roofy

333 West 38 Street

Manhattan, NY 10018BBL 1-00762-0016Map

Owner of record: W38 Boutique Inn LLC

333 West 38 Street is a hotel built in 2017 in Manhattan, 10018. The owner of record is W38 Boutique Inn LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
26
ECB violations
25
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 26

  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2023

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 25, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 25, 2021

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 13, 2017

    Dob violation - dismissed
  • Construction other optional

    The borough commissioner has issued a notice to revoke application #140321195 due to revocation of the master plumber's and/or fire suppression license. all work in connection with this application has been ordered stopped immediately

    Dec 10, 2017

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 21, 2017

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Sep 21, 2017

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Sep 21, 2017

    Vp*-violation unserved ecb- dismissed
Show 16 more ↓
  • Construction other optional

    C-construction other optional

    Sep 8, 2017

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Sep 8, 2017

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Sep 7, 2017

    Vp*-violation unserved ecb- dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 12, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 12, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Mar 12, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 25

  • Class - 1

    Failure to maintain/display on site documents required by chapter 33.at time of inspection at a twenty two(22)story new building topped off i observed that the temporary elevator which was in use had an expired

    Feb 21, 2019 · Penalty $312

    Resolve
  • Class - 2

    Responsibility of owner of tall building-neighboring buildingchimney not extended.at the time of my inspection of a new 22 story building topped off i observed that the adjoining building new door had a chimne

    Feb 21, 2019 · Penalty $620

    Resolve
  • Class - 1

    Bc3310.8.4.1/site safety manager log book inspections.at time of inspection of a new 22 story building topped off i observed that the certificate in the temporary elevator had expired on 02/18/19 upon review of

    Feb 21, 2019

    Resolve
  • Class - 1

    Bc3301.4.concrete embedded safety straps(logs/inspection)at time of inspection i observed concrete embedded straps throughout the entire building on all floors.i requested inspection logs for the safety steps a

    May 9, 2018 · Penalty $625

    Resolve
  • Class - 2

    3301.2.holes not covered.@ time of inspection of new 22 story buildingon active jobsite.building topped off with construction workgoing on.iobserved numerous holes more than 2nd wide on numerous floors not cove

    Mar 26, 2018

    Resolve
  • Class - 2

    3301.1.2.fire code(exit signs)@ time of inspection of new 22 story building.building topped off,with active jobsite construction work going on.i observed that exit signs were missing @ stairs a & b.this conditi

    Mar 26, 2018

    Resolve
  • Class - 2

    3308.6 horizontal netting-at time of inspection on a active jobsite ofa 22 story building,observed horizontal netting at multiple locations inadequate.horizontal netting not fully open and tangle.this condition

    Feb 22, 2018 · Penalty $400

    Resolve
  • Class - 1

    Fail to perform hydrostatic pressure test: stand pipe. note: 22 story bldg erected to the 15 flr the stand pipe on site, there is no record of hydrostatic pressure test done w/ 75 ft as required causing a hazar

    Nov 13, 2017 · Penalty $2,400

    Resolve
  • Class - 1

    Sec: bc 3309.1. failure to adequately protect adjoining properties diving construction operations. note: 22 story bldg erected to the 15 flr. @ adjacent roof exp#2 (rear) the roof is not protected. @ exp#4 in/e

    Nov 13, 2017 · Penalty $400

    Resolve
  • Class - 1

    Sec: 3301.1.1. responsibility for safety: no caz. note: 22 story bldg erected to the 15 flr. @ the 6 flr set back @ exp#1 there is no oh pt or caz in place to alert workers/stop workers from walking out onto se

    Nov 13, 2017 · Penalty $1,600

    Resolve
Show 15 more ↓
  • Class - 1

    Work does not conform to approved construction documents &/or amendments. note: observed 22 story bldg erected to the 15 flr. the horizontal netting system is missing @ exp#3 east side of hoist. netting is stag

    Nov 13, 2017

    Resolve
  • Class - 2

    Failure to safeguard people/property:inadequate venting note:22 story building erected to the 6th fl forming 7th floor.there is large gas/fuel powered generator on 1st floor. the fues on 1st&2nd floor are very

    Sep 21, 2017 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to maintain/display on site does required by chapter 33.observed active site erected to the 6th fl-at expo # 1 in street observed ondocu barricade w/ chain line fence on top when i asked for design dra

    Sep 21, 2017 · Penalty $1,250

    Resolve
  • Class - 1

    3301.1.1responsibility for safety:inadequate egress note:observed 22 story building erected to the 7 floor (frame work)stripping in progress@ 7th floor,5th floor.there is absolutely no in/egress on these highly

    Sep 21, 2017 · Penalty $4,000

    Resolve
  • Class - 1

    Sec. 3303.2.4 sanitary facility. at time of inspection on active construction site i observed only 1 portable sanitary facility for 32 workers on construction site. currently on job site inadequate sanitary fac

    Sep 7, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3309.1 failure to adequately protect adj property at time of inspection,observed that lot line windows were not protected at exp34. stop all exterior work on exp#4 sheer wall from 1 sty to 4 sty except to.

    Sep 7, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3310.3 failure to comply w/ssp at time of inspection i observed that construction activitys on street at exp#1 were not being performedas per ssp. consisting of inadequate pedestrian & vehicular traffic

    Sep 7, 2017 · Penalty $400

    Resolve
  • Class - 2

    Failure to provide approved/accepted construction documents at job site at time of inspection. nb job #121187429. at time of an energy compliance inspection. i observed that there were no complete sets of dob a

    Sep 5, 2017

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperations.at time of inspection observed cracks on interior walls of adjacent property bldg #331 w 38 st due to construction operation next

    Apr 25, 2017 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain/display on site documents required by chapter 33.note:site within excavation/foundation phase.dob compliant states property @ expo#2 has began to crack in areas.observed vibration monitors o

    Apr 20, 2017 · Penalty $500

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and or amendments.note:site in foundation excavation phase-at expo#1 on 38th streetthe have dock barracade on the lane w/public walking in it.there is an

    Apr 20, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    Bc3301.3/site safety managers:to be designated.note;22 story building with foundation excavation phase dob bis-states.leanard fig is on pw2.michael mcallister #1391 states has been on site for 2.5 weeks.rem:com

    Apr 20, 2017 · Penalty $800

    Resolve
  • Class - 1

    Sec. 3309.4.4 monitoring. note: at the time of my inspection of a 22 sty bldg at excavation phase,construction work in progress. i observed excavation work in progress at exp#4 adjacent to adjacent property app

    Aug 24, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans at job site at time of inspection. note: at the time of my inspection of a 22 sty bldg at excavation phase construction work in progress. upon request for approved/acc

    Aug 24, 2016 · Penalty $250

    Resolve
  • Class - 1

    Bc3301.4. inspection note: at time of my inspection of complaint #1414799 where it was reported that fire to compressor at jobsite, fdny/nypd came and put fire out. no one was hurt just damage to compressor.upo

    Jan 19, 2016 · Penalty $1,630

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (HB)
Year built
2017
Floors
22
Residential units
—
Building area
35,219 ft²
Lot area
2,475 ft²
Zoning
C6-4M
Community board
104
Council district
3
Block / lot
762 / 16
Assessed value
$7,542,450
Landmark / historic district
No

Questions about 333 West 38 Street

Who owns 333 West 38 Street?

The owner of record in NYC Department of City Planning PLUTO data is W38 Boutique Inn LLC.

Does 333 West 38 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 333 West 38 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 333 West 38 Street built?

City records list 2017 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.