734 10 Avenue
Manhattan, NY 10019BBL 1-01060-0001Map
Owner of record: 459 West 50th Street Owner LLC
734 10 Avenue is a mixed residential and retail building built in 1910 in Manhattan, 10019. It has 6 residential units across 4 floors. The owner of record is 459 West 50th Street Owner LLC. HPD has recorded 34 housing violations here, most recently on January 19, 2025. 19 of the 34 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2019.
- HPD violations
- 34
- DOB violations
- 26
- ECB violations
- 8
- HPD complaints
- 51
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 34
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of wood debris and electrical wires at 2nd story balcony at building front fire escape
Jan 19, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and south wall. at public hall stairs, 2nd story
Jan 19, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and south wall. at public hall stairs, 2nd story
Jan 19, 2025
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from west at north
Jan 19, 2025 · Apt 2E
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from west at north
Jan 19, 2025 · Apt 2E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective inoperative bell/ buzzer/ intercom system ftom building front entrance to south wall pannel in the foyer located at apt 2e, 2nd story, 1st apartment from west at north
Jan 19, 2025 · Apt 2E
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Jan 8, 2025
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from east at south
Jan 8, 2025 · Apt 2E
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from east at south
Jan 8, 2025 · Apt 2E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall and ceiling at public hall, 2nd story
Jan 8, 2025
Open — Nov sent out
Show 24 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall and ceiling at public hall, 2nd story
Jan 8, 2025
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye device at building entrance door
Jan 8, 2025
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of duct tape covering strike plate at lockset at building entrance door
Jan 8, 2025
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jan 8, 2025
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2e, 2nd story, 1st apartment from east at south
Jan 8, 2025 · Apt 2E
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2e, 2nd story, 1st apartment from east at south
Jan 8, 2025 · Apt 2E
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jan 8, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2e, 2nd story, 1st apartment from south at west
Oct 3, 2024 · Apt 2E
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at the ceiling in the kitchen located at apt 2e, 2nd story, 1st apartment from south at west
Oct 3, 2024 · Apt 2E
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from south at west
Oct 3, 2024 · Apt 2E
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from south at west
Oct 3, 2024 · Apt 2E
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2e, 2nd story, 1st apartment from south at west
Oct 3, 2024 · Apt 2E
Open — Nov sent out - CImmediately hazardous
Code: arrange and make self-closing the doors , in the entrance located at apt 2w, 2nd story, 1st apartment from south at west
Oct 8, 2021 · Apt 2W
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2w, 2nd story, 1st apartment from south at west
Oct 8, 2021 · Apt 2W
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2w, 2nd story, 1st apartment from south at west
Sep 29, 2021 · Apt 2W
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors , in the entrance located at apt 2w, 2nd story, 1st apartment from south at west
Sep 29, 2021 · Apt 2W
Open — Invalid certification - BHazardous
M/d law abate the nuisance consisting of lock at door to window of fire escape in the 1st room from east located at apt 2w, 2nd story, 1st apartment from south at west
Sep 29, 2021 · Apt 2W
Open — Invalid certification - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of fire escape ladder obstructed by household garbage at building front at fire escape
Mar 13, 2019
Closed — Violation closed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at building front at fire escape
Mar 13, 2019
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west
Mar 23, 2015 · Apt 2W
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2w, 2nd story, 1st apartment from south at west
Mar 23, 2015 · Apt 2W
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entrance located at apt 2w, 2nd story
Mar 23, 2015 · Apt 2W
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Mar 23, 2015
Closed — Violation dismissed
DOB building violations · 26
- High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active
Show 16 more ↓
- High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - active - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2016 annual high pressure boiler inspection
Jun 22, 2018
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2015 annual high pressure boiler inspection
Jun 23, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 29, 2016
Dob violation - dismissed - Emergency none
Egncy-emergency none
Apr 5, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 30, 2015
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2013 annual high pressure boiler inspection
Mar 3, 2015
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2012 annual high pressure boiler inspection
May 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 4, 2012
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 3, 1997
Dob violation - active
ECB violations · 8
- Class - 2
At 2nd floor, corner window facing w 50th st. top right side of window large vertical crack in masonry,also noted step crack also appears and runs the height of window., maintain exterior building wall
Aug 21, 2024 · Penalty $1,250
Active - Class - 2
Failure to comply w/the comm's order contained in nov #35154168n issued on 10/4/15 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
May 22, 2016 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. docorative metal cornice,approx 15 lineal feet loose & unstalbe;also section approx 5 lineal feet dislodged & fell off. loose section in danger of falling off.
Apr 3, 2016 · Penalty $1,000
Resolve - Class - 1
Work w/o a permit. wooden deck constructed on roof,approx 15ft wide x 20feet long & 1ft height w/5ft height wooden fence around said deck. dept records shown no permit issued to construct said deck.
Apr 3, 2016
Resolve - Class - 1
Filed a certificate, form, application etc containing a material falsestatement. in pw-1 (plan/work application) #121982578, section #26, owner's certification regarding occupied housing owner marked "no" in
Oct 4, 2015 · Penalty $2,400
Resolve - Class - 2
Work without permit. work noted:erect illuminated awning sign at west 50th st for candy store work 100% complete. rem:stop all work obtain permit.
Mar 26, 2012
Resolve - Class - 1
Work without a permit. note:approximately 15-0 wide x 20-0 long and 1'-0 height wooden deck erected on roof with 4'0 height wooden fence around deck without first obtaining all approval or permit from departmen
Jan 3, 2012 · Penalty $1,600
Resolve - Non-hazardous
60a/50. fulton v.t. boiler, 15 hp, nb 785-97, gas 1997 6a safety valveleaking. replace defective safety valve. 50- no drain line on the gauge glass assembly replace missing drain line.
Feb 24, 2006 · Penalty $180
Resolve
Complaints
- Plumbing
Bathtub/shower
Feb 13, 2026 · Apt 4E
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 17, 2025 · Apt 4E
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 25, 2025 · Apt 2E
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 2E
Close - Unsanitary condition
Mold
Jan 18, 2025 · Apt 2E
Close - Paint/plaster
Ceiling
Jan 18, 2025 · Apt 2E
Close - General
Bell/buzzer/intercom
Jan 18, 2025 · Apt 2E
Close - General
Mailbox
Jan 18, 2025 · Apt 2E
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 6, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Jan 6, 2025 · Apt 2E
Close - General
Bell/buzzer/intercom
Jan 6, 2025 · Apt 2E
Close - General
Mailbox
Jan 6, 2025 · Apt 2E
Close - Heat/hot water
Apartment only
Oct 3, 2024 · Apt 2E
Close - Door/window
Door
Oct 3, 2024 · Apt 2E
Close - Electric
No lighting
Oct 3, 2024 · Apt 2E
Close - General
Bell/buzzer/intercom
Oct 3, 2024 · Apt 2E
Close - Heat/hot water
Apartment only
Oct 3, 2024 · Apt 2E
Close - Unsanitary condition
Pests
Sep 25, 2023 · Apt 2E
Close - General
Mailbox
Sep 25, 2023 · Apt 2E
Close - Unsanitary condition
Garbage/recycling storage
Sep 25, 2023 · Apt 2E
Close - Paint/plaster
Wall
Apr 3, 2023 · Apt 2E
Close - Unsanitary condition
Pests
Apr 3, 2023 · Apt 2E
Close - Electric
Lighting
Apr 3, 2023 · Apt 2E
Close - Heat/hot water
Entire building
Dec 19, 2021 · Apt QW
Close - Safety
Fire escape
Oct 7, 2021 · Apt 2W
Close - General
Cooking gas
Oct 7, 2021 · Apt 2W
Close - Door/window
Door
Oct 7, 2021 · Apt 2W
Close - Appliance
Electric/gas range
Sep 19, 2021 · Apt 2W
Close - Appliance
Electric/gas range
Sep 10, 2021 · Apt 2W
Close - Paint/plaster
Ceiling
Mar 7, 2019 · Apt 2W
Close - Electric
Power outage
Mar 7, 2019 · Apt 2W
Close - Unsanitary condition
Pests
Mar 7, 2019 · Apt 2W
Close - Plumbing
Radiator
Mar 7, 2019 · Apt 2W
Close - Heat/hot water
Apartment only
Mar 7, 2019 · Apt 2W
Close - Heat/hot water
Entire building
Feb 1, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 25, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 25, 2015 · Apt 2W
Close - Heat/hot water
Entire building
Mar 24, 2015 · Apt 2W
Close - Heat/hot water
Entire building
Mar 24, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 23, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 22, 2015 · Apt 2W
Close - Heating
Heat related
Feb 1, 2013 · Apt BLDG
Close - Heating
Heat related
Jan 29, 2013 · Apt BLDG
Close - General
Floor
May 30, 2012 · Apt 3E
Close - Plumbing
Sewer
May 30, 2012 · Apt 3E
Close - Plumbing
Water-leaks
May 30, 2012 · Apt 3E
Close - General
Locks
Jul 8, 2011 · Apt 3W
Close - General
Doors
Jul 8, 2011 · Apt 3W
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1910
- Floors
- 4
- Residential units
- 6
- Building area
- 5,749 ft²
- Lot area
- 1,734 ft²
- Zoning
- R8
- Community board
- 104
- Council district
- 3
- Block / lot
- 1060 / 1
- Assessed value
- $2,410,650
- Landmark / historic district
- No
HPD registration #112025, last renewed Oct 30, 2025.
Questions about 734 10 Avenue
Who owns 734 10 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 459 West 50th Street Owner LLC.
Does 734 10 Avenue have violations?
Yes. NYC HPD has recorded 34 housing violations at this property.
Is 734 10 Avenue rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2019 (about 17% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 734 10 Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 734 10 Avenue?
It has 6 residential units and 8 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.