593 3 Avenue
Manhattan, NY 10016BBL 1-00919-0059Map
Owner of record: Frontier Restaurant INC.
593 3 Avenue is an elevator apartment building built in 2013 in Manhattan, 10016. It has 70 residential units across 19 floors. The owner of record is Frontier Restaurant INC.. HPD has recorded 14 housing violations here, most recently on September 10, 2026. 5 of the 14 most recent violations are still open. City tax records listed 91 rent-stabilized apartments here in 2024.
- HPD violations
- 14
- DOB violations
- 21
- ECB violations
- 31
- HPD complaints
- 81
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- BHazardous
Properly repair the source and abate the evidence of a water leak at. ceiling and east wall in the bathroom located at apt 7d, 7th story, 1st apartment from west at north
Sep 10, 2026 · Apt 7D
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroom located at apt 7d, 7th story, 1st apartment from west at north
Sep 10, 2026 · Apt 7D
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 7d, 7th story, 1st apartment from west at north
Sep 10, 2026 · Apt 7D
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective wood door at entrance in the bathroom located at apt 7d, 7th story, 1st apartment from west at north
Sep 10, 2026 · Apt 7D
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 12d, 12th story, 1st apartment from west at north
Jan 28, 2025 · Apt 12D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 12d, 12th story, 1st apartment from west at north
Jan 28, 2025 · Apt 12D
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east
Dec 23, 2024 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 18e, 18th story, 3rd apartment from west at north
Sep 10, 2024 · Apt 18E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood baseboard at north wall in the kitchen located at apt 18e, 18th story, 3rd apartment from west at north
Sep 10, 2024 · Apt 18E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood baseboard at south and east walls in closet in the private hallway located at apt 18e, 18th story, 3rd apartment from west at north
Sep 10, 2024 · Apt 18E
Closed — Violation dismissed
Show 4 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Apr 22, 2016
Closed — Violation closed
DOB building violations · 21
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2021
Dob violation - resolved - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 24, 2014
Dob violation - dismissed
Show 11 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 24, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 24, 2014
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 20, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 12, 2012
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 10, 2010
Dob violation - dismissed - Elevator elevatorrequired
Removed
Jul 3, 2010
Vw*-violation - work w/o permit dismissed - Zoning none
Z-zoning none
Jun 5, 1991
Dob violation - dismissed - Zoning none
Z-zoning none
Jun 5, 1991
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 5, 1991
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 5, 1991
Dob violation - dismissed
ECB violations · 31
- Class - 2
52b14,52m07,53m07,74b09,59b07. 52-shorten hoist ropes; 52-provide hoist rope data tag; 53-provide gov rope data gag; 74-remove recess behind cwt (standing room); 59-properly tag device with day/month/year perm
Apr 26, 2018 · Penalty $625
Resolve - Class - 2
Posting of unlawful signs information protocal reprensentation business or advertising messages on protective struction. note: active construction site of a 19 stories new bldg,observed advertising messages for
Jun 10, 2015 · Penalty $1,200
Resolve - Class - 1
Sec. 28-11 bldg occupied w/o a temporary c of o for soles office & model apt on 3rd fl. note at time of inspection observed sales office in apt 3a w/sales associates & computers set up & in apt 3d step up of
Jun 10, 2015
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order.note: at time of my inspection of a 19 story new bldg up to roof level, i observed pipe scaffold installed at exposure 4 and at exp1 interior pipe
Mar 31, 2015 · Penalty $4,800
Resolve - Class - 1
3314.9.2,foundation.note:@ the time of my insp const work of a 19 sty new bldg in process.building up to roof level.i observed workers working on pipe scaffold approx 6ft in height & approx 10 linear ft.i obser
Mar 9, 2015 · Penalty $1,600
Resolve - Class - 1
Work does not conform to approved const documents & or apporved amendments.note:@ the time of my insp of a 19 sty new building up to roof level.review of site safety plans indicate hoist in place @ exp one,roof
Mar 9, 2015 · Penalty $1,000
Resolve - Class - 1
3314.8,guard rails & toe boards.note:@ the time of insp const work of a 19 sty new bldg in process.building up to roof level.i observed two workers working on pipe scaffold approx 6 ft in height & a makeshift p
Mar 9, 2015 · Penalty $1,600
Resolve - Class - 1
Contrary to plans. noticed at time of inspection nb in progress,noticed at street loading area no yoddock barricades has truck loading and unloading maerial.ssp shows fully barricaded loading dock area on stre
Nov 12, 2014 · Penalty $1,000
Resolve - Class - 1
No toeboards. noticed at time of inspection nb in progress. at roof level no toeboards at leading edge in place. rmdy: provide toeboards as per code.
Nov 12, 2014 · Penalty $1,000
Resolve - Class - 2
Bc3303.1.2 service lines and conduit constiutte a tripping hazard.noticed at time of inspection nb in progress noticed electrical cords in egress paths on floor causing tripping hazards on floors 10,14 and 18.
Nov 12, 2014
Resolve
Show 21 more ↓
- Class - 1
Failure to provide unobstructed exit passageway.noticed at time of inspection nb in progress.noticed on 8th flr exit passageway block by tools set up in hallway on ground lefel egress pathway too tight not wide
Nov 12, 2014 · Penalty $1,200
Resolve - Class - 1
No guardrails.noticed at time of inspection nb in progress.at roof level on leading edge no guardrails in place for protection workers walk ing on roof. rmdy: provide guardrails as per code.
Nov 12, 2014 · Penalty $1,200
Resolve - Class - 1
Failure to maintain housekeeping. noticed at time of inspection snow &ice not cleaned on walkways and in front of ingress and egress ladders. remedy: maintain housekeeping as per code.
Feb 11, 2014 · Penalty $2,400
Resolve - Class - 2
Sec. bc 3301.7. design required by chapter 33 noticed at time of inspection 2 platforms erected w/no design drawings on site for them. remedy:provide design drawings as per code.
Feb 11, 2014 · Penalty $400
Resolve - Class - 1
Failure to safeguard. noticed at time of inspection workers working on7th flr deck on leading edges no lifelines in use. remedy: safeguard all persons and property as per code.
Feb 11, 2014 · Penalty $2,400
Resolve - Class - 1
Bc3303.1.2 service lines and conduti constitute a tripping hazard. noticed at time of inspection electrical cords on floor in front of egress path and workers walkways causing tripping hazards. rmdy: comply wit
Feb 11, 2014 · Penalty $1,600
Resolve - Class - 2
Horizontal safety netting not per code or inadequate. notice at time of inspection, horizontal netting full of snow and debris. remedy: provide adequate netting as per code. sec. bc 3308.2.
Feb 11, 2014 · Penalty $400
Resolve - Class - 1
Sec. bc 3309.10. no protection for roof. noticed at time of inspection. at exp 2 missing roof protection on adjacent property. remedy: provide protection as per code.
Feb 11, 2014 · Penalty $1,600
Resolve - Class - 1
Sec. 3308.3 vertical safety netting not per code,damaged or in adequate. noticed at time of inspection vertical netting missing & inadequate on several floors. remedy: provide adequate vertical netting as per
Jan 22, 2014 · Penalty $800
Resolve - Class - 1
Sec. 3309.10 no roof protection. noticed at time roof protection missing on adjacent property at exp 2,3. partial stop work order issued pursuant to 28-207.2 & posted at premises. remedy: stop all work from 4th
Jan 22, 2014 · Penalty $1,600
Resolve - Class - 1
No toe boards. noticed at time of inspection toe board missing on several floors. remedy: provide toe boards as per code.
Jan 22, 2014 · Penalty $1,000
Resolve - Class - 2
Failure to maintain due to circumstances beyond control contractor hasa petrolium based substance leaking into the site,possibly causing a danger to workers. remedy: stop work at this location (elevator pit)
Jul 30, 2013
Resolve - Class - 1
Sec. 3301.2 failure to provide 3'6" guardrail or equivalent around allperimeter. at exps 1,2 & 4 no guard rail or controlled access has beenerected around these areas where 8'+ fall hazard exists.remedy:provide
May 1, 2013 · Penalty $1,600
Resolve - Class - 1
Failure to notify dob w/i 24-48 hrs of the start of excavation. excavation operations have started w/the installation of concrete piers. seetr1 for excavation under foundation permit #121325501. remedy: notify
May 1, 2013 · Penalty $1,200
Resolve - Class - 2
Sec. 1704.1.1 failure to adequately file a special inspection statement of responsibility prior to permit issuance and prior to permit issuance & prior to the start of work under special inspection requirement
May 1, 2013 · Penalty $400
Resolve - Class - 2
Work does not conform to the aproved construction documents & or amendments. while work is being done under permit #121325501, the tie downsthat sit on top of the concrete piers are drill(ed) through piers into
May 1, 2013 · Penalty $250
Resolve - Class - 1
Failure to have site safety manager or coordinator present as requiredno site safety manager has been acquired during the start of the foundation/excavation operations.remedy:stop all excavation&demo operations
May 1, 2013 · Penalty $1,200
Resolve - Class - 2
Job site fence not constructed to subsection. at the time of my inspection approx 6 workers i observed job site fence erected on top of jersey barricade. plans show a solid 8' plywood const. fence.remedy:comply
Apr 18, 2013 · Penalty $400
Resolve - Class - 3
Work w/o permit.noted:an 8' high plywood fence has been erected @ the 3rd ave and e 39th st sides of bldg w/o a permit. rem:obtain permit;post @site or restore to prior legal condition.
Feb 14, 2013 · Penalty $100
Resolve - Class - 2
Fail to provide required signage & information on sidewalk shed. notedpermit & permit # information missing on shed. remedy: conform shed tocode
Dec 3, 2010 · Penalty $400
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 certifying to the installation of required fire protection systems. remedy: file report
Jan 10, 1994
Resolve
Complaints
- Water leak
Slow leak
Sep 8, 2026 · Apt 7D
Close - Paint/plaster
Ceiling
Sep 8, 2026 · Apt 7D
Close - Unsanitary condition
Mold
Sep 8, 2026 · Apt 7D
Close - Heat/hot water
Apartment only
Feb 11, 2026 · Apt 4D
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 4D
Close - Heat/hot water
Apartment only
Nov 4, 2025 · Apt 4D
Close - Heat/hot water
Entire building
Oct 30, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 25, 2025 · Apt 3F
Close - Heat/hot water
Entire building
Mar 22, 2025 · Apt 3SA
Close - Heat/hot water
Apartment only
Jan 23, 2025 · Apt 4D
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Dec 31, 2024 · Apt 3F
Close - Heat/hot water
Apartment only
Dec 27, 2024 · Apt 3F
Close - Heat/hot water
Apartment only
Dec 22, 2024 · Apt 3F
Close - Heat/hot water
Entire building
Dec 20, 2024 · Apt 3F
Close - Heat/hot water
Entire building
Oct 25, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2024 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 20, 2024 · Apt 18E
Close - Flooring/stairs
Floor
Mar 21, 2022 · Apt 4C
Close - Heat/hot water
Entire building
Jan 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 31, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 29, 2019 · Apt 1201
Close - Heat/hot water
Entire building
Apr 23, 2019 · Apt 17A
Close - Heat/hot water
Entire building
Apr 8, 2019 · Apt 5A
Close - Heat/hot water
Entire building
Mar 9, 2019 · Apt 4C
Close - Heat/hot water
Entire building
Jan 17, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2019 · Apt 6A
Close - Heat/hot water
Entire building
May 9, 2018 · Apt 9D
Close - Heat/hot water
Entire building
May 7, 2018 · Apt 19A
Close - Heat/hot water
Apartment only
Mar 6, 2018 · Apt 7D
Close - Heat/hot water
Entire building
Nov 30, 2017 · Apt 12D
Close - Heat/hot water
Entire building
Oct 26, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 7, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
May 22, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
May 21, 2017 · Apt 1D
Close - Heat/hot water
Entire building
May 17, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
May 11, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
May 2, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
May 1, 2017 · Apt 17D
Close - Heat/hot water
Entire building
Apr 30, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 28, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 18, 2017 · Apt 7C
Close - Heat/hot water
Entire building
Apr 13, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2017 · Apt 12E
Close - Heat/hot water
Apartment only
Dec 20, 2016 · Apt 3D
Close - Heat/hot water
Apartment only
Nov 20, 2016 · Apt 11C
Close - Heat/hot water
Apartment only
Oct 31, 2016 · Apt 4D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2013
- Floors
- 19
- Residential units
- 70
- Building area
- 73,216 ft²
- Lot area
- 4,950 ft²
- Zoning
- C1-9
- Community board
- 106
- Council district
- 4
- Block / lot
- 919 / 59
- Assessed value
- $10,795,050
- Landmark / historic district
- No
HPD registration #144021, last renewed Oct 14, 2025.
Questions about 593 3 Avenue
Who owns 593 3 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Frontier Restaurant INC..
Does 593 3 Avenue have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 593 3 Avenue rent stabilized?
NYC Department of Finance tax bills listed 91 rent-stabilized units here in 2024 (about 100% of its 70 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 593 3 Avenue built?
City records list 2013 as the year it was built.
How many apartments are in 593 3 Avenue?
It has 70 residential units and 71 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.