202 East 21 Street
Manhattan, NY 10010BBL 1-00901-0056Map
Owner of record: 202 East 21st Street LLC
202 East 21 Street is an elevator apartment building built in 1925 in Manhattan, 10010. It has 27 residential units across 7 floors. The owner of record is 202 East 21st Street LLC. HPD has recorded 119 housing violations here, most recently on August 22, 2026. 5 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 119
- DOB violations
- 22
- ECB violations
- 26
- HPD complaints
- 935
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 119
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north, east and south walls in the 3rd room from north located at bsmt-apt 1a, 1st bsmt-apt from north at east
Aug 22, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the private hallway located at bsmt-apt 1a, 1st bsmt-apt from north at east
Aug 22, 2026 · Apt 1A
Open — Civ14 mailed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator cover at south wall in the 3rd room from north located at bsmt-apt 1a, 1st bsmt-apt from north at east
Aug 22, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective hardwood floor in the 1st room from north located at bsmt-apt 1a, 1st bsmt-apt from north at east
Aug 22, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective compactor room door frame at basement at public hall
Mar 23, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story
Jan 4, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 7a, 6th story, 1st apartment from south at west
Nov 14, 2023 · Apt 7A
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the visible evidence of mold grout at north wall in the bathroom located at apt 7a, 6th story, 1st apartment from south at west
Nov 14, 2023 · Apt 7A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mortise lock set and assembly at door in the entrance located at apt 3d, 3rd story, 1st apartment from east at south
Aug 17, 2023 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower window sash counter balance at south wall in the 2nd room from north located at apt 3d, 3rd story, 1st apartment from east at south
Aug 17, 2023 · Apt 3D
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 2nd room from north located at apt 3d, 2nd story, 1st apartment from east at south
Jul 26, 2023 · Apt 3D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3d, 2nd story, 1st apartment from east at south
Jul 26, 2023 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the kitchen located at apt 3d, 2nd story, 1st apartment from east at south
Jul 26, 2023 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 3d, 2nd story, 1st apartment from east at south
Jul 26, 2023 · Apt 3D
Closed — Violation closed - ANon-hazardous
Refit door in the entrance located at apt 3d, 2nd story, 1st apartment from east at south
Jul 26, 2023 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at upper and lower sashes at south 2 window in the 2nd room from north located at apt 3d, 2nd story, 1st apartment from east at south
Jul 26, 2023 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 3d, 2nd story, 1st apartment from east at south
Jul 26, 2023 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at vestibule
May 3, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at vestibule
May 3, 2023
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked. at boiler room, 1st story
Feb 2, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6d, 6th story, 1st apartment from west at north
Feb 2, 2023 · Apt 6D
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6d, 6th story, 1st apartment from west at north
Feb 2, 2023 · Apt 6D
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 4th sty balcony, front stack at fire escape
Apr 28, 2022
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles basement at public hall
Nov 20, 2021
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective lock and latch assembly at building front entrance door basement at public hall
Nov 20, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and north wall at public hall, 6th story
Oct 24, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 6th story
Oct 24, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall at basement at public hall stairs
Nov 30, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at basement at public hall stairs
Nov 30, 2020
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing information at public hall, 1st story
Dec 11, 2018
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system key not on premises at public hall, 1st story
Oct 16, 2018
Closed — Violation dismissed - ANon-hazardous
Provide place within the building for the storage of waste receptacles and disinfect same regularly. at public hall
Aug 27, 2018
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of garbage stored under stairs at public hall basement story
Aug 27, 2018
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration sheetrock wall with door from floor to ceiling under stairs at basement story public hall
Aug 27, 2018
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 27, 2018
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Apr 26, 2018
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from north located at apt 7b, 7th story, 1st apartment from north at east
Sep 13, 2017 · Apt 7B
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of building materials at public hall, 1st story
Feb 22, 2017
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at public hall, 6th story
Feb 7, 2017
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall at public hall, 4th story
Feb 7, 2017
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at public hall, 4th story
Feb 7, 2017
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at public hall, 1st story
Feb 7, 2017
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall at public hall, 1st story
Feb 7, 2017
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 6th story
Feb 7, 2017
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 6th story
Feb 7, 2017
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at public hall, 6th story
Feb 7, 2017
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 5th story
Feb 7, 2017
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at public hall, 5th story
Feb 7, 2017
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 4th story
Feb 7, 2017
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall at public hall, 1st story
Feb 7, 2017
Closed — Violation dismissed
DOB building violations · 22
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2013
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed
Show 12 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Sep 15, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2007
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 20, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Elevator elevatorrequired
1p29498
Nov 15, 2000
Dob violation - resolved - Facade facade optional
Ll10/80-local law 10/80 - facade facade optional
Sep 3, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Elevator elevatorrequired
(47)remove and clean all material and take from motor room
Jun 7, 1989
Dob violation - resolved - Elevator elevatorrequired
(15)secure top exit cover.(43)repair or renew the guide shoe's (47)remove all non - elevator equipment from motor room
Oct 11, 1988
Dob violation - resolved
ECB violations · 26
- Class - 3
Failure to maintain building in code compliant manner. noted, at the time of inspection observed the storm drain in between this building and building # 208 blocked and there is three roof drain gutter pouring
Sep 11, 2019
Resolve - Class - 2
Failure to post or distribute safe construction bill of rights. noted:at time of inspection observed no safe construction bill of rights posted in the building and tenants stated they did not receive it. failur
Feb 20, 2019 · Penalty $3,125
Resolve - Class - 2
Failure to post or distribute notice of tenants protection plan. notedat time of inspection observed no tenant protection plan posted in thebuilding and tenants stated they didn't receive anything. failure to p
Feb 20, 2019 · Penalty $3,125
Resolve - Class - 1
1b11,68b7,7m7. 1b11-emergency stops with bell,not loud enough and intermittent-replace; 68b7-maintenance logs and mcp not current provide; 7m7-zone lock missing provide.
May 31, 2017 · Penalty $1,000
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancew/article 28-302 of the bldg code and dob's rules and regulations. 36017769y. respondent has demonstrated a history of non-compliance w/dept
Jul 27, 2012
Resolve - Class - 2
Work w/o permit.work noted:demolition of partitions & removing plumbing & electrical work.installing new plumbings & electrical work in apt#7a & 5a without obtaining all approvals & permits from bldg dept.rem:s
Apr 17, 2012
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance with code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations 36
Dec 15, 2011 · Penalty $2,000
Resolve - Class - 2
Front elevn defective stucco was found at corners of main entrance step crack was found at 2/f lintel & wood block were found sitting on 4/f sill rem: maintain exterior remove repair & replace defects including
Mar 22, 2011 · Penalty $1,250
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancew/code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regs. 36013231y.
Jan 25, 2011 · Penalty $2,000
Resolve - Class - 2
08v01,41i10,41t07.
Nov 29, 2010 · Penalty $250
Resolve
Show 16 more ↓
- Class - 2
Failure to maintain bldg walls & appurtenances.step cracks were found under a/c unit @ 2 flr lintels @ front elevn.wood blocks were found under 4flr a/c unit @ front elevn.despite of previous vio@34837210y date
Sep 29, 2010 · Penalty $250
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancew/code provisions: periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules and regulations.
Jun 4, 2010 · Penalty $2,000
Resolve - Class - 1
Failure to maintain bldg walls and appurtenances. (i) step cracks werefound at 2/f windows at lintel level. (ii) loose mortar was found at joints of coping at north elev by central courtyard g/at top of pilast
Apr 21, 2010 · Penalty $1,000
Resolve - Class - 2
02b01.08v01.71q3.81m7.02b1 adjust alarm to the emergency stop switch 12x10one light fixture not working repair light 16d06 lobby hall door sight guard loose secure guard 29m11 door operator cover missing 32b07
Nov 9, 2009 · Penalty $500
Resolve - Class - 2
Failure to maintain exterior bldg south elevation observe flower pots & plant storage on fire escape landing on the 4,5 & 7th fl.north elevation observe blocks of wood improperly installed under air condition
Sep 15, 2009 · Penalty $250
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rules & regulation
Nov 28, 2008 · Penalty $800
Resolve - Non-hazardous
8v1/12l10/16o2/15i11/24l10/16m7/39o2/40d6/40m11/.16-o-2-remove dirt/soot off all spring closers on hoistway doors.24-l-10-repair 6th fl indicator.16-m-7-missing fl markings on all fls.40-d-6-machine room door
Apr 30, 2007 · Penalty $350
Resolve - Non-hazardous
16m7/55y2/58b7/39o2/63m7/28m7/66o2/15m7/40m7/.16-provide bracket & gibs for basement hoistway door.58-provide proper hardware for brake assembly(clip)etc.also proper greenfield from brake plunger handibox to
Apr 10, 2007 · Penalty $350
Resolve - Non-hazardous
03f11-35p17-15m07-74m07. 03-f-11, excessive side play of cab in sling.15-m-07 provide sight guard on 3 floor door, 74-m-07 2 steps to mach room missing.
Apr 24, 2002 · Penalty $180
Resolve - Hazardous
Failure to file an amended round four report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating of hazardous conditions described in initial ll10/80 report. file an amended report fol
Sep 30, 1998 · Penalty $2,500
Resolve - Hazardous
Failure to file an amended round four report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report. remedy: file an
Jul 23, 1998 · Penalty $10,000
Resolve - Hazardous
Failure to file an amended round four report acceptable to this department pursuant to rule r.c.n.y 32-03b(5) indicating correction of hazardous conditions described intial ll10/80 report. remedy: file an amend
May 12, 1998 · Penalty $1,000
Resolve - Hazardous
Failure to file an amended round 4 report acceptable to this dept pursuant to rule rcny 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report.
Mar 12, 1998 · Penalty $400
Resolve - Hazardous
Failure to file an amended round four report acceptable to this department pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll10/80 report.remedy file an am
Feb 3, 1998 · Penalty $1,000
Resolve - Hazardous
Failure to an amended round four report acceptable to this department pursuant to rule r.c.n.y 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report. remedy: file an amend
Dec 29, 1997 · Penalty $400
Resolve - Non-hazardous
35p,74#,. 35- provide means of access in accordance with r.s 18 rule 101.3 74. repair stairs to motor-room.
Sep 29, 1995 · Penalty $1,000
Resolve
Complaints
- Unsanitary condition
Mold
Jul 28, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt 4A
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt BUILDI
Close - Heat/hot water
Entire building
Oct 26, 2025 · Apt BUILDI
Close - Heat/hot water
Entire building
Oct 24, 2025 · Apt BLDGWI
Close - Heat/hot water
Entire building
Oct 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
May 22, 2025 · Apt 4D
Close - Heat/hot water
Entire building
May 22, 2025 · Apt ALL
Close - Heat/hot water
Entire building
May 22, 2025 · Apt BUILDI
Close - Heat/hot water
Entire building
Apr 17, 2025 · Apt 4D
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 8, 2025 · Apt BUILDI
Close - Heat/hot water
Entire building
Mar 7, 2025 · Apt 4D
Close - Heat/hot water
Entire building
Mar 7, 2025 · Apt ALL
Close - Heat/hot water
Entire building
Mar 1, 2025 · Apt 4D
Close - Heat/hot water
Apartment only
Feb 11, 2025 · Apt 4D
Close - Heat/hot water
Entire building
Dec 1, 2024 · Apt 4D
Close - Heat/hot water
Entire building
Oct 10, 2024 · Apt BUILDI
Close - Heat/hot water
Entire building
Oct 10, 2024 · Apt ALL
Close - Heat/hot water
Entire building
May 5, 2024 · Apt BULDIN
Close - Heat/hot water
Entire building
Apr 8, 2024 · Apt WHOLEB
Close - Heat/hot water
Entire building
Apr 8, 2024 · Apt BUILDI
Close - Heat/hot water
Entire building
Apr 8, 2024 · Apt BUILDI
Close - Heat/hot water
Entire building
Mar 21, 2024 · Apt BUILDI
Close - Heat/hot water
Entire building
Mar 21, 2024 · Apt ALL
Close - Heat/hot water
Entire building
Feb 27, 2024 · Apt BLDGWI
Close - Heat/hot water
Entire building
Feb 27, 2024 · Apt ALL
Close - Heat/hot water
Entire building
Feb 27, 2024 · Apt BUILDI
Close - Heat/hot water
Entire building
Feb 2, 2024 · Apt FIRSTF
Close - Heat/hot water
Entire building
Dec 31, 2023 · Apt ALLHAV
Close - Heat/hot water
Entire building
Dec 31, 2023 · Apt NOHEAT
Close - Heat/hot water
Entire building
Dec 31, 2023 · Apt EVERY
Close - Heat/hot water
Entire building
Nov 12, 2023 · Apt EVERYF
Close - Heat/hot water
Entire building
Nov 12, 2023 · Apt BUILDI
Close - Heat/hot water
Entire building
Nov 12, 2023 · Apt FREEZI
Close - Heat/hot water
Entire building
Nov 12, 2023 · Apt ALLHOT
Close - Heat/hot water
Entire building
Oct 29, 2023 · Apt EVERYH
Close - Heat/hot water
Entire building
Oct 13, 2023 · Apt ALL
Close - Heat/hot water
Entire building
Oct 13, 2023 · Apt BUILDI
Close - Heat/hot water
Entire building
Oct 13, 2023 · Apt BUILDI
Close - Heat/hot water
Entire building
Oct 13, 2023 · Apt ALL
Close - Heat/hot water
Entire building
Oct 9, 2023 · Apt ALL
Close - Unsanitary condition
Garbage/recycling storage
Oct 9, 2023 · Apt ALL
Close - Heat/hot water
Entire building
Oct 9, 2023 · Apt BUILDI
Close - Unsanitary condition
Pests
Sep 1, 2023 · Apt COMMON
Close - Unsanitary condition
Pests
Sep 1, 2023 · Apt COMMON
Close - Door/window
Window frame
Aug 14, 2023 · Apt 3D
Close - Door/window
Door
Aug 14, 2023 · Apt 3D
Close - Paint/plaster
Wall
Jul 20, 2023 · Apt 3D
Close - Door/window
Window frame
Jul 20, 2023 · Apt 3D
Close - Unsanitary condition
Mold
Jul 20, 2023 · Apt 3D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 1925
- Floors
- 7
- Residential units
- 27
- Building area
- 14,721 ft²
- Lot area
- 2,772 ft²
- Zoning
- C1-9A
- Community board
- 106
- Council district
- 2
- Block / lot
- 901 / 56
- Assessed value
- $2,594,700
- Landmark / historic district
- No
HPD registration #122859, last renewed Oct 7, 2025.
Questions about 202 East 21 Street
Who owns 202 East 21 Street?
The owner of record in NYC Department of City Planning PLUTO data is 202 East 21st Street LLC.
Does 202 East 21 Street have violations?
Yes. NYC HPD has recorded 119 housing violations at this property.
Is 202 East 21 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 22% of its 27 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 202 East 21 Street built?
City records list 1925 as the year it was built.
How many apartments are in 202 East 21 Street?
It has 27 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.