roofy

15 East 31 Street

Manhattan, NY 10016BBL 1-00861-7501Map

Owner of record: Unavailable Owner

15 East 31 Street is a condominium built in 1925 in Manhattan, 10016. The owner of record is Unavailable Owner. HPD has recorded 215 housing violations here, most recently on April 28, 2022. 1 of the 50 most recent violations are still open.

HPD violations
215
DOB violations
11
ECB violations
27
HPD complaints
491

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 28, 2022

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 215

  • B

    Properly repair the broken or defective intercom system in the 4th room from north located at apt floor4, 4th story, 1st apartment from north at east

    Apr 28, 2022 · Apt FLOOR4

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system .....basement door locked .... at boiler room

    Dec 17, 2021

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 4th story, 1st apartment from north at east

    Dec 17, 2021 · Apt 4

    Closed — Violation closed
  • B

    Properly repair the broken or defective .... electrical outlet at the west wall in the 5th room from north located at apt 4, 4th story, 1st apartment from north at east

    Dec 17, 2021 · Apt 4

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of ....exposed electricat wires at the ceiling and south wall... in the 5th room from north located at apt 4, 4th story, 1st apartment from north at east

    Dec 17, 2021 · Apt 4

    Closed — Violation closed
  • C

    Abate the infestation consisting of rodents rat excerta at cellar

    May 9, 2021

    Closed — Violation closed
  • C

    Replace with new the missing handrail at public hall stairs, 2nd story

    May 9, 2021

    Closed — Violation closed
  • C

    Replace with new the missing handrail at public hall stairs, 4th story

    May 9, 2021

    Closed — Violation closed
  • C

    Replace with new the missing handrail at public hall stairs, 3rd story

    May 9, 2021

    Closed — Violation closed
Show 40 more ↓
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    May 9, 2021

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation door in the entrance located at apt floor4, 4th story, 1st apartment from north at east

    May 9, 2021 · Apt FLOOR4

    Closed — Violation closed
  • C

    Properly repair the broken or defective defective lockset and assembly in the entrance located at apt 4, 4th story, 1st apartment from north at east

    May 9, 2021 · Apt 4

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 4th story, 1st apartment from north at east

    May 9, 2021 · Apt 4

    Closed — Violation dismissed
  • B

    Provide a safe and adequate supply of electric service to the fixtures at electrical outlet at south wall in the 4th room from north located at apt floor4, 4th story, 1st apartment from north at east

    May 9, 2021 · Apt FLOOR4

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective cement floor in the 2nd room from north located at apt floor4, 4th story, 1st apartment from north at east

    May 9, 2021 · Apt FLOOR4

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling and west wall in the 1st room from north located at apt floor4, 4th story, 1st apartment from north at east

    May 9, 2021 · Apt FLOOR4

    Closed — Violation closed
  • B

    Properly repair the broken or defective bell, buzzer, and return intercom systems from building front entrance to in the entire apartment located at apt floor4, 4th story, 1st apartment from north at east

    May 9, 2021 · Apt FLOOR4

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling at public hall, 1st story

    Apr 16, 2021

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system basement door locked at boiler room

    Apr 16, 2021

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 4th story, 1st apartment from north at east

    Apr 16, 2021 · Apt 4

    Closed — Violation closed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Apr 16, 2021

    Closed — Violation closed
  • B

    Repair by closing so as to be gas tight all openings in the wasteline at south wall in the 4th room from north located at apt 4, 4th story, 1st apartment from north at east

    Apr 5, 2021 · Apt 4

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of electrical wiring exposed at ceiling juction box. in the 2nd room from north located at apt 4, 4th story, 1st apartment from north at east

    Apr 5, 2021 · Apt 4

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective ceramic floor tiles in the 2nd room from north located at apt 4, 4th story, 1st apartment from north at east

    Apr 5, 2021 · Apt 4

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 4th story, 1st apartment from north at east

    Apr 5, 2021 · Apt 4

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures for cooking at range in the kitchen located at apt 4, 4th story, 1st apartment from north at east

    Apr 5, 2021 · Apt 4

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 1, 2021

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the kitchen located at apt 4fl, 4th story, 1st apartment from north at east

    Jan 16, 2021 · Apt 4FL

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceilings at public hall, 4th story

    Dec 20, 2020

    Closed — Violation closed
  • A

    Properly repair the broken or defective bell return buzzer from street entrance to the apartment in the entrance located at apt 4fl, 4th story, 1st apartment from north at east

    Dec 20, 2020 · Apt 4FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at all walls and ceiling at public hall, 1st story

    Dec 20, 2020

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 1st story

    Dec 20, 2020

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of construction material and demolition containers at public hall, 1st story

    Dec 20, 2020

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at all walls and ceilings at public hall, 3rd story

    Dec 20, 2020

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceilings at public hall, 3rd story

    Dec 20, 2020

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at all walls and ceilings at public hall, 4th story

    Dec 20, 2020

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective concrete floor at public hall, 3rd story

    Dec 20, 2020

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at all walls and ceiling at public hall, 2nd story

    Dec 20, 2020

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor at walk area in the 2nd room from north located at apt 4fl, 4th story, 1st apartment from north at east

    Dec 20, 2020 · Apt 4FL

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 4fl, 4th story, 1st apartment from north at east

    Dec 20, 2020 · Apt 4FL

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from north located at apt 4fl, 4th story, 1st apartment from north at east

    Dec 20, 2020 · Apt 4FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective vinyl tiled floor in the kitchen located at apt 4fl, 4th story, 1st apartment from north at east

    Dec 20, 2020 · Apt 4FL

    Closed — Violation closed
  • B

    Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 4fl, 4th story, 1st apartment from north at east

    Dec 20, 2020 · Apt 4FL

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 4fl, 4th story, 1st apartment from north at east

    Dec 20, 2020 · Apt 4FL

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 3rd room from north located at apt 4fl, 4th story, 1st apartment from north at east

    Dec 20, 2020 · Apt 4FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective unfinished wood floor in the 3rd room from north located at apt 4fl, 4th story, 1st apartment from north at east

    Dec 20, 2020 · Apt 4FL

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at all walls and ceiling at public hall, 2nd story

    Dec 20, 2020

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tile floor in the private hallway located at apt 4, 4th story, 1st apartment from north at east

    Dec 9, 2020 · Apt 4

    Closed — Violation closed

DOB building violations · 11

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 1, 2019

    Dob violation - resolved
  • Construction other optional

    Boro commissioner has issued a swo under appl.#121985780 due to contractor withdrawal from project. unable to determine % of work completed. stop all work immediately & make site safe remedy: provide all required information to boro commissioner's office

    Jan 23, 2019

    Dob violation - dismissed
  • Construction other optional

    Boro commissioner has issued a swo due to contractor withdrawal under appl.#122986536. unable to determine % of work completed. stop all work immediately & make site safe remedy: provide all required information to the boro commissioner's office immediately

    Jan 7, 2019

    Dob violation - active
  • Construction other optional

    Boro commissioner has issued a swo under appl.#121985771 due to contractor withdrawal. unable to determine % of work completed. stop all work immediately & make site safe remedy: provide all required information to the boro commissioner's office immediatley

    Jan 7, 2019

    Dob violation - active
  • Construction other optional

    Borough commissioner has issued a stop work order under application #122986536 due to contractor withdrawal. unable to determine % of work completed. stop all work immediately and make site safe. rem: provide all the required information to the borough commissioner immediately

    Jan 3, 2019

    Dob violation - dismissed
  • Construction other optional

    Borough commissioner has issued a stop work order under application #121985771 due to applicant withdrawal. unable to determine % of work completed. stop all work immediately and make site safe. rem: provide all the required information to the borough commissioner immediately

    Jan 3, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 10, 2018

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 9, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 9, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 9, 2018

    Dob violation - dismissed
Show 1 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed

ECB violations · 27

  • Class - 2

    Failure to submit an acceptable required cycle 8c report of critical exmination documenting condition of exteiror wall and apprutenances required by 28-302.4 and control #802438.submit acceptable required techn

    Feb 13, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain building wall or appurtenance. noted, at the time of inspection observed the building facade wall plaster defected and falling in room # 302 terrace for the adjacent hotel. , maintain exteri

    Jun 25, 2019

    Resolve
  • Class - 2

    Failure to comply w/ commissioner's order contained in summons/violation#35313195y issued on 5/2/18,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certificate

    Feb 14, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to safe guard all persons & property affected by construction operations. noted: @ all floors, basement to 8th flr removed concrete floor slabs. apt#4 on 4th flr is occupied & the compromised floor slab

    May 15, 2018

    Resolve
  • Class - 1

    Failure to maintain bldg in a code compliant manner. no fire stopping,per bc 712.3, 27-345. work noted: @ apt#4, 4th flr, cut open concrete flr slab above & below in apt#4 which is occupied, rendering occupants

    May 15, 2018

    Resolve
  • Class - 2

    Unapproved, unsafe, unsuitable electrical equipment. devices, appliances, apparatus materials or wiring in use. 8 foot indoor florescent fixtures used outdoor in front of store. rem: comply with ec code. obtain

    May 2, 2018 · Penalty $800

    Resolve
  • Class - 1

    Work w/o a permit. plans on site w/jopb#121985771 has fire suppression work listed & shown. no lmp or fire supression license holder on record work is 50% complete. remedy: obtain permit.

    May 2, 2018 · Penalty $1,600

    Resolve
  • Class - 1

    Tenant protection plan/not being comply with.noted:tenant protection plan not being comply with excessive dust in common hallways on all flrs in a occupied building during renovations.rem:comply with code.

    May 2, 2018 · Penalty $2,500

    Active
  • Class - 2

    Electrical work without permit. observed at 10am temp wiring installed throughout building. no application on file for temp wiring application m393947 does not cover temp wiring. rem: obtain permit.

    May 2, 2018 · Penalty $500

    Resolve
  • Class - 1

    Ec 250.4 non carrying electrical conductive material is not grounded.sidewalk shed is metal & could be energised.rem:comply w/ec code.

    May 2, 2018

    Resolve
Show 17 more ↓
  • Class - 2

    Fail to provide effective electrical continuity for metal raceways enclosures cable armor. lighting raceway in sidewalk shed not continuous.rem:provide effectice electrical continuity.

    May 2, 2018 · Penalty $600

    Resolve
  • Class - 2

    Unsafe unsuitable unapproved electrical equipment devices apparatus appliances materials or wiring in use,sj cord used from outside light tosidewalk shed for lighting.rem:comply w/ec code.

    May 2, 2018

    Resolve
  • Class - 2

    Failure to post or property post permit.for work @premises.noted :@time of insp approved plans @jobsite for appl/job (filed) 121985771.no permit posted @jobsite.permit approved by dob.rem:post/properly post per

    Mar 5, 2018 · Penalty $830

    Active
  • Class - 1

    97x17-the only elevator in bldg out of service. upon inspection the d evice is found tob e out of service creating a hazardous condition as per 14cny 11-02.rmdy: restore to service imediatley and notify nycdob

    Sep 12, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    B254,50,50b,50,50d,27a,50e,50f. federal f.t.f.b. lp steam blk, hs129safe oil fd; 50a-recent welded repairs not documented. provide dob withr-1 report. 50b-evidence of multiple fire flue pipe; 50d-no insulation

    Mar 22, 2017 · Penalty $250

    Resolve
  • Class - 1

    B101 as per class 1 (b101) 28-105.1 failure to obtain a permit for in stallation of new chinney; acquire permit and submit a certificate of correction.

    Mar 17, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    1. do not operate boiler until all hazardous conditions are immediately corrected and dob is notified to reinspecto lift cease use order. call 212-393-2784; 212-393-2694.

    Jan 24, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    New carlin 601 crd installed w/o building dept permit. fb or laa new oil burner.

    Dec 5, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    51,15,26,32a,34b,50,50a,50b. 51-fresh air fan to boiler room defectiveincorrect flue material, boiler safety valve defetive, flue tube door gasket and tube door housing gasket,incorret chimney liner material an

    Dec 5, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    05r10,57b11,40s04,97x10,41w06. 05r10-zone lock illegally deactivated,repair to proper working condition; 57b11-fire extinguisher expired and has no charge,replace; 40s04-holes in motor room wall above door,pat

    Aug 3, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    B154,3c,3d. b154 failure to maintain boiler. boiler is disconnected from chimney 3c flue pipe is collapsed 3d flue and chimnney are clogged 50 boiler was sealed on 3/23/2015 ecb #32074953. ()j eal was never lif

    Nov 17, 2015 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to comply w/commissioner's order to file a certificate of correction w/dob for nov #35153699h issued on 3/27/15 pursuant to 28-204.4and 1rcny 102-01. failure to provide unobstructed exit passageway at

    May 15, 2015 · Penalty $2,000

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passage way.defects noted:(1)tradstept are missing @ rear fire escape @ 3rd fl stair(2)fire escape leaving is sagging @ 1st fl rear(3)plywood reading"no exit"signage broken

    Mar 27, 2015 · Penalty $6,000

    Active
  • Class - 1

    50a,3b,51,50b,50c. 50a-defective chimney on roof level bricks removed and caused debris to fall down chimney causing a blockage; 50c-boiler needs cleaning carbon buildup; 50b-fuel oil spill near fuel tank; 51

    Mar 23, 2015 · Penalty $2,500

    Resolve
  • Class - 2

    42n11,99b07,40b07,68b07,41d06,42n11-ac fme by passed replace,99b07-catone tag insufficent provide,40b07-fire extinguisher empty provide 68b07-maintaince control log insufficent provide 41d06-motor room door uns

    Jan 12, 2015 · Penalty $500

    Resolve
  • Class - 1

    76m07 missing plank switch,provide as per k3.amber elevator inspectioninc (license #560001) submitted an affirmation of correction (elv 29) for the category 1 of 2010 on september 25,2013.an inspection conduct

    Dec 16, 2013 · Penalty $4,800

    Resolve
  • Hazardous

    Use or installation of plumbing materials or equipment which do not comply w/rs-16. location: 1st fl restaurant famous curry & kabob. observed non-complying fexible gas connectors on commercial cooking equipmen

    Apr 17, 2006 · Penalty $400

    Resolve

Complaints

  • General

    Ventilation system

    Apr 28, 2021 · Apt FLOOR4

    Close
  • Heat/hot water

    Entire building

    Apr 28, 2021 · Apt FLOOR4

    Close
  • Plumbing

    Water supply

    Apr 28, 2021 · Apt FLOOR4

    Close
  • Plumbing

    Water supply

    Apr 28, 2021 · Apt FLOOR4

    Close
  • Unsanitary condition

    Pests

    Apr 28, 2021 · Apt FLOOR4

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 28, 2021 · Apt FLOOR4

    Close
  • General

    Bell/buzzer/intercom

    Apr 28, 2021 · Apt FLOOR4

    Close
  • Plumbing

    Water supply

    Apr 28, 2021 · Apt FLOOR4

    Close
  • Plumbing

    Water supply

    Apr 28, 2021 · Apt FLOOR4

    Close
  • General

    Mailbox

    Apr 28, 2021 · Apt FLOOR4

    Close
Show 40 more ↓
  • Plumbing

    Water supply

    Apr 28, 2021 · Apt FLOOR4

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 28, 2021 · Apt FLOOR4

    Close
  • Heat/hot water

    Entire building

    Apr 28, 2021 · Apt FLOOR4

    Close
  • Heat/hot water

    Entire building

    Apr 28, 2021 · Apt FLOOR4

    Close
  • General

    Mailbox

    Apr 17, 2021 · Apt FLOOR4

    Close
  • General

    Bell/buzzer/intercom

    Apr 17, 2021 · Apt FLOOR4

    Close
  • Plumbing

    Water supply

    Apr 17, 2021 · Apt FLOOR4

    Close
  • Heat/hot water

    Entire building

    Apr 17, 2021 · Apt FLOOR4

    Close
  • Heat/hot water

    Entire building

    Apr 17, 2021 · Apt BLDG

    Close
  • General

    Signage missing

    Apr 17, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 17, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 16, 2021 · Apt FLOOR4

    Close
  • Plumbing

    Water supply

    Apr 16, 2021 · Apt FLOOR4

    Close
  • General

    Bell/buzzer/intercom

    Apr 16, 2021 · Apt FLOOR4

    Close
  • Plumbing

    Water supply

    Apr 16, 2021 · Apt FLOOR4

    Close
  • General

    Mailbox

    Apr 16, 2021 · Apt FLOOR4

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 14, 2021 · Apt FLOOR4

    Close
  • Plumbing

    Water supply

    Apr 14, 2021 · Apt FLOOR4

    Close
  • Heat/hot water

    Entire building

    Apr 14, 2021 · Apt FLOOR4

    Close
  • Plumbing

    Water supply

    Apr 10, 2021 · Apt 4

    Close
  • General

    Bell/buzzer/intercom

    Apr 10, 2021 · Apt 4

    Close
  • Paint/plaster

    Wall

    Apr 9, 2021 · Apt FLOOR4

    Close
  • Unsanitary condition

    Sewage

    Apr 9, 2021 · Apt FLOOR4

    Close
  • Unsanitary condition

    Pests

    Apr 9, 2021 · Apt FLOOR4

    Close
  • Plumbing

    Water supply

    Apr 9, 2021 · Apt FLOOR4

    Close
  • Plumbing

    Water supply

    Apr 9, 2021 · Apt FLOOR4

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 9, 2021 · Apt FLOOR4

    Close
  • General

    Ventilation system

    Apr 9, 2021 · Apt FLOOR4

    Close
  • General

    Mailbox

    Apr 9, 2021 · Apt FLOOR4

    Close
  • General

    Bell/buzzer/intercom

    Apr 9, 2021 · Apt FLOOR4

    Close
  • Elevator

    Maintenance

    Apr 9, 2021 · Apt FLOOR4

    Close
  • Electric

    Wiring

    Apr 9, 2021 · Apt FLOOR4

    Close
  • Electric

    Wiring

    Apr 9, 2021 · Apt FLOOR4

    Close
  • Electric

    Outlet/switch

    Apr 9, 2021 · Apt FLOOR4

    Close
  • Paint/plaster

    Ceiling

    Apr 9, 2021 · Apt FLOOR4

    Close
  • Flooring/stairs

    Floor

    Apr 9, 2021 · Apt FLOOR4

    Close
  • Door/window

    Door

    Apr 9, 2021 · Apt FLOOR4

    Close
  • Plumbing

    Water supply

    Apr 9, 2021 · Apt FLOOR4

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 9, 2021 · Apt FLOOR4

    Close
  • Heat/hot water

    Entire building

    Apr 7, 2021 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RC)
Year built
1925
Floors
8
Residential units
—
Building area
13,726 ft²
Lot area
2,160 ft²
Zoning
C5-2
Community board
105
Council district
4
Block / lot
861 / 7501
Assessed value
$1,472,400
Landmark / historic district
No

HPD registration #141882, last renewed Aug 30, 2025.

Questions about 15 East 31 Street

Who owns 15 East 31 Street?

The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.

Does 15 East 31 Street have violations?

Yes. NYC HPD has recorded 215 housing violations at this property.

Is 15 East 31 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 15 East 31 Street built?

City records list 1925 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.