16 East 23 Street
Manhattan, NY 10010BBL 1-00851-0061Map
Owner of record: 16 Madison Square Cor
16 East 23 Street is an elevator apartment building built in 1900 in Manhattan, 10010. It has 7 residential units across 6 floors. The owner of record is 16 Madison Square Cor. HPD has recorded 11 housing violations here, most recently on March 29, 2026. 8 of the 11 most recent violations are still open.
- HPD violations
- 11
- DOB violations
- 35
- ECB violations
- 18
- HPD complaints
- 3
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 11
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Mar 29, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt ph, 8th story, 1st apartment from north at east
Mar 29, 2026 · Apt PH
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt ph, 8th story, 1st apartment from north at east
Mar 29, 2026 · Apt PH
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Mar 29, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 7f, 7th story, 1st apartment from west at north
Mar 29, 2026 · Apt 7F
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Mar 29, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing
Mar 29, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7f, 7th story, 1st apartment from west at north
Mar 29, 2026 · Apt 7F
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum required 100 watts (light fixture present) at front areaway, 1st story
Sep 14, 2017
Open — Nov sent out
Show 1 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2015
Closed — Violation dismissed
DOB building violations · 35
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 26, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 17, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 17, 2015
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 8, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 11, 2014
Dob violation - resolved - Facade facade optional
Cycle 7 unsafe report filed
Jul 2, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed
Show 25 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
May 31, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 22, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 14, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 25, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 17, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 20, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2006
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 21, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 16, 2003
Dob violation - resolved - Elevator elevatorrequired
1p4360
Nov 6, 2002
Dob violation - resolved - Elevator elevatorrequired
1p4360
Nov 13, 2000
Dob violation - resolved - Elevator elevatorrequired
1p4360
Mar 9, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 1990
Dob violation - resolved - Elevator elevatorrequired
(45) clean pit of all papers debri (fire hazard)
Nov 21, 1988
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 3, 1988
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 3, 1988
Dob violation - resolved
ECB violations · 18
- Class - 1
Provide to install firefighter's service operation. firefighters' service operation is required by a17.1 section 2.27.3, and enforced through building and fire codes ibc/ifc. through nyc building code appendix
Apr 30, 2026 · Penalty $6,250
Active - Class - 2
In car phone not working. emergency stop switch damaged replace.
Apr 14, 2021 · Penalty $625
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation#35024579m issued on 7/14/2014,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).rem:file a certificat
Jun 29, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#802369. remedy:submit acceptable requir
Feb 13, 2020 · Penalty $3,125
Resolve - Class - 2
Failure to maintain exterior bldg and appurtenances note: east elevation exp#2 broken sheet metal at parapet.west elevation exp#4. chimney spalling bricks with missing mortar.sheet metal/ductwork 1/2 hanging
Feb 13, 2017 · Penalty $530
Resolve - Class - 2
Removal of safety measure/sidewalk shed w/o dept's approval. note: at time of inspection bldg facade was still designated as unsafe,the amended facade report (tr6) received on 1-31-17, had not been accepted
Feb 13, 2017 · Penalty $830
Resolve - Class - 2
Failure to file acceptable amended report indicating correction of unsafe conditions described in initial local law 11/98 report. agg1 priornov 36026461m under 28-302.5. rmdy: file acceptable amended report.
Nov 7, 2016 · Penalty $2,000
Resolve - Class - 2
Sec. 28-105.1 working w/o sidewalk shed permit. permit expired & exporation date 8/5/16. remedy: renew permit as per rcny 203-04.
Sep 13, 2016 · Penalty $830
Resolve - Class - 2
Failure to file an acceptable amended cycle 7 report to this dept indicating correction of unsafe conditions described in initial local law fisp report. remedy: file an amended report following remedial repair
Nov 28, 2014 · Penalty $830
Resolve - Class - 1
Failure to take required actions to secure public safety=unsafe facadenoted: on 6/25/2014 the qew1 hired by the owner submitted on "notif ofunsafe cond / fisp3 form to the dept declaring the facade as "unsafe"
Jul 14, 2014 · Penalty $2,400
Resolve
Show 8 more ↓
- Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules & regulations
Nov 28, 2008 · Penalty $800
Resolve - Non-hazardous
Failure to extend exhaust duct to the roofand less then 10 to the roof and less then ten from adjacent building at rear approx 8' remedy conform to rs13-2342
Jun 12, 2002 · Penalty $2,500
Active - Hazardous
Failure to maintain at first floor ceiling west side no fire protection above kabob grill remedy provide fire protection
Jun 12, 2002 · Penalty $800
Active - Hazardous
Failure to maintain noted at first flor commercial space kabob king front of store left side ceiling exposed with no fire protection creating a hazardous condition to front apartment second floor remedy
May 1, 2002 · Penalty $2,500
Active - Non-hazardous
Work without a permit work noted at rear of building 1st floor a metalflue has been erected from sub cellar to 1st floor level remedy obtain permit or restore to prior legal condition
May 1, 2002 · Penalty $250
Resolve - Non-hazardous
Failure to maintain bldg. defect : the ventilation system doesn't work properly at the above location on 1st floor at time of inspection remedy: maintain ventilocation system and exhaust pipe
Dec 6, 2001 · Penalty $350
Active - Non-hazardous
46q03, 37g12, 35o02, 74m07, 74o02, 23b13, 25q12, 57o02, 09m12, 46q-install rope guards 37g-properl fuse controller 74m-provide fire extinguisher 23b-reshackle & tag 25q-replace door oprerator cover 57o
Aug 5, 1998 · Penalty $180
Resolve - Non-hazardous
36p provide accewss to motor room & all floors for a complete inspection by this department
Mar 14, 1994
Resolve
Complaints
- Heat/hot water
Entire building
Mar 27, 2026 · Apt RESTAU
Close - Heat/hot water
Entire building
Mar 14, 2022 · Apt 2N
Close - Appliance
Sprinker cert
Jul 26, 2004
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D0)
- Year built
- 1900
- Floors
- 6
- Residential units
- 7
- Building area
- 13,837 ft²
- Lot area
- 2,452 ft²
- Zoning
- C6-4M
- Community board
- 105
- Council district
- 2
- Block / lot
- 851 / 61
- Assessed value
- $5,144,400
- Landmark / historic district
- No
HPD registration #139886, last renewed Sep 6, 2025.
Questions about 16 East 23 Street
Who owns 16 East 23 Street?
The owner of record in NYC Department of City Planning PLUTO data is 16 Madison Square Cor.
Does 16 East 23 Street have violations?
Yes. NYC HPD has recorded 11 housing violations at this property.
Is 16 East 23 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 16 East 23 Street built?
City records list 1900 as the year it was built.
How many apartments are in 16 East 23 Street?
It has 7 residential units and 8 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.