roofy

310 West 40 Street

Manhattan, NY 10018BBL 1-00763-0047Map

Owner of record: Unavailable Owner

310 West 40 Street is a hotel built in 2015 in Manhattan, 10018. The owner of record is Unavailable Owner. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
31
ECB violations
42
HPD complaints
1

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 31

  • Construction other optional

    Structure rendered non-compliant due to fire . premises is vacant land where the fire started. the address is 308 w 40 street manhattan affecting 310 w 40 street exposure #2 stucco wall. combustible debris accumulated and the construction fence at 308 w 40 street has caught on fire.

    Nov 15, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2021

    Dob violation - resolved
Show 21 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2021

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 13, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 13, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 13, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 11, 2020

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 10, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 10, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 10, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 27, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 13, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 30, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 30, 2015

    Dob violation - dismissed
  • Construction other optional

    42-story concrete structure formwork failure allowed the exposure #4 wall to compromise the required bldg separation between it and the nei ghboring structure. concrete on exp #4 wall to be removed as per wsp sketches and repaired. report of work to be reviewed prior to finishin g/sealing wall, by 1/29/16

    Dec 2, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 21, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 21, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 11, 2015

    Dob violation - dismissed

ECB violations · 42

  • Class - 1

    Bc3301.1.no hard hat.at time of my inspection of new building under construction building at rooftop/bulkhead level and active jobsite.i observed worker at the 1st floor no wearing hardhats.hardhats must be wor

    May 10, 2018 · Penalty $250

    Resolve
  • Class - 2

    Bc3307.2.1.expired dot permit.at the time of my inspection of new building under construction active job site at rooftop bulkhead level.i observed mutiple barriers occupying roadway at exposure 1.upon review of

    May 10, 2018 · Penalty $625

    Resolve
  • Class - 1

    Bc3303.11(3).stairway.at the time of my inspection of new building under construction.active job site at rooftop/bulkhead level.i observed at stairways a+b at various locations throughout job site construction

    May 10, 2018 · Penalty $250

    Resolve
  • Class - 1

    Unsafe storage combustible equipment.at the time of my inspection of new building under construction active jobsite.at the roof top/bulkheadlevel. i observed at the 10th floor hallway tank of flammable gas on t

    May 10, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    3301.2.failure to maintain egress.@ time of inspection of new 42 storybuilding.building topped off & fully enclosed with windows installed.iobserved on 40th sty egress blocked by construction material & tools.t

    Mar 26, 2018 · Penalty $625

    Resolve
  • Class - 1

    Bc3303.4.1.1 cracked sidewalk. at time of inspection of new 42 story building active jobsite. building topped off and fully enclosed with winows installed. i observed that in front of jobsite sidewalk was cra

    Mar 26, 2018 · Penalty $625

    Resolve
  • Class - 1

    Guardrail (inadequate,missing) @time of inso of new 42 sty bldg on active jobsite.bldg topped off w/windows fully installed.active const going on inside.i observed on 4th sty balcony inadequate guardrails.impro

    Mar 26, 2018 · Penalty $2,400

    Resolve
  • Class - 1

    Bc 3308.5 vertical safety netting.@time of insp of new 42 sty bldg on active jobsite.bldg topped off & fully enclosed w/windows installed.i observed on 4th sty balcony inadequate vertical netting w/large gaps.f

    Mar 26, 2018 · Penalty $625

    Resolve
  • Class - 2

    3301.1.2.fire code(exit signs).@ time of inspection of 42 story new building.active jobsite with building topped off & fully enclosed with windows installed.i observed missing exit signs throughout bulding @ st

    Mar 26, 2018 · Penalty $625

    Resolve
  • Class - 2

    Bc3303.7.2.fire extinguishers.at time of inspection of new building under construction-building at the rooftop.bulkhead level i observed fire extinguishers on multiple floors at stariways a+b not mounted on hoo

    Mar 14, 2018 · Penalty $250

    Resolve
Show 32 more ↓
  • Class - 1

    Egress.at time of inspection of new building under construction-building at the rooftop bulkhead level,i observed 2 baker scaffolds with plywood board laid across platforms being used as overhead protection.wor

    Mar 14, 2018 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperations.noted: at 42 story new bldg under construction, while responding to complaint. found concrete splatter and grout materials on car

    Sep 23, 2016

    Resolve
  • Class - 1

    Failure to promptly notify the dept of an accident or damage to adjoing property at construction/demolition site.at time of inspection,whileresponding to complaint 1433614 of grout falling from site,ont car bel

    Sep 23, 2016

    Resolve
  • Class - 1

    Work does not conform to approved construction documents.@ the time ofinspection of the new 42 story bldg under construction i observed @ exp1 & 4 inside the formwork climbing system,material & large tool boxes

    May 12, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    Bc3308.2 work w/o a permit installation & use of climbing formwork.@ the time of my inspection of the new 42 story bldg under construction 11am,i observed on the 37th fl formwork deck @ exp2 & 4 a formwork clim

    May 12, 2016 · Penalty $800

    Resolve
  • Class - 1

    Failure to institute guard rails.@ the time of inspection of the new 42 story bldg under construction,i observed @ stairwell b missing guardrails to the left hand side of the stairs where persons can easily mis

    May 12, 2016 · Penalty $1,200

    Resolve
  • Class - 1

    Bc3314.2 work w/o a permit installation of supported scaffold above 40ft.@ the time of my inspection of the new 42 story bldg under construction,i observed @ exp1 an erected supported scaffold from 4th fl to 7t

    May 12, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3301.6.1 design. note: at the time of my inspection of a 42 sty bldg at 34th fl level,construction work in progress. i observed safety embedded straps installed from 27th fl up(guardian). upon review of

    Apr 27, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements. attime of inspection observed a new bldg of 42 sty working on 26 floor decking rebar. during the inspection i observed an excessive amount of

    Mar 23, 2016

    Resolve
  • Class - 1

    Sec. 3301.2 adequate means of egress. at time of inspection observed anew bldg of 42 sty working on 26 floor decking rebar. during the inspection i observed inadequate & blocked mean of egress,failing to have

    Mar 23, 2016 · Penalty $400

    Resolve
  • Class - 2

    Temporary consruction equipment on site-expired permit.at time of inspection observed 8ft high wood construction fences under permit #121237358 has expired 9/12/15 with no renewal in system.rem:provide renewal

    Oct 13, 2015

    Resolve
  • Class - 1

    Failure to have site safety manager or coordinator present as required.noted:at time of inspection of proposed new building at 6 floors,has approx. 6 people on site with no site safety manager on site.job site

    Oct 13, 2015 · Penalty $1,200

    Resolve
  • Class - 2

    3303.11.1.1 maximum distance.at time of inspection of 42 story proposed -observed the following:42 story new building with concrete operation has not sercured staircase landing at 1st floor to second and ladder

    Oct 13, 2015

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or appro ved amendments.as noted:observed on site approved plan calls for a 4" gap between building,on site west shear wall (exp. 4) has been poured

    Oct 6, 2015 · Penalty $500

    Resolve
  • Class - 2

    Failure to provide p.e approved design on drawing as noted:during inspection of active construction site observed formwork in place for concrete.no p.e approved design drawing for formwork on site.provide site

    Oct 6, 2015

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments.at the time of inspection construction work in progress.i observed building structure up to 6 story.a review of the site safet

    Oct 5, 2015 · Penalty $1,000

    Resolve
  • Class - 1

    Bc3303.4.5.2 storage of material and debris on the perimeters of the open facade.at the time of my inspection constr,work in progress, i observed materials and debris store at the edge/perimeters of the buildi

    Oct 5, 2015 · Penalty $400

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperations at time of my inspection, construction work in progress.as reported by ssm#m002085 due to pressure created by concrete poured adj

    Oct 5, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per sections. as noted:at time of inspection of an active construction site observed in various areas and various floors large amounts of wood,rebar,debris and garbag

    Oct 2, 2015 · Penalty $400

    Resolve
  • Class - 1

    Bc 3309.10 no protection for roof skylight of adjoining bldg.note @time of insp active const site observed inadequate roof protection installed over skylight of adjoining bldg @rear exp#3 2nd fl is poured & for

    Aug 1, 2015 · Penalty $400

    Resolve
  • Class - 1

    Failure to provide sidewalk shed where required.note @time of insp 42 stories bldg under const bldg decking complete to 3rd fl observed no sidewalk shed installed of exp#1 steel (bars) for column extended pass

    Aug 1, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary contruction.not guardrails.note:at the time of my inspection respondingto incident #19803 where ssm reports carpenter fell through penetratio

    Jun 19, 2015 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. note: at the time of my inspection responding to incident #19803 where ssm reports carpenter fell through penetration on 1st flr

    Jun 19, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. 3301.7 design required by the chapter 33. note: at the time of my inspection responding to incident #19803 where ssm reports carpenter fell through penetration on 1st fl & injured shoulder. i observed work

    Jun 19, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3310.9 additional site safety personnel. noted: at time of myh inspection of a 42 story bldg at s.o.e. stage responding to complaint #1392484. i observed formwork and rebar handling operation in progress for

    Apr 1, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Work does not conform to approved construciton documents &/or approvedamendments. at time of inspection observed active jobsite. at exp#1 on40th st jobsite pedestrian walk constructed w/timber barride & plastic

    Feb 4, 2015 · Penalty $5,000

    Resolve
  • Class - 1

    Work does not conform to approved construction documents &/or approvedamendments. at time of inspection observed active jobsite. at exp#1 jobsite equipment ramp which is in use w/excavator on ramp. the ramp had

    Feb 4, 2015 · Penalty $1,000

    Resolve
  • Class - 2

    Sec. 3307.4 warning signs & lights: not provided. at time of inspection observed active jobsite. at exp#1 pedestrian walkway & jobsite barricades in place approx 60ft along 40th street. no lights or reflectors

    Feb 4, 2015 · Penalty $400

    Resolve
  • Class - 1

    Sec. 3303.4.1 maintenance: tripping hazards. at time of inspection observed active jobsite. jobsite walkway,above excavation site,used by men heading to (sharty's),equiptment sheds,egress/ingress ladders was

    Feb 4, 2015 · Penalty $8,000

    Resolve
  • Class - 2

    Bc3303.3 obstruction of sidewalk/street w/o dot permit.note: at time of inspection observed temporary pedestrian walkway 5'0"in place exp1 and dot permit for jersey barrier expired 11/15/14. rmdy: comply w/code

    Dec 17, 2014 · Penalty $400

    Resolve
  • Class - 1

    Bc3304.8 dep permit required for pumping water from exacation.note: active job site observed water been pump from excavation with hose that run to an adjacent property sewer.no water filtration tank was setup

    Dec 17, 2014 · Penalty $1,600

    Resolve
  • Class - 2

    28-165.12.2. work does not conform to approved site safety plans at site. active job site observed 5'0"pedestiran woakway with jersey barrier installed and in use. also water filtration tank is not set up at

    Dec 17, 2014 · Penalty $250

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Dec 26, 2020 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H2)
Year built
2015
Floors
42
Residential units
—
Building area
114,917 ft²
Lot area
4,937 ft²
Zoning
C6-4
Community board
104
Council district
3
Block / lot
763 / 47
Assessed value
$18,019,800
Landmark / historic district
No

Questions about 310 West 40 Street

Who owns 310 West 40 Street?

The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.

Does 310 West 40 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 310 West 40 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 310 West 40 Street built?

City records list 2015 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.