222 East 40 Street
Manhattan, NY 10016BBL 1-00920-0013Map
Owner of record: Gemini Residential, LLC
222 East 40 Street is an elevator apartment building built in 2015 in Manhattan, 10016. It has 372 residential units across 36 floors. The owner of record is Gemini Residential, LLC. HPD has recorded 22 housing violations here, most recently on September 18, 2026. 5 of the 22 most recent violations are still open. City tax records listed 372 rent-stabilized apartments here in 2024.
- HPD violations
- 22
- DOB violations
- 15
- ECB violations
- 12
- HPD complaints
- 29
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 12c, 12th story, 2nd apartment from east at south
Sep 18, 2026 · Apt 12C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mechanical vent at south wall in the bathroom located at apt 12c, 12th story, 2nd apartment from east at south
Sep 18, 2026 · Apt 12C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 12c, 12th story, 2nd apartment from east at south
Sep 18, 2026 · Apt 12C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 12c, 12th story, 2nd apartment from east at south
Sep 18, 2026 · Apt 12C
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchen located at apt 12c, 12th story, 2nd apartment from east at south
Sep 18, 2026 · Apt 12C
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 10l, 10th story, 3rd apartment from north at east
Dec 28, 2021 · Apt 10L
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 10l, 10th story, 3rd apartment from north at east
Dec 28, 2021 · Apt 10L
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at sink wasteline in the kitchen located at apt 17l, 17th story, 3rd apartment from north at east
Dec 28, 2021 · Apt 17L
Closed — Violation dismissed - BHazardous
Replace the broken or defective washbasin in the bathroom from east located at apt 22d, 22nd story, 3rd apartment from east at south
Dec 28, 2021 · Apt 22D
Closed — Violation dismissed
Show 12 more ↓
- ANon-hazardous
Properly repair the broken or defective base cabinet in the kitchen located at apt 4d, 4th story, 3rd apartment from east at south
Dec 28, 2021 · Apt 4D
Closed — Violation dismissed - ANon-hazardous
Refit base cabinet doors in the kitchen located at apt 14l, 14th story, 3rd apartment from north at east
Dec 28, 2021 · Apt 14L
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at bathtub in the bathroom located at apt 11h, 11th story, 4th apartment from south at west
Sep 18, 2017 · Apt 11H
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures at bathtub in the bathroom located at apt 11h, 11th story, 4th apartment from south at west
Sep 18, 2017 · Apt 11H
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor incorrect frame at time of inspection. at public hall, 1st story
Sep 11, 2017
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 11, 2017
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Sep 11, 2017
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 11, 2017
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Sep 11, 2017
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 11, 2017
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at time of inspection at public hall, 1st story
Sep 11, 2017
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 11, 2017
Closed — Violation closed
DOB building violations · 15
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2020
Jun 20, 2021
Dob violation - dismissed
Show 5 more ↓
- Construction other optional
C-construction other optional
Jun 6, 2017
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2015
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2015
Vw*-violation - work w/o permit dismissed - Construction other optional
Due to vehicle into the building
Dec 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 4, 2006
Dob violation - resolved
ECB violations · 12
- Class - 1
5/x/10 class 1, car cease use car door restrictor is not working tampered with,
Jun 16, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to safeguard:note:at time of inspection of an incident of a worker step into a hole area that was left unocupied at roof around poolarea.upon arrival and inspection area where incident happened i observ
Jun 6, 2017 · Penalty $5,000
Resolve - Class - 1
Work does not conform to approved construction documents - site safetyplan. noted: sidewalk between 39th st and 40 st only 2'6"wide (exp2) forcing people to walk on the street with cars.site safety plan shows
Apr 9, 2016 · Penalty $1,000
Resolve - Class - 1
Sec. 3304.7 safe means of ingress & egress. at time of my inspection observed excavation in progress-approx 30 workers working in the hole. excavation is approx 15'deep. no safe means of egress in place. 1 ladd
May 21, 2015 · Penalty $1,600
Resolve - Class - 1
Sec. 3307.4.3 no flag person provided. observed active excavation sitedump trucks are going in & out at e 39 street entrance. no flag person posted/provided as required. remedy: comply w/code.
May 21, 2015 · Penalty $1,600
Resolve - Class - 2
Actual site condition does not conform to approved site safety plan. observed-active excavation site-approx 15'deep 2 trailer placed at corner of exp#1 & 4. which is at the edge of 15'deep excavation-not shown
May 21, 2015
Resolve - Class - 2
Bc3309.4 failure to protect and preserve adjoining structure affected by excavation operations.contractor had installed caisson before the installation of soe structure at exp#4 this caisson insallation create
Mar 18, 2015
Resolve - Class - 2
Bc3307.7 failure to provide an adequate construction fence-inadequacies noted: contractor failed to provide 12"x12"viewing panels blocked w/plexiglass panels are required for the proper prosecution of the work.
Mar 8, 2015
Resolve - Class - 2
Failure to post or properly post permit for work at premises. at time of inspection of 6 story bldg under demolition permit #121908800 has 8 foot high construction fence erected w/no permit posted (cor) demolit
Jul 23, 2014
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob for nov #34822044x issued on 11.27.09 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c/c.
Nov 30, 2013 · Penalty $800
Resolve
Show 2 more ↓
- Class - 2
Failure to maintain: note 1) @ ceiling 1st flr (opposite hertz office)section of q deck missing hanging w/spalling concrete above. 2) spalling concrete @standpipe fire stairs 5s,w/missing q deck sections(@ 54w)
Nov 30, 2013 · Penalty $500
Resolve - Class - 1
Fail to maintain bldg in code compliant manner.defects noted:step crack @ wall to elevator bank,roof level,east & stair wall enclosurs @ various locations.opening on roof flr leaving exposed structural steel to
Nov 27, 2009 · Penalty $1,000
Resolve
Complaints
- Paint/plaster
Ceiling
Sep 16, 2026 · Apt 12C
Close - Paint/plaster
Wall
Sep 16, 2026 · Apt 12C
Close - Appliance
Refrigerator
Sep 16, 2026 · Apt 12C
Close - Appliance
Electric/gas range
Sep 16, 2026 · Apt 12C
Close - Flooring/stairs
Floor
Sep 4, 2026 · Apt 4D
Close - Plumbing
Bathtub/shower
Sep 4, 2026 · Apt 4D
Close - Unsanitary condition
Mold
Sep 4, 2026 · Apt 4D
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 11M
Close - Heat/hot water
Entire building
Nov 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 30, 2024 · Apt BLDG
Close
Show 19 more ↓
- Flooring/stairs
Floor
Jan 11, 2024 · Apt 12C
Close - Appliance
Electric/gas range
Jan 11, 2024 · Apt 12C
Close - Plumbing
Basin/sink
Jan 11, 2024 · Apt 12C
Close - Appliance
Refrigerator
Jan 11, 2024 · Apt 12C
Close - Plumbing
Basin/sink
Jan 11, 2024 · Apt 12C
Close - Paint/plaster
Wall
Jan 11, 2024 · Apt 12C
Close - Paint/plaster
Wall
Jan 11, 2024 · Apt 12C
Close - Paint/plaster
Ceiling
Jan 11, 2024 · Apt 12C
Close - General
Ventilation system
Jan 11, 2024 · Apt 12C
Close - Plumbing
Basin/sink
Jan 11, 2024 · Apt 12C
Close - Flooring/stairs
Floor
Jan 11, 2024 · Apt 12C
Close - Heat/hot water
Entire building
Jun 7, 2023 · Apt BLDG
Close - Unsanitary condition
Sewage
Aug 9, 2022 · Apt 3G
Close - Unsanitary condition
Mold
Jul 30, 2020 · Apt 19J
Close - Appliance
Electric/gas range
Sep 17, 2019 · Apt 21ABUT
Close - Plumbing
Water supply
Aug 17, 2019 · Apt 18L
Close - Plumbing
Water supply
Aug 16, 2019 · Apt 12B
Close - Water leak
Heavy flow
Nov 28, 2018 · Apt PHM
Close - Plumbing
Water supply
Aug 25, 2017 · Apt 11H
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D8)
- Year built
- 2015
- Floors
- 36
- Residential units
- 372
- Building area
- 373,248 ft²
- Lot area
- 22,111 ft²
- Zoning
- C1-9
- Community board
- 106
- Council district
- 4
- Block / lot
- 920 / 13
- Assessed value
- $53,128,350
- Landmark / historic district
- No
HPD registration #144336, last renewed Jul 1, 2025.
Questions about 222 East 40 Street
Who owns 222 East 40 Street?
The owner of record in NYC Department of City Planning PLUTO data is Gemini Residential, LLC.
Does 222 East 40 Street have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 222 East 40 Street rent stabilized?
NYC Department of Finance tax bills listed 372 rent-stabilized units here in 2024 (about 100% of its 372 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 222 East 40 Street built?
City records list 2015 as the year it was built.
How many apartments are in 222 East 40 Street?
It has 372 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.