240 East 39 Street
Manhattan, NY 10016BBL 1-00919-0014Map
Owner of record: East 39th Realty LLC
240 East 39 Street is an elevator apartment building built in 1997 in Manhattan, 10016. It has 464 residential units across 52 floors. The owner of record is East 39th Realty LLC. HPD has recorded 6 housing violations here, most recently on July 18, 2017. City tax records listed 93 rent-stabilized apartments here in 2024.
- HPD violations
- 6
- DOB violations
- 117
- ECB violations
- 27
- HPD complaints
- 43
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 6
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at lobby, 1st story
Jul 18, 2017
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 18, 2017
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jul 18, 2017
Closed — Violation closed - ANon-hazardous
File with this department a registration statement for building. at public hall, 1st story
Jul 18, 2017
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jul 18, 2017
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 18, 2017
Closed — Violation closed
DOB building violations · 117
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed
Show 40 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 14, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 10, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 10, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 10, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 10, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 10, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 10, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 10, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 2, 2010
Dob violation - resolved
ECB violations · 27
- Class - 2
Failure to maintain parking structures in a safe condition. as noted at time of inspection on an occupied parking garage consisting of 02 levels. observed *)multiple hairline cracks at ceiling and floor slabs,
Dec 13, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #902849.remedy:submit acceptable required te
Dec 9, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building walls/appurtenances: noted: observed at exposure #4 the retaining wall approximately 4 feet high by 50 feet long with several missing bricks and crack bricks., maintain exterior bui
May 18, 2019
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. *west elevation exp4, observed overhanging debris on 42 fl; spalled concreteslab on 9th floor. *roof level, observed cracked coping stones on vari
Feb 6, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: provide required corridor width per bc 1016.2;27-369. noted: at cellar level hallway cubbies for clothing. remedy: provide proper corridor width remove obstruc
Mar 6, 2017 · Penalty $250
Resolve - Class - 1
06i10 car gate damaged repair call 213-393-2488 to lift cease use
Oct 31, 2016
Resolve - Class - 2
Failure to maintain bldg in code compliant manner.noted(1)the following doors are not self closing:(1)bsmt from 1st fl.emergency exit from bsmt.all bsmt doors.(2)no illuminated exit signs @ doors to street.(3)l
Apr 3, 2015 · Penalty $2,500
Resolve - Class - 2
27-987/3001.2: 97rii;operating an equipment without a cert of compliance obtain a valid cert bc 3007.1.1/27-185/28-116.4.1 (b262)
May 16, 2012 · Penalty $250
Resolve - Class - 2
Sec. notification prior to commencement of work. noted: notification #1029145 was made on 3/10/10 with a start date of 3/11/10 upon inspection of location (240 e 39 st,ny). no suspended scaffold was found. cont
Mar 17, 2010
Resolve - Non-hazardous
2x10 (2-x-10) repair alarm system car station.
Jul 14, 2006 · Penalty $2,500
Resolve
Show 17 more ↓
- Non-hazardous
New building occupied without a valid certificate of occupancy. noted new building application number 101379713 for 52 floors without a c ofo for third floor (9 apt. occupied) 4 through 52 occupied under temp c
Apr 27, 1999
Resolve - Non-hazardous
New building occupied without a valid certificate of occupancy. new building application #101379713 nb. noted: various apts on various floor between the 25 & 44th floor. remedy: obtain valid c of o.
Feb 12, 1999
Resolve - Non-hazardous
Work does not conform to approved plans. noted: duplex apartment con- structed between the 26th & 27th floor at apt. #j. west side of bldg. contrary to approved appl. & plans #101379713 nb. approved 11/23/97.
Feb 12, 1999 · Penalty $130
Resolve - Non-hazardous
New building occupied without a valid certificate of occupancy. noted alteration number 101379713 nb several floors being occupied with various apartment on floors (23,21,14,9,6 and 4 floors) obtain valid c of
Jan 22, 1999
Resolve - Hazardous
Failure to provide adequate housekeeping on floor no. 43,42,41,40,39,at time of inspection there was card board boxes,crates,pieces of ply-wood metal bands,pieces of cast iron pipes, all over the floors.
Aug 25, 1998 · Penalty $1,760
Resolve - Hazardous
Failure to provide adequate house keeping on floors no. 49,48,47,46,45at time of inspection there was dried morter pieces of bricks,concreteblocks, and dried coment all over these floors. remedy:provide adequat
Aug 25, 1998 · Penalty $1,000
Resolve - Hazardous
No d.o.t. permit posted: upon inspection at above premises bricklayersmaterial was place in the street in front of 241 east 38 street dept. record show no permit was issued to ocupied the street in front of 241
Aug 17, 1998 · Penalty $2,500
Resolve - Hazardous
Failure to perform adequate housekeeping upon inspection at said premises floors no. 43,45,46,47,48 was in need of housekeeping debris consist of 2"x 4" 4" x 4" lumber/plywood lumps of dried concrete cut sonotu
Jul 13, 1998
Resolve - Hazardous
Work without permit; upon inspection at above premises a personnel hoist was been erected and incomplete at west side of building dept. record show no permit was issued for said hoist. remedy; obtain permit
Jul 6, 1998
Resolve - Hazardous
Failure to provide adequate housekeeping: upon insepction at above premises floors no.30,29,22,21 was in need of housekeeping debris consistof pieces of plywood, crates, dried concrete, pieces of cast iron pipe
Jun 29, 1998 · Penalty $860
Resolve - Hazardous
Debris not removed from safety netting upon inspection at above premises horizontal safety netting at the 36 floor was in need of cleaning debris consist of drie concrete, 2"x4" lumber, plastic buckets, plywood
Jun 9, 1998
Resolve - Hazardous
No toe boards. upon inspection at above premises vertical safety netting was not shot down & secured on fls 32-33 & was not secured in various locations on fl #30, 31, 26 & 25 at facade of bldg.
Jun 1, 1998 · Penalty $1,250
Resolve - Hazardous
Openings/holes uncovered. at time of inspection there was open holes not covered on fls #33, 32, 31. remedy: cover opening holes as per code.
Jun 1, 1998 · Penalty $1,250
Resolve - Non-hazardous
Work without permit. fire sprinkler system is being installed at above premises at time of inspection. dept. records show no permit was issued for said work. remedy: obtain permit for said work from this dept.
Apr 23, 1998 · Penalty $250
Resolve - Hazardous
No elevator in readiness. at time of inspection at above premises newbldg has reach a height of 9fl & there is no elevator in readiness forthe fire dept use. remedy: stop all work above the 8th fl.
Mar 3, 1998
Resolve - Hazardous
Failure to provide adequate housekeeping. at time of inspection at said premises, bldg has reached a height of 9 fls & in need of house keeping from the 1-6 fl. there was pieces of 4"x4" lumber, plywood.
Mar 3, 1998
Resolve - Hazardous
Failure to secure reshores at facade of building on the 3rd floor: approx. 90% of the 3rd floor was staipped and 20 reshores was not band secured as per code at the above premises at the time of inspection. rem
Feb 18, 1998
Resolve
Complaints
- Heat/hot water
Apartment only
Aug 4, 2026 · Apt WR
Close - General
Cooking gas
Jul 17, 2025 · Apt 32J
Close - General
Bell/buzzer/intercom
Apr 10, 2024 · Apt 4F
Close - Unsanitary condition
Pests
May 10, 2023 · Apt 8F
Close - Unsanitary condition
Pests
May 9, 2023 · Apt 8F
Close - Heat/hot water
Entire building
May 2, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 23, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2020 · Apt BLDG
Close - Unsanitary condition
Mold
Jan 2, 2020 · Apt 34H
Close - Unsanitary condition
Mold
Dec 3, 2019 · Apt 34H
Close
Show 33 more ↓
- Heat/hot water
Entire building
Oct 12, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
May 14, 2019 · Apt 41
Close - Heat/hot water
Entire building
Apr 28, 2019 · Apt 8F
Close - Heat/hot water
Entire building
Dec 21, 2018 · Apt 31D
Close - Unsanitary condition
Pests
Jul 10, 2017 · Apt 24G
Close - Unsanitary condition
Pests
Jul 10, 2017 · Apt 24G
Close - Heat/hot water
Entire building
May 12, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 9, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 27, 2016 · Apt 19E
Close - Heat/hot water
Entire building
Dec 7, 2015 · Apt 40E
Close - Heat/hot water
Entire building
Nov 28, 2015 · Apt 47A
Close - Heat/hot water
Entire building
Nov 23, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2015 · Apt 5D
Close - Heat/hot water
Entire building
Nov 9, 2014 · Apt BLDG
Close - Heating
Heat related
Oct 23, 2013 · Apt NA
Close - Heating
Heat related
Oct 23, 2013 · Apt 23K
Close - Heating
Heat related
May 14, 2013 · Apt NA
Close - Heating
Heat related
May 13, 2013 · Apt 18D
Close - Heating
Heat related
Nov 6, 2011 · Apt 35H
Close - Nonconst
Vermin
Jul 23, 2011 · Apt 512
Close - Nonconst
Vermin
Jul 22, 2011 · Apt 512
Close - General
Windows
Oct 22, 2009 · Apt 8H
Close - General
Ceramic-tile
Jun 21, 2009 · Apt 512
Close - Heating
Heat related
Mar 21, 2009 · Apt 30H
Close - Plumbing
Bathtub/shower
Dec 22, 2006 · Apt 8H
Close - Paint/plaster
Wall
Dec 22, 2006 · Apt 8H
Close - Plumbing
Water-leaks
Dec 22, 2006 · Apt 8H
Close - Construction
Elevator
May 30, 2006 · Apt 5A
Close - Nonconst
Vermin
May 30, 2006 · Apt 5A
Close - Nonconst
Vermin
May 30, 2006 · Apt 5A
Close - Heating
Heat related
Oct 21, 2005 · Apt BLDG
Close - Heating
Heat related
Oct 18, 2005 · Apt 43G
Close - Heating
Heat related
Oct 17, 2004 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D8)
- Year built
- 1997
- Floors
- 52
- Residential units
- 464
- Building area
- 624,519 ft²
- Lot area
- 37,219 ft²
- Zoning
- C1-9
- Community board
- 106
- Council district
- 4
- Block / lot
- 919 / 14
- Assessed value
- $69,309,900
- Landmark / historic district
- No
HPD registration #141385, last renewed Jul 29, 2025.
Questions about 240 East 39 Street
Who owns 240 East 39 Street?
The owner of record in NYC Department of City Planning PLUTO data is East 39th Realty LLC.
Does 240 East 39 Street have violations?
Yes. NYC HPD has recorded 6 housing violations at this property.
Is 240 East 39 Street rent stabilized?
NYC Department of Finance tax bills listed 93 rent-stabilized units here in 2024 (about 20% of its 464 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 240 East 39 Street built?
City records list 1997 as the year it was built.
How many apartments are in 240 East 39 Street?
It has 464 residential units and 470 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.