1430 Broadway
Manhattan, NY 10018BBL 1-00815-0046Map
Owner of record: Realties 1430
1430 Broadway is an office building built in 1954 in Manhattan, 10018. The owner of record is Realties 1430. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 140
- ECB violations
- 42
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 140
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 26, 2024
Dob violation - dismissed - Construction other optional
Observed 2-exterior marble panel approx. size 4'-0" x 10'-0" each dislodged, building popped-out and loose on 3rd floor level at the corner of expo # 01 & 02. bulging loose panels are hanging over mta subway entrance at w 40 street and potential falling condition.
Sep 26, 2024
Dob violation - active - Immediate emergency anythingoptional
Provide apprx 40 linear feet of construction fence @ expo#2 (west 40 s treet) to extend to the curb line & apprx 30 linear feet of constructi on fence @ expo#1 (broadway) to extend to the curb line in an l shape to safeguard public and property
Sep 26, 2024
Dob violation - active - Construction other optional
Failure to maintain facade & appurtenances. marble cladding failure @3 fl, exp2, n elev. remedy:the owner to retain service of nys reg design prof with qewi certificate & marble works experience to inspect & eval 100% on all facade-marble stones cladding works @ all elevs. provide report [email protected] no later than 10/10/2024
Sep 26, 2024
Dob violation - active - Construction other optional
Emergency work.at the exp 1/2 corner,there were 4marble panels w/a 24 outwrd bulge@exp side on 3rd stry.also at exp 1/2crnr,2marble panels had a 1/2 outwrd bykge@exp 1 side on 3rd&4thfl lvl.1.immed instll constrctn fence to enclosre 15min of sdwalk @exp1&exp2 for dstnce of 30''alng exp1&40'alng exp2 to srrnd
Sep 26, 2024
Dob violation - active - Construction other optional
Emergency work.@the exp1/2 crnr,there was 4marble panels w/2" outwrd blge@exp2 side on 3rd stry.also@exp 1/2crnr, marble panels had a 1/2 outwrd blge@exp1 side on 3rd&4thfl levels.1.immed instllshrng&bracng & rmve bulgd marble claddng@dirctn of pe,2.all wrk to be drctly sprvsd& drctd by onsite nyspe
Sep 26, 2024
Dob violation - active - Construction other optional
Emergency wrk.theres 1/2"thck marble claddng@exp1/2crnr up to the 16th stry&also@exp 2/3(northeast)crnr,4marble panels had apprx2"outwrd bulge@exp2 side on 3rdstry.also@exp 1/2crnr,2marble panels.1.immed instll heavy duty sdwalk shed along ent frntge on exp1 &exp2,2.cmplt emrgncy stbilizatn wrk prior to instll@exp1/2
Sep 26, 2024
Dob violation - active - Construction other optional
Failure to maintain.there's 1 1/2"thick marble cladding at the exp 1/2 crnr up to 16th stry&also @exp2/3 northeast&exp1/2(southwest)crnrs.@ exp1/2(northwest)crnr,4marble panels had apprx 2"outwrd.1.nyspe qewi to immed eval the marble claddng&dsgn rpairs,2.file for prmts by 12/2/243.obtn prmts&strt wrk by 12/16/24
Sep 26, 2024
Dob violation - active - Failure to correct swarmp conditions (facade) facade required
Cycle 9a failure to correct swarmp conditions
Feb 21, 2022
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 22, 2021
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jul 20, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 20, 2020
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 1, 2018
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 5, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 5, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 5, 2017
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 5, 2017
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 9, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 9, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 9, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 9, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 9, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 9, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 9, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 9, 2016
Dob violation - resolved
ECB violations · 42
- Class - 2
Observed jobsite w/out suspended scaffolding installed as per notification 2605. spoke with building personnel who informed installation has yet commenced. notification made expired 9-18-2025, no notification w
Nov 1, 2025
Resolve - Class - 1
Observed 2-exterior marble panel approx. size 4'-0" x 10'-0" each dislodged, building popped-out and loose on 3rd floor level at the corner of expo # 01 & 02. bulging loose panels are hanging over mta subway en
Sep 26, 2024
Resolve - Class - 2
Removal of sidewalk shed without dob approval.note at time of inspection building facade was still designated as unsafe and the amended facade report(tr6)had not been accepted.however,safety measures had alread
Sep 24, 2022 · Penalty $1,250
Active - Class - 2
Lighting under sidewalk shed not in operating condition.provide lighting dusk-dawn
Jul 1, 2022
Resolve - Class - 2
Sidewalk shed was not extend to the adjoining property the 20 feet as for code at expo#2. stop all facade operation comply with code
May 19, 2022 · Penalty $2,400
Resolve - Class - 1
Failure to take and provide safety measures sidewalk shed,netting etc,where required to secure and protect public safety from documented unsafe facade the tr6 tecnhnical report received from pa/pe on 02/16/2022
Apr 26, 2022 · Penalty $10,000
Active - Class - 2
A.c.27-929.1,failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional in an office building 100 feet or more i
Mar 30, 2021
Resolve - Class - 2
A.c. 27-929.1, failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by july 1, 2019, in an office buildin
Nov 15, 2019 · Penalty $1,250
Active - Class - 1
5a10.cid 5-a-10.door restrictor has been altered and rendered inoperable this is a safety device to ensure passengers safety.repair the restrictor and notify the dob @ [email protected] 121239334 to restore
Jun 28, 2018 · Penalty $1,250
Resolve - Class - 2
99bb5,100b7. 99bb5-cat 1 tag expired; 100b7-demarcation lights inoperative.
Jun 11, 2018 · Penalty $625
Active
Show 32 more ↓
- Class - 2
90l10,87d6,96l10,96b6,90d6 (90l10)repair bottom run station cover could not be closed (87d6)secure top side panel wall both side base guard (96l10)repair top indication lights (96b6)properly secured city id tag
Aug 2, 2017 · Penalty $500
Active - Class - 1
Failure to provide adequate safety measures such as sidewalk shed fence etc to protect public form unsafe facades at east sections of exp2 (w 40 st) as per 1rcny 103-04 and as per notification of unsafe con
Jan 6, 2017 · Penalty $2,400
Resolve - Class - 2
Work does not conform to approved documents &/(on) approved amendments. noted: missing horizontal brace at 20ft wide sidewalk shed bay at exposure #2 (west 40dt). remedy: conform to approved documents or amendm
Jul 31, 2010
Resolve - Class - 2
56y13,59b01,02x10,40x10,60x10,60q03. 56- seal leak on machine. 57- property adjust brake. 02- alarm button not ringing alarm bell on car. 40- repair ventilation fan in mr. 60- replace defective light tubes on
Apr 20, 2010
Resolve - Class - 2
52o02,56o02. 52- clean ropes for proper inspection. 56- clean up ropeson machine & floor.
Apr 20, 2010
Resolve - Class - 2
02x10.02x10 alarm system inoperative on car staions 2
Jan 6, 2009
Resolve - Non-hazardous
75##/80h11/78m07/75x10 75# install guards and protect hand crank shaft80# step chain 78m- stop demarcation lighting 75x- stop button while cloning and sensors on stop bar (stop edge) cease use until item 75x is
Oct 4, 2005 · Penalty $1,250
Resolve - Non-hazardous
75l#/75##/77i11/78x10/80i11/80h11/83o02/83t07/84q03 cease use 75l-pro perly tag,identify handle of guard crack 75# install guards and protect guard crack shaft 77i-top 78x-make it to work at proper pressure 80i
Jun 1, 2005 · Penalty $500
Resolve - Non-hazardous
33#09 33- remove green field from rear of hoistway at 17th floor
May 25, 2004
Resolve - Non-hazardous
08,0,02 25,d,06 66,0,02, 16,m,07 08 all door track landing sills dirty on wall fl 16 m missing lobby door gibs
Jul 16, 2003
Resolve - Non-hazardous
51o02/64x07
Jul 14, 2003
Resolve - Non-hazardous
83m. return device # 1p4574 back to dismantle condition so that proper inspection can be made, or file for removal.
Jul 8, 2003
Resolve - Non-hazardous
10h11
Jul 3, 2003
Resolve - Non-hazardous
34d06 34-d-wires out of spice box -covert resecure .
Jul 2, 2003
Resolve - Non-hazardous
66b09/66b10 66-b-remove material in pit area (mop-bucket in pit,dust covers) 66-b-outlet in pit.hanging outside of box,resecure.
Jul 1, 2003
Resolve - Non-hazardous
51o02,34d06,41b#. 34-d- rescue top of car splice box. 41-b- selector noisy- lubricate.
Jun 30, 2003
Resolve - Non-hazardous
57o02,39b#. 39-b- remove fluorescent fixture from # 5 car-mg set.
Jun 30, 2003
Resolve - Hazardous
Failure to safeguard public and property effected by construction operations violation noted: at time of inspection workmen were engaged of the building excessive chippings and dust from repair work falls on th
Jun 6, 2003
Resolve - Hazardous
No design drawing for sidewalk available at construction site. violation noted: failure to provide design drawing for sidewalk bridge erected on the sidewalk north and west sides of building at 1430 broadway
Jun 6, 2003 · Penalty $500
Resolve - Hazardous
Sidewalk shed does not meet building code, violation noted: planking on sidewalk shed (north side on 40 th street) is not sealed tightly to prevent debris from falling on the public (2) in numerous area the sid
Jun 6, 2003 · Penalty $2,000
Resolve - Hazardous
Supervision and use of rigging equipment without a special rigger's license violation noted: 4 workmen operating two 2 point suspencion scaffold (one located on n. side @40th st the other on the west face of b
Jun 6, 2003 · Penalty $500
Resolve - Non-hazardous
46k12-replace rusted and undersized hoist ropes
Nov 13, 2001
Resolve - Non-hazardous
75b05-35o02-46k12-50o02-74b07-74i11-08v01. 75-b-05 tent tag expired perfom and file test 74-b-07 provide location of managers office and business 74-i-11 repair tio of car light 08-v-01 some floors are one of l
Jul 23, 2001
Resolve - Non-hazardous
73o02-53x11-74o02-74x11-46k12-75o02-75b05-74b07. 74-o-02 entire secondary is filtity properly clear secondary 74-x-11 repair secondary light 35-b-02 poor house keeping propely clear up machine room 75-b-05 five
Jul 23, 2001
Resolve - Non-hazardous
46k12. replace hoist cables.
Sep 2, 1997
Resolve - Non-hazardous
46k12. replace hoist cables.
Sep 2, 1997
Resolve - Unknown
Failure to provide durable material on elevator landing signs, i.e. 18th floor. remedy: provide signage as per code. local law 16/84.
Jun 1, 1995
Resolve - Non-hazardous
78-provide proper city id number.
Jan 10, 1995
Resolve - Non-hazardous
74-return to service so that a proper inspection can be made or file for dismantune or removal.
Jan 9, 1995
Resolve - Unknown
Occupancy contrary to that allowed by c of o. (vehicles). remedy: discontinue illefal use. ammend c of o if feasible.
Mar 16, 1990
Resolve - Non-hazardous
Failure to maintain exterior bldg wall defect is mable panel at facade of bldg 4 &5 panels up are cracked & bulgng northwest corner of bldg. remedy provide protection for pedistrians before making repairs
Dec 12, 1988
Resolve - Non-hazardous
Failure to maintain exterior bldg wall defect is marble panels at 3 sty facade north east corner of bldg is missing note 2 panesl approx 2x6x2 remedy provide heavy duty sidewalk shed revcace marble panels
Dec 12, 1988
Resolve
Complaints
- Heat/hot water
Entire building
Dec 19, 2019 · Apt BLDG
Close - Heating
Heat related
May 9, 2009 · Apt S1D
Close - Heating
Heat related
Jan 23, 2005 · Apt N2K
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O4)
- Year built
- 1954
- Floors
- 22
- Residential units
- —
- Building area
- 364,000 ft²
- Lot area
- 16,647 ft²
- Zoning
- C5-3
- Community board
- 105
- Council district
- 4
- Block / lot
- 815 / 46
- Assessed value
- $46,941,300
- Landmark / historic district
- No
Questions about 1430 Broadway
Who owns 1430 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Realties 1430.
Does 1430 Broadway have violations?
NYC HPD has no housing violations on record for this property.
Is 1430 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1430 Broadway built?
City records list 1954 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.