18 East 23 Street
Manhattan, NY 10010BBL 1-00851-0060Map
Owner of record: Sunny K Realty Ltd.
18 East 23 Street is a walk-up apartment building built in 1900 in Manhattan, 10010. It has 16 residential units across 5 floors. The owner of record is Sunny K Realty Ltd.. HPD has recorded 5 housing violations here, most recently on April 18, 2019. 2 of the 5 most recent violations are still open.
- HPD violations
- 5
- DOB violations
- 6
- ECB violations
- 3
- HPD complaints
- 20
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 5
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south and east wall in the 2nd room from north located at apt 3c, 4th story, 2nd apartment from north at east
Apr 18, 2019 · Apt 3C
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Apr 10, 2019
Open — Not complied with - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 5, 2018
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum required 100 watts (light fixture present) at front areaway, 1st story
Sep 14, 2017
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective gaps between wood base & floor at walls south room 4 sty 2 from south at east duplex apt 4c 1 level , section '' ''
May 20, 1996 · Apt 4C
Closed — Violation dismissed
DOB building violations · 6
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 3
- Class - 3
Work does not conform to approved construction documents &/or approvedamendments for this dir 14 job #121119869 dwg;6/26/12. noted:at groundflr facade/storefront plan proposes sign installed on wall sign instal
Aug 14, 2012 · Penalty $200
Resolve - Non-hazardous
Piping and/or equipment installed improperly. remedy: install piping and or equipment properly. location : that chimeny for hot water heater terminetes at ground level above awning for store. next a window.
Jan 2, 2003
Resolve - Non-hazardous
Failure to maintain plumbing and/or appurtenances - hazardous (flue inducer not working reprir or replace) (for hot water heater). remedy:maintain plumbing and/or appurtenances.
May 25, 1999 · Penalty $800
Resolve
Complaints
- Plumbing
Water supply
Oct 22, 2019 · Apt BLDG
Close - Plumbing
Water supply
Oct 7, 2019 · Apt 4C
Close - Plumbing
Water supply
Sep 18, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 18, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 18, 2019 · Apt BLDG
Close - Water leak
Heavy flow
Apr 8, 2019 · Apt 3C
Close - Plumbing
Water-leaks
Apr 22, 2010 · Apt 4D
Close - Paint/plaster
Ceiling
Sep 8, 2009 · Apt 4D
Close - Plumbing
Water-leaks
Sep 8, 2009 · Apt 4D
Close - Paint/plaster
Ceiling
Aug 4, 2009 · Apt 4D
Close
Show 10 more ↓
- Plumbing
Water-leaks
Aug 4, 2009 · Apt 4D
Close - Plumbing
Water-leaks
Jul 31, 2009 · Apt 4D
Close - Heating
Heat related
Dec 6, 2007 · Apt 4D
Close - Heating
Heat related
Dec 5, 2007 · Apt 4D
Close - Electric
Wiring
Dec 5, 2007 · Apt 4D
Close - Plumbing
Water supply
Feb 19, 2007 · Apt 4D
Close - Plumbing
Water supply
Feb 19, 2007 · Apt 4D
Close - Heating
Heat related
Jan 21, 2007 · Apt 4D
Close - Appliance
Sprinker cert
Jul 26, 2004
Close - Heating
Heat related
Jan 10, 2004 · Apt 3C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1900
- Floors
- 5
- Residential units
- 16
- Building area
- 10,889 ft²
- Lot area
- 2,469 ft²
- Zoning
- C6-4M
- Community board
- 105
- Council district
- 2
- Block / lot
- 851 / 60
- Assessed value
- $2,246,400
- Landmark / historic district
- No
HPD registration #139308, last renewed Oct 7, 2025.
Questions about 18 East 23 Street
Who owns 18 East 23 Street?
The owner of record in NYC Department of City Planning PLUTO data is Sunny K Realty Ltd..
Does 18 East 23 Street have violations?
Yes. NYC HPD has recorded 5 housing violations at this property.
Is 18 East 23 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 18 East 23 Street built?
City records list 1900 as the year it was built.
How many apartments are in 18 East 23 Street?
It has 16 residential units and 17 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.