4F
Close - Water leak
Slow leak
Dec 27, 2022 · Apt 4F
Close - Unsanitary condition
Mold
Dec 27, 2022 · Apt 4F
Close - Plumbing
Radiator
Dec 24, 2022 · Apt 2B
Close - Plumbing
Toilet
Dec 17, 2022 · Apt 2H
Close - Safety
Fire escape
Oct 23, 2022 · Apt BASEME
Close - Unsanitary condition
Pests
Oct 13, 2022 · Apt 4G
Close - Heat/hot water
Entire building
Mar 12, 2022 · Apt BLDG
Close - Plumbing
Water supply
Feb 16, 2022 · Apt 5I
Close - Unsanitary condition
Mold
Jun 24, 2021 · Apt 4F
Close - Water leak
Slow leak
Jun 15, 2021 · Apt 4F
Close - Water leak
Slow leak
Jun 7, 2021 · Apt 4F
Close - Heat/hot water
Entire building
Mar 28, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 28, 2021 · Apt 1B
Close - Heat/hot water
Entire building
Mar 28, 2021 · Apt BLDG
Close - General
Bell/buzzer/intercom
Feb 18, 2021 · Apt 3C
Close - General
Bell/buzzer/intercom
Feb 18, 2021 · Apt 3C
Close - Electric
No lighting
Feb 18, 2021 · Apt 6H
Close - Paint/plaster
Ceiling
Feb 18, 2021 · Apt 6H
Close - Heat/hot water
Entire building
Feb 17, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2021 · Apt 3C
Close - General
Bell/buzzer/intercom
Nov 20, 2020 · Apt 3C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 1894
- Floors
- 7
- Residential units
- 56
- Building area
- 62,434 ft²
- Lot area
- 10,217 ft²
- Zoning
- C1-8A
- Community board
- 107
- Council district
- 6
- Block / lot
- 1128 / 61
- Assessed value
- $5,957,100
- Landmark / historic district
- Upper West Side / Central Park West Historic District
HPD registration #121849, last renewed Jul 16, 2026.
Questions about 331 Columbus Avenue
Who owns 331 Columbus Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 60 West 76th Street LLC.
Does 331 Columbus Avenue have violations?
Yes. NYC HPD has recorded 103 housing violations at this property.
Is 331 Columbus Avenue rent stabilized?
NYC Department of Finance tax bills listed 32 rent-stabilized units here in 2024 (about 57% of its 56 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 331 Columbus Avenue built?
City records list 1894 as the year it was built.
How many apartments are in 331 Columbus Avenue?
It has 56 residential units and 57 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.