roofy

115 West 40 Street

Manhattan, NY 10018BBL 1-00993-0022Map

Owner of record: 114 W 41 Owner Bh LLC

115 West 40 Street is an office building built in 1915 in Manhattan, 10018. The owner of record is 114 W 41 Owner Bh LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
167
ECB violations
50
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 167

  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 external hgh pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 external hgh pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
Show 40 more ↓
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 internal high pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 external high pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 3, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 30, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 30, 2021

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 3, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 23, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 23, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 23, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 23, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 23, 2020

    Dob violation - resolved
  • High pressure boiler boiler required

    Failure to fail 2017 inspection

    Mar 16, 2020

    Dob violation - dismissed
  • High pressure boiler boiler required

    Failure to fail 2017 inspection

    Mar 16, 2020

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued - failure to file 2017 internal high pressure boiler inspection

    Mar 16, 2020

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued - failure to file 2017 external high pressure boiler inspection

    Mar 16, 2020

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jan 6, 2020

    Vp*-violation unserved ecb- dismissed
  • Sprinkler none

    Failed to file final sprinkler report by july 1, 2019

    Sep 3, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    Cease use

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    Cease use

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2019

    Dob violation - resolved
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Feb 19, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 18, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 29, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 29, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 29, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 29, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 29, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 29, 2017

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed

ECB violations · 50

  • Class - 2

    Failure to file acceptable amended cycle8c report indicating correction of unsafe conditions described in initial facades report required by28-302.5 for control#803020.file acceptable report

    Oct 8, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain.display on site documents required by bc chapter 33 note at the time of my inspection upon request for site specific safety orientation program for each employed worker in the jobsite none c

    May 3, 2021

    Resolve
  • Class - 1

    Failure to institute.maintain safety equipment measures or temporary construction (no guard rails) noted at the time of my inspection of an active jobsite upon inspection of the roof observed two bulkhead with

    May 3, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Work does not conform to apprpoved construction documents and/or amendments-cd5.at the time of inspection at a 22 story alt,i observed on the roof level outrigger beams scaffold and parapet clamps(tie-backs)not

    Jan 6, 2020 · Penalty $625

    Resolve
  • Class - 1

    Licensed rigger designated an unqualified foreman issued pursuant 28-207.2-no rigging foreman on job site. at the time of inspection at a 22story alt,i observed suspended scaffold in place and in use at expo 2.

    Jan 6, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Ac 27-929.1, failure to complete the installation of a full system of automatic sprinklers & file sprinkler report prepared by a registerd design professional by july 1, 2019, in an office building 100 feet or

    Nov 15, 2019

    Resolve
  • Class - 2

    01-b-10, 02-x-10, 13-x-10, 52-u-07, 53-u-07, 59-bb-05, 80-m-07, 70-o-02, 70-d-06, 40-o-02, 39-o-02, 42-b-07. (01) repair switch to ring alarm (02) repair in car alarm (13)repair emergency light(52) provide rope

    Aug 15, 2019

    Resolve
  • Class - 2

    Failure to maintain exterior building facade and appurtenances. *southelevton exp1 observed cracked deocrative terracotta stones between 3rdand 4th floors; *east elevation exp4, obseved spalled/cracked masonry

    Feb 11, 2019 · Penalty $625

    Resolve
  • Class - 2

    Failure to provide and take safety measures where required to secure and protect public safety from documented unsafe notification (fisp3) of building facade as per 1rcny 103-04. *fisp3 filed by pe/ra 2/5/19.

    Feb 11, 2019 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to file annual ceritification that cooling tower 1000002328 has been inspected, tested, & disinfected, & that a maintenance plan been developed & implemented, by nov. 1, 2016. remedy: file annual certif

    Jun 20, 2017 · Penalty $10,000

    Resolve
Show 40 more ↓
  • Class - 1

    3314.8 partial swo issued for supported scaffold pursuant 28-207.2 andposted on premises.failed to provide toeboards,guardrails and endrailsnoted:at time of inspection supported scaffold that installed at the

    Dec 9, 2014 · Penalty $1,600

    Resolve
  • Class - 2

    Work w/o a permit. work noted - at roof level, approx 40'-0 long x 12'-0 wide x 3'-0 in height - wooden deck has been constructed w/fixed wooden (banches), tables & flower pots. all construction done w/o first

    Jul 11, 2012 · Penalty $400

    Resolve
  • Class - 2

    76i11,72##. 76-tail rope kinked in serveral locations replace. 72-pit stop switches for #7 & #8 car are located in this car's relocate than to their respective pits.

    Oct 26, 2011

    Resolve
  • Class - 2

    Fail to file an architect/engineer report certifying exit/directional signs are connectedd to emergency power source/storage battery equipment. remedy: file architect/engineer report.

    Jan 27, 2010

    Resolve
  • Class - 2

    100b# 100b# fixture to post permit no elevator no elevator permit posted on side post permit

    Oct 15, 2009

    Resolve
  • Class - 1

    100b# 100b# failure to post permit no elevator permit posted on site post permit

    Oct 15, 2009

    Resolve
  • Class - 2

    97m# 97m# entire device removed work w/o permit file and obtain permit

    Oct 15, 2009

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner improper exit/exit access doorun arrangement as per bc1014.2, 27-36 at 1st flr. comm. exi t passageway 1 36th door way at this time below min.requirement.remedy

    Sep 12, 2009 · Penalty $1,200

    Resolve
  • Non-hazardous

    The storage & use of all volatile,flammable,combustible,compressed gases.upon inspection 2 acetelyne & oxygen cylinders are stored on the 19fl,no fdny permit for storage & use on job site.remedy:remove all cyli

    Sep 17, 2007 · Penalty $800

    Resolve
  • Non-hazardous

    Plumbing work w/o a permit.upon inspection plumbing lines of existing bathrooms have been altered w/o a dob permit.this condition is noted on floors 3 thru 8 & 19fl.remedy:stop all plumbing work.obtain permit

    Sep 17, 2007 · Penalty $800

    Resolve
  • Non-hazardous

    21l11,07l11,55q03,42#07,56#07. 21- hall buttons broken/missing basement and lobby levels. 07-door reopening button broken (car station)55- lighting room is unguarded. 42- governor electiral switch wiring box i

    Feb 28, 2003

    Resolve
  • Non-hazardous

    37d09/19m07/16b11/39x11. 37 remove sprinkler piping from motor room. 19 install missing lock covers. 16 provide hoist doors to self close. 80 eliminate toe guard hitting door enclosure at basmt. 39 provide auto

    Jan 10, 2003

    Resolve
  • Non-hazardous

    37d09/ 39b07/ 31d07/ 11h11/ 80b11/ 37 - remove all obselete, unused equipment from motor room grating 39 - finish wiring at rear of buard 32 - seal permangntly door above lobby down & replace missing guard

    Jan 7, 2003

    Resolve
  • Non-hazardous

    15b07/ 42b07/ 22l11/ 16m07/ 15 - repair cert. frame & use cert. or location sign within ( no copies ) 42 - free gov. stem & remove from moving pares 02 - repair h.p.i. in lobby ( to be visable ) 16 - instal

    Jan 7, 2003

    Resolve
  • Hazardous

    42l11. repair worn gov free up stem remove tags from moving parts cease use until gov is repaired and dob (212-566-5539) is notified & gov is tested.

    Jan 6, 2003 · Penalty $500

    Resolve
  • Non-hazardous

    42b11-21m07-15b07-39b11. 42-repair building gov stem remove gov tags throm moving parts 21-install floor marking tag at all floors 15-repair sert frame & use cert or lcoation sign within (no codies) 39-elimina

    Jan 6, 2003

    Resolve
  • Non-hazardous

    42d09-03e11-03f11-22x11-21m07-15b07-42b11. 42 - remove gov. tags from moving parts 03e-f - eliminate jumping of car in flight. 22 - repair car position indicator. 21 - install floor marking mgr at all floors.

    Jan 6, 2003

    Resolve
  • Hazardous

    06l11. inspection reveal device is able to run with both gates open clase use. call dept of building before restoring back to service 646 248 8738.

    May 28, 2002 · Penalty $500

    Resolve
  • Non-hazardous

    07m07-11q03-35p17-57o02-02x11-74o02 (74-0-02) clean top of car.

    Apr 2, 2001

    Resolve
  • Non-hazardous

    Operation of a place of assembly without a current permit. noted: an eating & drinking establishment is doing business as "giggles" on the first floor & mezzinine of said premises without a valid pa permit.

    Apr 27, 2000

    Resolve
  • Hazardous

    Failure to maintain bldg. noted: 2 emergency lights are not working in the first fl. drinking establishment which are located (1) is in the center of space on the mezzanine level (2)is in the rear of same.

    Apr 27, 2000

    Resolve
  • Non-hazardous

    50y14,31q03,07x11,74y02,46q03,11q03,22m07,36w06, 74)top car 22)as per code.

    Mar 14, 2000

    Resolve
  • Non-hazardous

    57o2,57w6,74o2,2x11,3x11,30h7,4m7,74x11,31q3.74)topcar.3)emergency communication.30)key.4)key so that elec switch can be tested.74)work light.

    Mar 13, 2000

    Resolve
  • Non-hazardous

    46h10,64q3,30p17,74x11,4m7,31q3.30)key.74)work light.4)key.

    Mar 13, 2000

    Resolve
  • Non-hazardous

    46h10,4m7,30p17,64q3,57o2,31q3,74x11.4)key.30)key.74)lights.

    Mar 13, 2000

    Resolve
  • Non-hazardous

    74x11,4m7,30p17,31q3,30i11.74)work light.4)key.30)key.30)walls.

    Mar 13, 2000

    Resolve
  • Non-hazardous

    74x11,31q3,30i11,30p17,4m7,57o2.74)work light.30)wall loose plaster.30)key.4)key.

    Mar 13, 2000

    Resolve
  • Non-hazardous

    57o02,74o2,3x11,73m7,1x11,20l10,18q3,11b7,11q3,31q3,30##.74 cartop,3 annunciator.73 fire service 1 alarm as per code.30 beve all ledge as per code.

    Mar 13, 2000

    Resolve
  • Non-hazardous

    57o2,74x11,18q3,74o2,3x11,73m7,1x11,11q3,22d6,20l10,31q3.74)work light.74)cartop.3)annunciator.73)fire service.1)alarm as per code.

    Mar 13, 2000

    Resolve
  • Non-hazardous

    4m7,2x11,3x11,74o2,57o2,57b7,30p7,31q3,74x11,15#6.4)key so that elec switch can be tested.3)emergency communication.74)top car.57)light.30)access key.74)wash light.15)as per code between 1st & 2nd landing.

    Mar 13, 2000

    Resolve
  • Non-hazardous

    Installation of mechanical equipment 30 ton a/c unit second floor areaformer tenant weil wood industries. remedy: obtain equipment use permit for said a/c unit.

    Jan 19, 2000

    Resolve
  • Non-hazardous

    75m74o40t40b35y50y57o11q53b22d02l14l57t55l74x03a 75-perform test by device and fiel e.l.e.v. 3 form 74-form 74 secondary governor room 40-room door i.d, 40 room light, 57-door i.d. 74 annunciator 05-capacity.

    May 22, 1998

    Resolve
  • Non-hazardous

    Work without a permit work noted entire third fl has interrior pemolition of partiition and are in framing stage of erecting new walls and partitions remedy stop all work until you obtain approval and permit

    Mar 12, 1998 · Penalty $250

    Resolve
  • Non-hazardous

    74-provide permanent cover for opening in motor room flr. between contcontrolle and main machine . 74a-properly sercure partition under motor room step. 74b-file for new car door& hange and gate switch.

    Jan 18, 1995

    Resolve
  • Hazardous

    Failure to maintain exterior building defect is piece of ornamental stone has fallen on to sidewalk location between 4&5fl s/w corner building facade-note temp police barricade provide at time shed or protect

    Nov 7, 1994 · Penalty $800

    Resolve
  • Non-hazardous

    73t,74l,74l,52l,74a#, 73. perform 5 yr test date and tag governor and file elevator 3 form with this department. 74. repair or replace car handle. 74a.provide proper clearance between the cwt & the buffer

    Apr 6, 1992 · Penalty $150

    Resolve
  • Non-hazardous

    39h,96l

    Jan 30, 1991 · Penalty $150

    Resolve
  • Non-hazardous

    46k

    Jan 30, 1991 · Penalty $150

    Resolve
  • Non-hazardous

    39l,46h,57o,60h,02x,(73)renew saddle in cab (74)provide communication outside.

    Jan 30, 1990 · Penalty $150

    Resolve
  • Non-hazardous

    Work without a permit work noted having erected partitions walls and drop ceiling throughout 16 floor to create offices work area and lounge space. remedy obtain a permit and approval from this department if fe

    Jan 19, 1989 · Penalty $250

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

DatePriceTypeUnits
Nov 25, 2025$133,000,000Office buildings79

Building details

Building type
Office building (O4)
Year built
1915
Floors
22
Residential units
—
Building area
304,345 ft²
Lot area
13,800 ft²
Zoning
C5-2.5
Community board
105
Council district
4
Block / lot
993 / 22
Assessed value
$50,228,550
Landmark / historic district
No

Questions about 115 West 40 Street

Who owns 115 West 40 Street?

The owner of record in NYC Department of City Planning PLUTO data is 114 W 41 Owner Bh LLC.

Does 115 West 40 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 115 West 40 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 115 West 40 Street built?

City records list 1915 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.