roofy

815 10 Avenue

Manhattan, NY 10019BBL 1-01083-0029Map

Owner of record: Asn Foundry LLC

815 10 Avenue is an elevator apartment building built in 2000 in Manhattan, 10019. It has 164 residential units across 12 floors. The owner of record is Asn Foundry LLC. HPD has recorded 37 housing violations here, most recently on March 29, 2026. 4 of the 37 most recent violations are still open. City tax records listed 42 rent-stabilized apartments here in 2024.

HPD violations
37
DOB violations
73
ECB violations
14
HPD complaints
57

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Mar 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
42
About 26% of the building's 164 apartments
Down from 164 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 37

  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 29, 2026

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling approx. 4 sq. ft. in the bathroom located at apt 520, 5th story, 2nd apartment from east at south

    Nov 30, 2022 · Apt 520

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 520, 5th story, 2nd apartment from east at south

    Nov 30, 2022 · Apt 520

    Open — Defect letter issued
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 416, 4th story, 3rd apartment from south at west

    Nov 30, 2022 · Apt 416

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 416, 4th story, 3rd apartment from south at west

    Nov 30, 2022 · Apt 416

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor on walking area in the 2nd room from north located at apt 416, 4th story, 3rd apartment from south at west

    Nov 30, 2022 · Apt 416

    Closed — Violation closed
  • B

    Repair the leaky and/or defective water supply pipe at wash basin in the bathroom located at apt 416, 4th story, 3rd apartment from south at west

    Nov 30, 2022 · Apt 416

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling approx. 4 sq. ft. in the bathroom located at apt 520, 5th story, 2nd apartment from east at south original violation 15588182 issued 30-nov-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Nov 30, 2022 · Apt 520

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 416, 4th story, 3rd apartment from east at south

    Sep 29, 2022 · Apt 416

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 416, 4th story, 3rd apartment from east at south

    Sep 29, 2022 · Apt 416

    Closed — Violation closed
Show 27 more ↓
  • A

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 416, 4th story, 3rd apartment from east at south

    Sep 29, 2022 · Apt 416

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 416, 4th story, 3rd apartment from east at south

    Sep 29, 2022 · Apt 416

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 416, 4th story, 3rd apartment from east at south

    Sep 29, 2022 · Apt 416

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 626, 6th story, 2nd apartment from west at north

    Jun 10, 2022 · Apt 626

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at north wall in the bathroom located at apt 626, 6th story, 2nd apartment from west at north

    Jun 10, 2022 · Apt 626

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 626, 6th story, 2nd apartment from west at north

    Jun 10, 2022 · Apt 626

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen located at apt 626, 6th story, 2nd apartment from west at north

    Jun 10, 2022 · Apt 626

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    May 28, 2022

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective ...wood floor.. in the 1st room from north at east located at apt 324, 3rd story, 1st apartment from north at east

    Mar 17, 2022 · Apt 324

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective paving stone flooring in the terrace located at apt 324, 3rd story, 1st apartment from north at east

    Mar 17, 2022 · Apt 324

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... ...room n/e/1, mold at floor ..16sq ft in the 1st room from north at east located at apt 324, 3rd story, 1st apartment from north at east

    Mar 17, 2022 · Apt 324

    Open — Defect letter issued
  • C

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 324, 3rd story, 1st apartment from south at west

    Mar 8, 2022 · Apt 324

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 324, 3rd story, 1st apartment from south at west

    Mar 8, 2022 · Apt 324

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 16, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 16, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 4, 2019

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling (approx. 15 square feet) in the 1st bathroom from east located at apt 520, 5th story, 2nd apartment from east at south

    Mar 29, 2018 · Apt 520

    Open — Defect letter issued
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Aug 29, 2017

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Aug 29, 2017

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 29, 2017

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Aug 29, 2017

    Closed — Violation closed
  • B

    Replace with new the broken or defective rubber gasket at bottom door of refrigerator in the kitchen located at apt 520, 5th story, 2nd apartment from east at south , section at southeast

    Sep 28, 2016 · Apt 520

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 2, 2016

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missng at public hall, 1st story

    Jul 2, 2016

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jul 2, 2016

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Jul 2, 2016

    Closed — Violation closed
  • B

    Properly repair the broken or defective caulking around bathtub in the bathroom from east located at apt 520, 5th story, 2nd apartment from east at south

    Sep 16, 2013 · Apt 520

    Closed — Violation closed

DOB building violations · 73

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 3, 2024

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2024

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 19, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 19, 2021

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
Show 40 more ↓
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)

    Jun 1, 2016

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2014

    May 14, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 10, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 10, 2014

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 14, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 14, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 1, 2012

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2010 inspection/test

    Dec 13, 2011

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 6, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 6, 2011

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 28, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 2, 2010

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Vcat1-elevator annual inspection / test elevatorrequired

    Oct 8, 2010

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 22, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 22, 2009

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 27, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 27, 2007

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Sep 10, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p41632

    Oct 16, 2001

    Dob violation - resolved
  • Elevator elevatorrequired

    1p41633

    Oct 16, 2001

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Aug 13, 2001

    Vw-violation work without permit - active

ECB violations · 14

  • Class - 2

    Failure to file annual cert that cooling tower 1000003732 has been inspected,tested, & disinfected, & that a maintenance plan has been developed & implemented, by november 1,2016.rem:file annual cert.

    Jun 20, 2017 · Penalty $1,000

    Active
  • Class - 1

    Failure to provide unobstructed exit passageway.1st floor store having obstructed fire exit corridor by wheeled carts, and exit door of placed trash cans, cellar, subcellar by stored new,used ac units.card boxe

    Nov 16, 2016 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order to correct condition cited in nov 34852411x for illegal work at lower roof. remedy: comply w/code.

    Jan 20, 2011 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to comply w/an order of the commissioner.respondent failed to correct consitions in#34852411x lower roof has steel dunnage w/electrical & plumbing work.no permit.rem:comply w/code

    Nov 3, 2010 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner noted: the following conditions air conditioner compressor units on lower roof; along w/ refridgeration unit do not have equipment use permits on file remedy: f

    Aug 25, 2010

    Resolve
  • Class - 1

    Work w/o a permit noted: the following condition: the lower roof has steel dunnage along w/ electrical & plumbing work that are connected to air compressor units & refridgeration units there's no permits filed

    Aug 25, 2010 · Penalty $1,600

    Resolve
  • Class - 3

    Fence exceeds permitted height. noted: at rear terrace grd flr level behind "d'agostino's & dunkin donuts" perimeter, acoustical barrier fence, approx 28' linear ft along nw side of property is approx 10' high

    Apr 30, 2010 · Penalty $100

    Resolve
  • Hazardous

    Failure to maintain adjoining structure during excavation operations.noted: the lintel and stone sills are crached and the lintel and stone sills are crached and opem approx 1/2" apts ceilings are open approx

    Jun 2, 2000

    Resolve
  • Non-hazardous

    Warning signs and lights where a material file or other obstruction or an excavation opening or other hazard is located in or adjacent to away open for use by persons other than work men such hazardous shall be

    Jun 2, 2000 · Penalty $500

    Resolve
  • Hazardous

    No guard rail upon inspection at the above address excavation was approx 15 feet deep and there is no guard rail around the permiter. remedy: provide guard rail as per code.

    May 2, 2000 · Penalty $500

    Resolve
Show 4 more ↓
  • Hazardous

    Failure to safeguard public and property by construction operation: permit # nb 102434037 - bldg under excavation and piling . noted: aprox 1/4" wide step cracks observed in between windows including lintels fr

    Feb 16, 2000 · Penalty $1,500

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by bldg dept records.noted occupancy at above premises has been changed from a vacant lot to a public parking lot without first obtaining a new c of o from this dept.remedy:

    Nov 15, 1996 · Penalty $800

    Resolve
  • Non-hazardous

    Work does not conform to approved plans non conforming work noted installation of new sheetrock ceiling apprli 100461377 remedy conform to approved plans or restore to prior legal condition

    May 19, 1993 · Penalty $125

    Resolve
  • Non-hazardous

    Work does not conform to approved plans non conforming work noted installation of new sheetrok ceiling applic 100461625 remedy conform to approved plans or restore to prior legal condtion

    May 19, 1993 · Penalty $125

    Resolve

Complaints

  • Plumbing

    Water supply

    Mar 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2026 · Apt 319

    Close
  • Heat/hot water

    Entire building

    Oct 13, 2025 · Apt 11

    Close
  • Door/window

    Window frame

    Jun 3, 2025 · Apt 1026

    Close
  • Safety

    Carbon monoxide detector

    Jun 3, 2025 · Apt 1026

    Close
  • Heat/hot water

    Entire building

    Mar 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Aug 31, 2023 · Apt 520

    Close
  • General

    Ventilation system

    Aug 31, 2023 · Apt 520

    Close
  • Plumbing

    Toilet

    Nov 22, 2022 · Apt 520

    Close
  • Unsanitary condition

    Mold

    Nov 22, 2022 · Apt 520

    Close
Show 40 more ↓
  • Paint/plaster

    Cabinet

    Nov 22, 2022 · Apt 520

    Close
  • Appliance

    Electric/gas range

    Nov 22, 2022 · Apt 520

    Close
  • General

    Cabinet

    Nov 22, 2022 · Apt 520

    Close
  • Electric

    Wiring

    Nov 22, 2022 · Apt 520

    Close
  • Unsanitary condition

    Pests

    Nov 22, 2022 · Apt 520

    Close
  • Plumbing

    Basin/sink

    Nov 18, 2022 · Apt 416

    Close
  • Unsanitary condition

    Pests

    Sep 29, 2022 · Apt 710

    Close
  • General

    Ventilation system

    Sep 21, 2022 · Apt 416

    Close
  • Flooring/stairs

    Floor

    Sep 19, 2022 · Apt 416

    Close
  • Plumbing

    Basin/sink

    Sep 19, 2022 · Apt 416

    Close
  • Water leak

    Slow leak

    Sep 19, 2022 · Apt 416

    Close
  • Water leak

    Damp spot

    Aug 30, 2022 · Apt 411

    Close
  • Unsanitary condition

    Pests

    Aug 30, 2022 · Apt 411

    Close
  • Electric

    Power outage

    Aug 24, 2022 · Apt 814

    Close
  • Paint/plaster

    Wall

    May 23, 2022 · Apt 626

    Close
  • General

    Ventilation system

    May 23, 2022 · Apt 626

    Close
  • Flooring/stairs

    Floor

    May 23, 2022 · Apt 626

    Close
  • Paint/plaster

    Ceiling

    May 23, 2022 · Apt 626

    Close
  • Paint/plaster

    Wall

    May 23, 2022 · Apt 626

    Close
  • Unsanitary condition

    Mold

    May 23, 2022 · Apt 626

    Close
  • General

    Cabinet

    May 23, 2022 · Apt 626

    Close
  • Heat/hot water

    Apartment only

    Apr 10, 2022 · Apt 816

    Close
  • Heat/hot water

    Apartment only

    Mar 7, 2022 · Apt 324

    Close
  • Unsanitary condition

    Mold

    Mar 7, 2022 · Apt 324

    Close
  • Flooring/stairs

    Floor

    Mar 7, 2022 · Apt 324

    Close
  • Paint/plaster

    Ceiling

    Mar 3, 2022 · Apt 626

    Close
  • General

    Ventilation system

    Mar 3, 2022 · Apt 626

    Close
  • General

    Cabinet

    Mar 3, 2022 · Apt 626

    Close
  • Flooring/stairs

    Floor

    Mar 3, 2022 · Apt 626

    Close
  • Paint/plaster

    Ceiling

    Mar 3, 2022 · Apt 626

    Close
  • Unsanitary condition

    Mold

    Mar 3, 2022 · Apt 626

    Close
  • Unsanitary condition

    Pests

    Jan 14, 2021 · Apt 518

    Close
  • Unsanitary condition

    Mold

    Mar 13, 2018 · Apt 520

    Close
  • Heat/hot water

    Entire building

    Sep 14, 2017 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Sep 6, 2017 · Apt 1211

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 25, 2017 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Aug 25, 2017 · Apt BLDG

    Close
  • Safety

    Carbon monoxide detector

    Aug 25, 2017 · Apt BLDG

    Close
  • Appliance

    Refrigerator

    Sep 22, 2016 · Apt 520

    Close
  • Appliance

    Electric/gas range

    Sep 22, 2016 · Apt 520

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2000
Floors
12
Residential units
164
Building area
195,973 ft²
Lot area
20,063 ft²
Zoning
C2-7
Community board
104
Council district
6
Block / lot
1083 / 29
Assessed value
$22,439,250
Landmark / historic district
No

HPD registration #141475, last renewed Sep 29, 2025.

Questions about 815 10 Avenue

Who owns 815 10 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Asn Foundry LLC.

Does 815 10 Avenue have violations?

Yes. NYC HPD has recorded 37 housing violations at this property.

Is 815 10 Avenue rent stabilized?

NYC Department of Finance tax bills listed 42 rent-stabilized units here in 2024 (about 26% of its 164 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 815 10 Avenue built?

City records list 2000 as the year it was built.

How many apartments are in 815 10 Avenue?

It has 164 residential units and 167 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.