408 West 57 Street
Manhattan, NY 10019BBL 1-01066-0037Map
Owner of record: 408 West 57th Owners Corp
408 West 57 Street is an elevator apartment building built in 1957 in Manhattan, 10019. It has 147 residential units across 10 floors. The owner of record is 408 West 57th Owners Corp. HPD has recorded 83 housing violations here, most recently on April 23, 2026. 32 of the 50 most recent violations are still open. City tax records listed 13 rent-stabilized apartments here in 2024.
- HPD violations
- 83
- DOB violations
- 47
- ECB violations
- 38
- HPD complaints
- 274
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 83
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from north located at apt 6o, 6th story, 3rd apartment from east at south
Apr 23, 2026 · Apt 6O
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 2nd room from north located at apt 6o, 6th story, 3rd apartment from east at south
Apr 23, 2026 · Apt 6O
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall in the private hallway located at apt 6o, 6th story, 3rd apartment from east at south
Apr 23, 2026 · Apt 6O
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at 1sy closet from east in the private hallway located at apt 6o, 6th story, 3rd apartment from east at south
Apr 23, 2026 · Apt 6O
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west and north walls in the bathroom located at apt 6o, 6th story, 3rd apartment from east at south
Apr 23, 2026 · Apt 6O
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation window frame at south wall in the private hallway located at apt 6o, 6th story, 3rd apartment from east at south
Apr 23, 2026 · Apt 6O
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6o, 6th story, 3rd apartment from east at south
Apr 23, 2026 · Apt 6O
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation window frame at south wall in the 2nd room from north located at apt 6o, 6th story, 3rd apartment from east at south
Apr 23, 2026 · Apt 6O
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash at 2nd window from east at south wall in the 2nd room from north located at apt 6o, 6th story, 3rd apartment from east at south
Apr 23, 2026 · Apt 6O
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6o, 6th story, 3rd apartment from east at south
Apr 23, 2026 · Apt 6O
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department south wall in the kitchen located at apt 6o, 6th story, 3rd apartment from east at south
Apr 23, 2026 · Apt 6O
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door at compactor closet, 8th story
Jan 8, 2025
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures , in the kitchen located at apt 10l , 10th story, 7th apartment from west at north
Dec 2, 2024 · Apt 10L
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9b, 9th story, 6th apartment from east at south
Jan 10, 2022 · Apt 9B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9b, 9th story, 2nd apartment from east at south , section ''west''
Jan 2, 2022 · Apt 9B
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at or near mailboxes at public hall, 1st story
Mar 4, 2020
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2017
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing located at apt 2e, 2nd story, 1st apartment from west at north
Oct 18, 2016 · Apt 2E
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding maximum of 130* at hot water fixtures located at apt 2e, 2nd story, 1st apartment from west at north
Oct 18, 2016 · Apt 2E
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ..........ceiling and east wall in the 1st room from north located at apt 6o, 6th story, 3rd apartment from east at south
Jun 2, 2015 · Apt 6O
Open — Nov sent out - BHazardous
Abate the nuisance consisting of bedbugs located at apt 6o, 6th story, 3rd apartment from east at south
Nov 24, 2014 · Apt 6O
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls and ceiling in the bathroom located at apt 6o, 6th story, 3rd apartment from east at south
Nov 24, 2014 · Apt 6O
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the walls and ceiling in the bathroom located at apt 6o, 6th story, 3rd apartment from east at south
Nov 24, 2014 · Apt 6O
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective northwest section wood floor of approximately 2 square feet in the 3rd room from north at east located at apt 6o, 6th story, 3rd apartment from east at south
Nov 24, 2014 · Apt 6O
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective countertop at sink in the kitchen located at apt 6o, 6th story, 3rd apartment from east at south
Nov 24, 2014 · Apt 6O
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice located at apt 6o, 6th story, 3rd apartment from east at south
Nov 24, 2014 · Apt 6O
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative located at apt 6o, 6th story, 3rd apartment from east at south
Nov 24, 2014 · Apt 6O
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at the walls in the 1st room from north at west located at apt 6o, 6th story, 3rd apartment from east at south
Nov 24, 2014 · Apt 6O
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls in the 1st room from north at west located at apt 6o, 6th story, 3rd apartment from east at south
Nov 24, 2014 · Apt 6O
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling and walls ( approx 25 sq feet ) in the 1st room from east at south located at apt 6o, 6th story, 1st apartment from east at south
Mar 13, 2014 · Apt 6O
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... around the window and the radiator ( approx 10 sq feet) in the 1st room from east located at apt 6o, 6th story, 1st apartment from east at south
Mar 13, 2014 · Apt 6O
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 6o, 6th story, 3rd apartment from east at south
Jan 18, 2014 · Apt 6O
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective wood floor in the 1st room from east located at apt 6o, 6th story, 3rd apartment from east at south
Jan 18, 2014 · Apt 6O
Open — First no access to re- inspect violation - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6o, 6th story, 3rd apartment from east at south
Jan 18, 2014 · Apt 6O
Open — First no access to re- inspect violation - BHazardous
Replace with new the broken or defective wood door saddle in the bathroom located at apt 6o, 6th story, 3rd apartment from east at south
Jan 18, 2014 · Apt 6O
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... approx 1 square feet at south wall around radiator area in the 1st room from east located at apt 6o, 6th story, 3rd apartment from east at south
Jan 18, 2014 · Apt 6O
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 2c, 2nd story, 3rd apartment from east at south
Feb 28, 2013 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceilings and all walls in the entire apartment located at apt 2c, 2nd story, 3rd apartment from east at south
Feb 28, 2013 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective porcelain covering (cut hazzard) in the bathroom located at apt 2c, 2nd story
Feb 28, 2013 · Apt 2C
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at north wall in the 2nd room from north located at apt 2c, 2nd story, 3rd apartment from east at south
Feb 28, 2013 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 2c, 2nd story, 3rd apartment from east at south
Feb 28, 2013 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall and metal window frame in the 2nd room from east at south located at apt 6o, 6th story, 3rd apartment from east at south
Oct 4, 2012 · Apt 6O
Open — Nov sent out - BHazardous
Properly repair the broken or defective mechanical air vent in the bathroom located at apt 6o, 6th story, 3rd apartment from east at south
Sep 22, 2012 · Apt 6O
Open — Nov sent out - BHazardous
Properly repair the broken or defective mechanical air vent in the kitchen located at apt 6o, 6th story, 3rd apartment from east at south
Sep 22, 2012 · Apt 6O
Open — Nov sent out
DOB building violations · 47
- Construction other optional
Request engineers report.observed at cellar and sub cellar car garage at various locations spawling concrete sections of columns and beams have missing concrete casing around it. stop cracks observed on cmu in brick walls. several large sections of ceiling have shoring in sub- caller and vehicles place on top.
Aug 19, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 27, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Dec 21, 2016
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Dec 21, 2016
Dob violation - dismissed - Construction other optional
Boro-comm
May 16, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 10, 2016
Dob violation - dismissed
Show 37 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 10, 2016
Dob violation - dismissed - Construction other optional
The balcony @ apartment 10d is relecting +/-4" @ the west corner cracking of the south west corner facade is present beneath the balcony the condition is unsafe to the public and tenants. remedy: install full height shoring for south west balconies. the shoring is to be installed under permit and in place by 11/4/15
Oct 27, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2013
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 6, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 6, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 11, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 11, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 23, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 23, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 26, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 26, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 19, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 19, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2003
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 19, 2002
Dob violation - dismissed - Elevator elevatorrequired
1p2894
Dec 27, 2001
Dob violation - resolved - Elevator elevatorrequired
1p2893
Dec 27, 2001
Dob violation - resolved - Elevator elevatorrequired
1p2893
Jan 5, 2000
Dob violation - resolved - Facade facade optional
Ll10/80-local law 10/80 - facade facade optional
Jan 27, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Facade facade optional
Ll10/80-local law 10/80 - facade facade optional
Jan 18, 1991
Dob violation - dismissed - Elevator elevatorrequired
(01)relays where necessary.(34)gibs
Dec 9, 1988
Dob violation - resolved - Elevator elevatorrequired
(01)repair relay
Dec 9, 1988
Dob violation - resolved
ECB violations · 38
- Class - 1
Failure to secure public safety and/or make the bldg's structure and appurtenances conform to the provisions of the admin code after unsafe notification filed by qpsi. as noted at time of inspection on an activ
Nov 7, 2025 · Penalty $10,000
Resolve - Class - 1
Observed at cellar and sub cellar car garage at various locations spawling concrete sections of columns and beams have missing concrete casing around it. stop cracks observed on cmu in brick walls. several larg
Aug 19, 2025 · Penalty $2,500
Active - Class - 1
Work without a permit.at time of inspection observed electrical work in apt10d without permit at above premises.box ran throughout the apt. broken box is exposed and open junction box installed in the ceiling.
Dec 19, 2022 · Penalty $1,250
Resolve - Class - 1
An unlawful act.failure to comply with an order of the commissioner.failure to correct and certify summons#35424027r issued on 8/27/2019 forled lights installed in the parking garage.rem:comply with ec code.
Jul 7, 2021 · Penalty $2,500
Resolve - Class - 1
Unlawful acts failur eto comply with commissioners order records indicate no application was made to correct or certify ecb #35424007r comply with commissioners orders
Jun 5, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to comply with an order of the commissioner.failure to correctand certify summons#35360026p.remedy:comply with ec code.
May 4, 2021 · Penalty $6,250
Resolve - Class - 2
At time of inspection observed ongoing construction activities contrary to mayor's emergency executive order 120 and subsequent orders incorporating requirements of governor's executive order 202.34 and subsequ
Aug 28, 2020 · Penalty $5,000
Resolve - Class - 1
Failure to obey commissioner, comply with commissioner's order; comply
Mar 19, 2020
Resolve - Class - 1
Failure to comply, comply with commissioner's order; comply with code
Jan 17, 2020
Resolve - Class - 1
Unlawful acts.failure to comply with an order of the commissioner.in,august 27,2019.a electrical violation was issued to the respondent.the respondent failed to comply with(nyc)electrical code#127-3018(b)(eco)#
Nov 27, 2019 · Penalty $2,500
Resolve
Show 28 more ↓
- Class - 1
Unlawful acts.failure to comply with an order of the commissioner.in august 27,2019.a electrical violation was issued to the respondent.the respondent failed to comply with (nyc)electrical code#27-3018(b)(ecb)
Oct 16, 2019 · Penalty $2,500
Resolve - Class - 1
Electrical work without a permit. for the installation of several led light fixtures throughout the parking garage. remedy: obtain permit
Aug 27, 2019 · Penalty $1,600
Resolve - Class - 2
Failure to maintain-roof bulkhead eroded mirtar glass block cracked at bulkhead'b'line bathroom exhaust hood not secured-south parapet(@ garage)step cracks(south-east corner)south elev exp#3 balcony cover not
Apr 28, 2017 · Penalty $500
Resolve - Class - 2
Failure to maintain exterior building north elev. exp1 defective mor tar joints at parapet. balcony doors rusting.missing a/c grill on 10 flr, unsecured fan 10 fl window. south elev. exp3 (lobby level roof)
Sep 27, 2016 · Penalty $500
Resolve - Class - 2
Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4. agg1: prior nov 36027710z under 28-302.4. remedy: submit requi
Aug 11, 2016 · Penalty $1,000
Resolve - Class - 2
Failure to comply with the commissioner's order contained in nov#35154375x issued on11/17/15 &to file a certificate of correction pursuant to 28-201.1,28-204.4 &1rcny 102-01.for work w/o permit @apt 5e.rem:comp
Jul 6, 2016 · Penalty $4,000
Resolve - Class - 2
Failure to maintain exterior bldg north elevation exp#1-parapet missing &/or defective joints above fl 10 below sill 6fl unsecured fan 10fl.west balconies fb 1 & 10 spalling ceilings. south elev exp#3 parapet
Jun 6, 2016
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35154375x issued on 11/17/15 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. remedy: comply w/comm's order &/or file a c of c.
May 22, 2016 · Penalty $4,000
Resolve - Class - 1
Work w/o a permit. noted: at 5th fl apt 5e removing & replacing all plumbing w/new plumbing installing new water & waste lines,gas line,shower body. work also noted removing/replacing electric w/new electric
Nov 17, 2015 · Penalty $1,600
Resolve - Class - 1
Work w/o a permit. noted: at 4th fl apt 4c removing/replacing all plumbing w/new plumbing installing new water & waste lines,gas line,showerbody work also noted: removing/replacing electric w/new electric lines
Nov 17, 2015 · Penalty $1,600
Resolve - Class - 3
Failure to maintain building in a code compliant manner.observed excessive deflection in the 10th floor balcony which is located directly above the 9th floor balcony.partial vacate order issued for the balcony
Oct 27, 2015 · Penalty $100
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
May 21, 2015 · Penalty $800
Resolve - Class - 2
Failure to maintain bldg in code complaint manner.lack of a system of automatic sprinklers where required per bc 903.lp; 27-954 photos takenat time of inspection,11:05am, i observed commercial dryers installed
Oct 14, 2014
Resolve - Class - 2
Failuer to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Apr 21, 2014 · Penalty $800
Resolve - Non-hazardous
50f11-50y11. 50-repair lost motion on main machine
Mar 13, 2002
Resolve - Non-hazardous
35o02 37a07 37a09 28h11 74o02 (35o02)-clean motor room.(37a07)-provide proper mounting of relay in front of controller.(37a09)-remove jumper back of controller.(38h11)-repaor top and bottom guild shoes.(74o02)
Jan 29, 2001
Resolve - Non-hazardous
37a07 37a09 74o02 37a07-provide proper mounting of relay in front of controller.37a09-remove tie raps from relay front of controller and repair.74o02-clean top of car.
Jan 29, 2001
Resolve - Hazardous
Failure to maintain exterior bldg wall,noted:@w.ele.n.corner poured concrete terraces cracked,spalled&spalling w/rusting rebar(reinforcement rods)exposed,rem:provide protection&all required permits-make area
Jun 12, 2000 · Penalty $800
Resolve - Non-hazardous
39h08,74o02.57o02, 39)regroove traction sheave 74)clean oil top of car57)clean oil from pit.
Mar 7, 2000
Resolve - Non-hazardous
50y 15b clean all ground main machine and seal back 15 adjust lobby door to be self closing
Mar 4, 1999
Resolve - Non-hazardous
15b 46b 50y 15 adjust hositway to be self closing 46 use proper cutter pins for shackles on cr and counterweight 50 seal all leak at main machine clean car top
Mar 3, 1999
Resolve - Non-hazardous
73o46h47h39h30b09h50y61b 46h-hoist cables excessive wear 30b-replace all missing covers 61b-tighten tail ropes.
May 28, 1998
Resolve - Non-hazardous
9h16h28h46h47h39h50y73o
May 28, 1998
Resolve - Non-hazardous
Failure to maintain buidling defect is: window silk and lintels are spalling with loose and cracked stone at various locations at 1st thru 3rd floor. also stone work over buildingentrance door is spalling. buil
Jun 17, 1996
Resolve - Non-hazardous
75b 5 yr test perform fnad file test 74t tag machine disconnect and controller 57 clean pit.
Apr 22, 1996 · Penalty $100
Resolve - Non-hazardous
75b 5 yr test perform and file test 74t tag machine, disconnect and controller 57o clean pit.
Apr 22, 1996 · Penalty $100
Resolve - Hazardous
Failure to maitain exterior building wall.the subject building has been determined to be "unsafe"as described in th professional engineer/registered architects technical report:periodic inspection of exterior w
Jan 22, 1991
Resolve - Non-hazardous
Altered building occupied without a valid c of o as proposed under alt 71/87 and alt 1597/68. remedy: obtain a valid c of o or restore to prior existing legal use.
Jul 6, 1988 · Penalty $250
Resolve
Complaints
- Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 26, 2026 · Apt BLDG
Close - Water leak
Damp spot
Apr 20, 2026 · Apt 6O
Close - Flooring/stairs
Floor
Apr 20, 2026 · Apt 6O
Close - Unsanitary condition
Mold
Apr 20, 2026 · Apt 6O
Close - Door/window
Window frame
Apr 20, 2026 · Apt 6O
Close - General
Cabinet
Apr 20, 2026 · Apt 6O
Close
Show 40 more ↓
- Paint/plaster
Wall
Apr 20, 2026 · Apt 6O
Close - Electric
Lighting
Apr 20, 2026 · Apt 6O
Close - Paint/plaster
Ceiling
Apr 20, 2026 · Apt 6O
Close - Plumbing
Bathtub/shower
Apr 20, 2026 · Apt 6O
Close - Heat/hot water
Entire building
Feb 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 7, 2025 · Apt 3K
Close - Heat/hot water
Entire building
Oct 13, 2025 · Apt 10 I
Close - Heat/hot water
Entire building
Mar 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 23, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 20, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 2, 2023 · Apt BLDG
Close - General
Janitor/super
Mar 23, 2023 · Apt 3E
Close - Heat/hot water
Entire building
Mar 23, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Feb 14, 2023 · Apt APT5H
Close - Heat/hot water
Apartment only
Dec 29, 2022 · Apt 9B
Close - Heat/hot water
Apartment only
Dec 29, 2022 · Apt 9B
Close - Heat/hot water
Entire building
Nov 8, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 1, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 18, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2022 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jun 17, 2026 | $423,000 | Coops - elevator apartments | — |
| Jan 16, 2026 | $665,000 | Coops - elevator apartments | — |
| Dec 15, 2025 | $440,000 | Coops - elevator apartments | — |
| Oct 28, 2025 | $525,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1957
- Floors
- 10
- Residential units
- 147
- Building area
- 104,966 ft²
- Lot area
- 17,500 ft²
- Zoning
- R8
- Community board
- 104
- Council district
- 6
- Block / lot
- 1066 / 37
- Assessed value
- $12,427,200
- Landmark / historic district
- No
HPD registration #128370, last renewed Aug 7, 2025.
Questions about 408 West 57 Street
Who owns 408 West 57 Street?
The owner of record in NYC Department of City Planning PLUTO data is 408 West 57th Owners Corp.
Does 408 West 57 Street have violations?
Yes. NYC HPD has recorded 83 housing violations at this property.
Is 408 West 57 Street rent stabilized?
NYC Department of Finance tax bills listed 13 rent-stabilized units here in 2024 (about 9% of its 147 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 408 West 57 Street built?
City records list 1957 as the year it was built.
How many apartments are in 408 West 57 Street?
It has 147 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.