339 West 29 Street
Manhattan, NY 10001BBL 1-00753-0016Map
Owner of record: 339 W 29 Am LLC
339 West 29 Street is a walk-up apartment building built in 1847 in Manhattan, 10001. It has 10 residential units across 4.5 floors. The owner of record is 339 W 29 Am LLC. HPD has recorded 37 housing violations here, most recently on April 29, 2026. 26 of the 37 most recent violations are still open. City tax records listed 9 rent-stabilized apartments here in 2022.
- HPD violations
- 37
- DOB violations
- 42
- ECB violations
- 52
- HPD complaints
- 131
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 37
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood cabinets at east wall and west wall in the kitchen located at apt 2s, 3rd story, 1st apartment from south at west
Jan 8, 2026 · Apt 2S
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood sink base cabinet in the kitchen located at apt 2s, 3rd story, 1st apartment from south at west
Jan 8, 2026 · Apt 2S
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood wash basin countertop and vanity in the bathroom located at apt 2s, 3rd story, 1st apartment from south at west
Jan 8, 2026 · Apt 2S
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - BHazardous
Replace with new the missing lids at garbage cans at front area way
Sep 11, 2024
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 25, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Aug 25, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame at building front entrance at basement
Jan 22, 2024
Open — Nov sent out
Show 27 more ↓
- ANon-hazardous
Refit door at building front entrance at basement
Jan 22, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt gn, 1st apartment from west at north
Mar 18, 2023 · Apt GN
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Mar 18, 2023
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt gn, 1st apartment from west at north
Mar 18, 2023 · Apt GN
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt gn, 1st apartment from west at north
Mar 18, 2023 · Apt GN
Open — Notice of issuance sent to tenant - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Mar 18, 2023
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall
Mar 18, 2023
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Mar 18, 2023
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective shattered glass panel at entrance door , exposed broken glass shards hanging from door muntins at the basement level
Mar 18, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the south wall basement level
Mar 18, 2023
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and the ceiling at basement level
Mar 18, 2023
Open — Nov sent out - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing drop ladder at fire escape at south
Apr 20, 2022
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 16, 2022
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice at basement
Jul 26, 2021
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 1, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 2, 2015
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt gn, 1st story, 1st apartment from west at north
Oct 1, 2015 · Apt GN
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material. at front areaway
Feb 28, 2010
Open — Nov sent out - BHazardous
Properly repair the broken or defective paving concrete at north court yard
Jul 31, 2009
Open — Nov certified late - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st living room from north at west located at apt 2s, 2nd story, 1st apartment from south at west
Jun 17, 2009 · Apt 2S
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2s, 2nd story, 1st apartment from south at west
Jun 17, 2009 · Apt 2S
Open — Nov sent out - BHazardous
Properly repair the broken or defective fire retardent ceilling at public hall, 2nd story
Jun 17, 2009
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock 2 sty north apt 2n. , section '' ''
Aug 1, 1997 · Apt 2N
Open — Nov certified late
DOB building violations · 42
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Construction other optional
Submittal of construction drawings:landmark building under structural monitoring.on 3-20-19 alt# 123544334 was permitted for construction however work was not commenced on this structurally deficient facade due to organization of dob/lpc permitted drawings.by 7/3/19,provide dob/lpc with corrected drawings so that construction may proceed
Jun 28, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - active - Construction other optional
Fail to comp w/comm order.on 9/27/18 visit site to review progress on rprs to unsafe bldg that was part stab by own to make safe non comp vert&horiz addition.no facade rprs undertaken&facade remain unsafe, despite owner assurance that rprs will be occup.remedy:undertaken to mult dwlg&no drg filed.comp w/code.make bldg safe rpr facade
Sep 26, 2018
Dob violation - active - Construction other optional
339 w 29th st is a 5 stry masonry bldg und alt that is halted&bldg is unsafe.there are 2 occupied apts.bldg will be shored&repair work under taken.currently bldg has to be strl monitored daily.remedy:prov strl eng'r observations&report daily,noting all footers,5thfl,roof,walls, strl stab
May 12, 2017
Dob violation - active - Emergency none
Partial demo
May 11, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 24, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 10, 2016
Dob violation - active - Construction other optional
Failure to comply with commissioners order. commissioners order 050616feu10405mm, control no. 327900 requires owner to submit information by 5/26/16. no information has been received as of 6/2/16 remedy: immediately comply with order and submit information no later than 6/17/16
Jun 2, 2016
Dob violation - active
Show 32 more ↓
- Construction other optional
Failure to comply with commissioners order. commissioners order 050616feu10408mm, control no. 327978 requires the owner to submit information by 5/26/16 no information has been received as of 6/2/16 remedy: immediately comply with order and submit information no later than 6/17/16
Jun 2, 2016
Dob violation - active - Construction other optional
Failure to comply with commissioners order. commissioners order 050616feu10407mm, control#327977 requires owner to submit information by 5/26/16.no information has been received as of 6/2/16 remedy: immediately comply with order and submit information no later than 6/17/16
Jun 2, 2016
Dob violation - active - Construction other optional
Failure to comply with commissioners order. commissioners order 050616feu10406mm, control no. 327976 requires owner to submit information by 5/26/16. no information has been received as of 6/2/16 remedy:immediately comply with order and submit information no later than 6/17/16
Jun 2, 2016
Dob violation - active - Construction other optional
Failure to comply with commissioners order. commissioners order 050616feu10404mm, control no. 327899 requires owner to submit information by 5/26/16 as of 6/2/16 no information was received remedy: immediately comply with order and submit information no later than 6/17/16
Jun 2, 2016
Dob violation - active - Construction other optional
Failure to comply woth commissioners order. commissioners order 050616feu10403mm, control no. 327898 requires owner to submit information by 5/26/16 as of 6/2/16 no information was received remedy: immediately comply with order and submit information no later than 6/17/16
Jun 2, 2016
Dob violation - active - Construction other optional
Failure to comply with commissioners order. commissioners order 050616feu10402mm,control no. 327897 requires owner to submit information by 5/26/16. as of 6/2/16 no information was received remedy: immediately comply with order and submit information no later than 6/17/16
Jun 2, 2016
Dob violation - active - Construction other optional
Failure to comply with commissioners order.commissioners order control no. 327896 requires owner to submit structural drawings to dob forensic engineering by 5/26/16. as of 6/2/16 no information was received. remedy: immediately comply with order and submit drawings no later than 6/17/16
Jun 2, 2016
Dob violation - active - Construction other optional
Support of party wall section 3309.4.0 notes that its the owners responsibility to protect party walls during excavation & support them w/proper foundations.the walls are to remain practically as safe as it was before the excavation was commenced. remedy:provide technical report detaling the structural support.submit to dob feu by 5/26/16
May 6, 2016
Dob violation - active - Construction other optional
Section 1704.20.2 requires special inspection for methods employed to protect the sides of excavations.the cellar of the bldg was lowered and replaced requiring excavation,protection and special inspections remedy:provide the dob w/all tri-pictures & reports for 1704.20.2 excavations submit information to dob forensic no later than 5/26/16
May 6, 2016
Dob violation - active - Construction other optional
Post installed anchors section 1704.32 requires speial inspection for the installation of post-installed mechanical,adhesive & screw anchors the bldg has a new bulkhead structure installedon top pf the existing parapet.remedy:provide dob w/all tri-pictures and reports for 1704.32 post installed anchors submit info to dob feu no later than 5/26/16
May 6, 2016
Dob violation - active - Construction other optional
The dob can request addt'l information per 28-104.7.1 the entire extent of work is to be shown on construction dwgs.the bldg has been substantially altered on that an addt'i flr was added on top of the existing structure.the dwgs submitted under job#10307337.remedy:immed provide the pre-permit structural calculations for the 2flr framing
May 6, 2016
Dob violation - active - Construction other optional
Fm bldg.analysis requirments are defined in 1604.4 no details are shown on the dwgs submitted under job#10307337 regarding the removal & installation of steel beams in the bsmt framing.the front of the bsmt framing was removed & replaced with +/-15ft long by 4' deep steel beam remedy:submit information to dob feu by 5/26/16
May 6, 2016
Dob violation - active - Construction other optional
Per 28-104.7.11 dob can request addt'l information. the entire extent of work is to be shown on the construction dwgs.the bldg has been substanially altered in that an addt'l flr was added on top of existing structure.no details are shown on the dgws.remedy:submit information to dob feu ny 5/26/16 immed provide the pre-permit cal
May 6, 2016
Dob violation - active - Construction other optional
The bldg was altered under job#10390733.the load path of the bldg was significantly altered resulting in more than 5% increase in the load on the existing foundations.pursuant to 1802.0 a geotechnical report is required to determaine that the foundations are sufficicent.remedy: submit the information to dob feu by 5/26/16 provide geotechnical rprt
May 6, 2016
Dob violation - active - Construction other optional
C-construction other optional
May 6, 2016
Dob violation - active - Construction other optional
The dob request addt'l informationper 28-104.701 the entire extent of work is to be shown on the construction dwgs.provide structural eng'r dwgs to the dept of bldgs to reflect the addt'l work done under job # 103907337.remedy:by 5/26/16 submit structural dwgs for the bldg to matt milner,pe,dob forensic engineering unit 280 broadway ny ny 10007
May 6, 2016
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 24, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 6, 2011
Dob violation - dismissed - Construction other optional
Dob violation issued for work w/out after hours variance permit
Nov 6, 2010
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Jul 28, 2009
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 21, 2008
Dob violation - active - Construction other optional
C-construction other optional
Feb 25, 2008
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Feb 25, 2008
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 19, 2007
Dob violation - active - Construction other optional
C-construction other optional
May 9, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
May 9, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
ECB violations · 52
- Class - 2
Found weil mclain (eg 45) gas fired boiler in basement not registered correct violating condition submit certificate of correction
Sep 9, 2021
Resolve - Class - 1
Failure to maintain on 9027-18 i visited 339 w 29 t, a 4 story occupied m./p landmarked building. recently, for departemnt's order owner removed unsafe vertical andhorizontal enlargement. the facade of the
Sep 27, 2018 · Penalty $1,250
Active - Class - 2
Maintenance of bldgs,appts and serv equipment: 339 w 29 st mn, and 4 story and b and c masonry bearing wall bldg supporting wood joists and dating from mid 1900s is an occupied multiple dwellin under a vert an
Mar 29, 2017
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35166958x issued on 05/23/16 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. remedy: comply w/comm's order &/or file a c of c.
Dec 7, 2016 · Penalty $800
Resolve - Class - 2
Failure to comply w.the commissioner's order contained in nov#35166958x issued 05/23/16 &to file a certificate of correction pursuant to 28-201.1,28-204.4 &1rcny 102-01.rem:comply w.commissioner's order &/or fi
Oct 22, 2016 · Penalty $800
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35166958k issued on 05/23/16 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. failure to comply w/violation of multiple dwelling law 171.2.
Aug 25, 2016 · Penalty $800
Resolve - Class - 1
Violation of mdl 171.2(7)it is unlawful to enlarge or extend any converted dwelling so as to exceeed by more than 25 per centum the area which such dwelling had any floor at the time of its conversion. the enla
May 23, 2016 · Penalty $2,500
Resolve - Class - 2
Failure to maintain the bldg in a code compliant condition. the bldg is incomplete, unenclosed, unsafe w/ unverified & undocumented framing that is not code compliant. the bldg has not been actively maintained
May 6, 2016 · Penalty $500
Active - Class - 2
Sec: 28-105.12.3. adherence to lot diagram, mandates that all work shall be strictly located in accordance w/ the lot diagram approved in accordance w/ this code & no lot or plot shall be changed, increased or
May 6, 2016 · Penalty $800
Active - Class - 1
Scope scaffolds "shall be erected & maintained so that the safety of the public & property will not be endangered". the scaffolding erected @ the front & rear of the bldg is in poor condition & has not been mai
May 6, 2016 · Penalty $1,600
Active
Show 40 more ↓
- Class - 2
Temporary construction equipment on site-expired permit. note: observed supported scaffold erected on top of sidewalk shed at exp#1(60'high)supported scaffold permit #104034046-01-eq-sf expired. see vio#3503166
Feb 21, 2015 · Penalty $800
Resolve - Class - 2
Sec. 3307.6 pedestrian protection not in compliance w/section. note: observed sidewalk shed erected at front of the bldg. sidewalk hsed not extended 5 feet over the bldg lines as required by code specification.
Feb 21, 2015 · Penalty $6,000
Resolve - Class - 2
Temporary construction equipment on site expired permit. note: observed sidewalk shed erected at front of the bldg. sidewalk shed permit #110050140-01-eq-sh expired see vio #35031667h. remedy: pswo still valid
Feb 21, 2015 · Penalty $800
Resolve - Class - 2
Expired permit for temporary construction equipment. note:supported scaffolds permit expired. rem:renew permit.
Mar 19, 2014 · Penalty $800
Resolve - Class - 2
Expired permit for temporary construction equipment on site. note:sws permit expired. rem:review permit.
Mar 19, 2014 · Penalty $800
Resolve - Class - 2
Expired permit for temporary construction equipment on site.note:fence - expired permit. rem:renew permit.
Mar 19, 2014 · Penalty $800
Resolve - Class - 2
Temporary construction equipment on site - expired permit. noted: at time of inspection, sidewalk shed erected at exp 1 w/60' tall supported scaffold on top - permit is expired (shed #110050140) *stop all work
Jan 13, 2014 · Penalty $800
Resolve - Class - 2
Temp construction equipment on site - expired permit. noted: at time of inspection. supported scaffold approx 60' in height erected at exp 1 - permit expired (supported scaffold #104034046) *stop all work on
Jan 13, 2014 · Penalty $800
Resolve - Class - 2
Sidewalk shed does not meet code specifications. noted: at time of inspections. noted: at time of inspection, sidewalk shed w/approx 60'highsupported scaffold on top erected at exp 1. sidewalk shed does not
Jan 13, 2014 · Penalty $2,400
Active - Class - 2
B254,32a,36,50,50a,50b,50c,50d,50e,50f,50g,50h. 36-weilmcclain boiler on site unregistered, hb smith boiler in dob records under md28025-01;50-mxing valve leaking and temperature guage missing;50a-spill switch
Nov 19, 2012 · Penalty $500
Active - Class - 2
Expired permit for temporary construction equipment. noted:supported scaffolds permit #104034046 has been expired on 12/17/10. rem:renew permit or remove equipment.
Jul 19, 2012 · Penalty $400
Resolve - Class - 2
Expired permit for temp construction equipment.noted:sidewalk shed permit#110050140 has been expired on 3/1/12.rem:review permit or remove sws.
Jul 19, 2012 · Penalty $800
Resolve - Class - 2
Expired permit for temp construction.noted:fence permit#110115651 has been expired 12/17/10.rem:review permit.
Jul 19, 2012 · Penalty $400
Resolve - Class - 2
Work w/o a permit: expired permit. defects noted: at time of inspection scaffold permit under job appl #104034046 has expired as of 12.17.10. also noted: fence permit under job appl #110115651 has expired as of
Jun 11, 2012 · Penalty $800
Resolve - Class - 2
B254,15,16,19b,24b,36,37,48a,50a,b,c,d,e,f,g,h,i,j. 50a- no (thermal) loop on mixing valve. 50b- relief valve not piped down. 50c- backflow to be piped down to 6" above flr. 50d- new chimney not filed for.
May 27, 2011 · Penalty $500
Resolve - Class - 1
B101. installation of replacement boiler w/plans or permits on file w/the nyc dob.
May 27, 2011 · Penalty $1,600
Resolve - Class - 1
Unlawfully continued work while on notice of stop work order. noted the following conditions: workers in cellar front framing walls & ceiling while a stop work order exist on this site: tenant safety work was
Jan 31, 2011 · Penalty $4,800
Active - Class - 1
Sec. 28-207.2.2;28-248. failure to comply w/an order to stop work by the dept. noted: upon inspection metal stairs installed from lobby aptto basement, work is being done beyond the scope of original partial
Jan 14, 2011
Resolve - Class - 2
(misc)28-207.2.2 & 26-248failure to comply with stop work order 051209c042p01,dtd 5/12/09 and stop work order 072809c0401vf/251/25dtd 7/28/09 and partial stop work rescind order dated 10/19/10.authorizing speci
Nov 18, 2010 · Penalty $800
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations. noted: upon inspection no fire protection from basement to1st flr apt(occupied)& also from 2nd to 3rd flr apt.no fire protection
Oct 13, 2010
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations. noted: upon inspection. apt at 5th flr open wall & entry to construction area/access for public. remedy: safeguard public and
Oct 13, 2010
Resolve - Class - 2
Sec. 3301.2;27-1009a. failure to provide 3'6" guard rails or equivalent around all flr and perimeter openings. noted: upon inspection guard rails installed on stairwells on all flrs. inadequate, weak toe boards
Oct 13, 2010
Resolve - Class - 2
Sec. 3309.10;25-230. failure to protect adjoining roofs, skylights, chimneys and outlets affected by construction operations. noted: upon inspection no roof protection on adjoining bldg 337 w 29 st & inadequate
Oct 13, 2010
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments.noted:sdwlk shed installed @ exposure#1-missing cross-braces,missing pipe railing,missing horizontal braces.rem:conform to approv
Aug 31, 2010
Resolve - Class - 2
Sidewalk shed doesn't meet building code-specifications. noted shed at exp #1 has no protection of cut,flattened pipes or bolts. this conditions are hazardous to pedestrians. remedy: conform shed to code specs.
Mar 30, 2010 · Penalty $2,400
Resolve - Class - 1
Sec. bc 3314.9 supported scaffold doesn't meet building code specificitions. noted: scaffold at exp #1 approx 75' high is approx 25'higher than roof level. these sections are not secured in anyway. there are no
Mar 30, 2010 · Penalty $8,000
Resolve - Class - 2
Work does not conform to approved plans #103907337. non-conforming work noted: structural plans do not match w/amended architectural plans (dated 3.6.09). no details for construction. material no elevation
May 12, 2009 · Penalty $500
Resolve - Class - 2
Installed equipment does not match approved plans/drawings work contrary to dob approved plans and applications. noted: supported scaffold installed on exp 1,3 do not match approved plans. installed 5 planking
May 6, 2009 · Penalty $250
Resolve - Class - 2
Failure to provide required signage and information on sidewalk shed: noted: wrong permit number and expiration date on sidewalk shed sign. remedy: comply w/code.
May 6, 2009
Resolve - Class - 2
Work does not conform to approved construction documents & or approvedamendments.noted work:smaller wd bns inst,approved plans dated 09-24-07 specify replacement of structural beams of 3/8 x 12".woods beams
Jan 28, 2009
Resolve - Class - 2
Sidewalk shed does not meet code specifications.noted 4 x 8 parapet board attached on left side by 4 hinges,unsecure on right side,leaving it to blow in wind,also approx 5 story scaffold expected on shed w/safe
Aug 8, 2008
Resolve - Class - 1
Failure to maintain bldg in code compliant manner.noted:new vertical extension(job #103907337) constructed of metal studs a plywood decking left open to weather & unprotected frame walls have no sheathing,open
Aug 8, 2008
Resolve - Non-hazardous
Sidewalk shed does not meet dob specifications note no tamper proof light fixtures at shed remedy: conform to dob shed specifications
Mar 3, 2008
Resolve - Non-hazardous
Failure to provide contractor's sign remedy:provide contractor's sign
Mar 3, 2008
Resolve - Non-hazardous
No permit for fence 8 high plywood construction fence erected at front of jobsite and dob records indicates that no permit had been obtained remedy: obtain fence permit
Mar 3, 2008
Resolve - Non-hazardous
Work does not conforms to approved plans #103907337 non conforming work noted:install wood joists 2"x10" 16o.c instead of 3 1/8" x 12" 1'8 3/4"o.c how plans shows,between 1st & 4th fl.remedy:conform to approved
Oct 12, 2007 · Penalty $250
Resolve - Non-hazardous
Failure to provide approved plans at time of inspection. noted: no demo plans or engineered joist approved plans or drawing are on the job site. remedy: stop all work,have approved plans on jobsite
Sep 13, 2007
Resolve - Non-hazardous
Failure to provide at least 2 means of egress from room space as required.tenant residing at ground fl level lobby,exposed walls,no fire rated material observed in lobby.remedy:provide required means of egress.
May 9, 2007
Resolve - Hazardous
Sec.27-1009(a).no guardrails.noted:guard rails missing at window & door openings.stop all work except to make safe.remedy:provide guard rails
May 9, 2007 · Penalty $500
Resolve - Non-hazardous
Sidewalk shed overload:construction materials stored on shed.remedy:reduce load remove all stored items from shed.
May 9, 2007 · Penalty $2,000
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Jul 7, 2026 · Apt BN
Close - Unsanitary condition
Garbage/recycling storage
Jun 3, 2026 · Apt 2S
Close - Heat/hot water
Entire building
Apr 17, 2026 · Apt BUILDI
Close - Heat/hot water
Apartment only
Apr 17, 2026 · Apt GN
Close - General
Cabinet
Apr 5, 2026 · Apt 2S
Close - Heat/hot water
Apartment only
Apr 5, 2026 · Apt 2S
Close - Heat/hot water
Apartment only
Feb 2, 2026 · Apt 2S
Close - General
Cabinet
Feb 1, 2026 · Apt 2S
Close - Door/window
Window frame
Feb 1, 2026 · Apt 2S
Close - General
Bell/buzzer/intercom
Feb 1, 2026 · Apt 2S
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Feb 1, 2026 · Apt 2S
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt GN
Close - Heat/hot water
Apartment only
Nov 30, 2025 · Apt 2S
Close - Plumbing
Radiator
Oct 19, 2025 · Apt GN
Close - Electric
Outlet/switch
Oct 2, 2025 · Apt 2S
Close - General
Cabinet
Oct 2, 2025 · Apt 2S
Close - Unsanitary condition
Garbage/recycling storage
Jul 27, 2025 · Apt 2S
Close - Door/window
Window pane
Apr 3, 2025 · Apt GN
Close - General
Cabinet
Mar 16, 2025 · Apt 2S
Close - Paint/plaster
Ceiling
Mar 16, 2025 · Apt 2S
Close - Safety
Fire escape
Mar 16, 2025 · Apt 2S
Close - Unsanitary condition
Garbage/recycling storage
Feb 20, 2025 · Apt GN
Close - Heat/hot water
Entire building
Feb 8, 2025 · Apt GN
Close - Heat/hot water
Entire building
Jan 24, 2025 · Apt GN
Close - Unsanitary condition
Garbage/recycling storage
Aug 28, 2024 · Apt GN
Close - Unsanitary condition
Garbage/recycling storage
Jun 30, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 19, 2024 · Apt 2S
Close - Heat/hot water
Entire building
Jan 18, 2024 · Apt GN
Close - Heat/hot water
Entire building
Jan 10, 2024 · Apt GN
Close - Heat/hot water
Entire building
Jan 7, 2024 · Apt GN
Close - Unsanitary condition
Pests
Jun 28, 2023 · Apt UNKNOW
Close - Heat/hot water
Entire building
Mar 16, 2023 · Apt GN
Close - Heat/hot water
Apartment only
Mar 16, 2023 · Apt GN
Close - Heat/hot water
Entire building
Nov 17, 2022 · Apt GN
Close - Unsanitary condition
Garbage/recycling storage
Aug 30, 2022 · Apt 2S
Close - Heat/hot water
Entire building
Apr 19, 2022 · Apt GN
Close - Heat/hot water
Entire building
Feb 24, 2022 · Apt GN
Close - Heat/hot water
Entire building
Sep 3, 2021 · Apt GN
Close - Unsanitary condition
Mold
Aug 23, 2021 · Apt GN
Close - Unsanitary condition
Pests
Jul 5, 2021 · Apt 2S
Close - Unsanitary condition
Garbage/recycling storage
Jul 5, 2021 · Apt 2S
Close - Heat/hot water
Entire building
Mar 29, 2021 · Apt GN
Close - Heat/hot water
Entire building
Mar 12, 2021 · Apt GN
Close - Heat/hot water
Entire building
Jan 2, 2021 · Apt GN
Close - Heat/hot water
Apartment only
Nov 23, 2020 · Apt GN
Close - Heat/hot water
Apartment only
Mar 10, 2020 · Apt GN
Close - Unsanitary condition
Garbage/recycling storage
Apr 5, 2018 · Apt 2S
Close - Unsanitary condition
Garbage/recycling storage
Apr 5, 2018 · Apt 2S
Close - Unsanitary condition
Garbage/recycling storage
Mar 25, 2018 · Apt 2S
Close - Heat/hot water
Apartment only
Jul 16, 2016 · Apt GN
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1847
- Floors
- 4.5
- Residential units
- 10
- Building area
- 6,578 ft²
- Lot area
- 2,173 ft²
- Zoning
- R8B
- Community board
- 104
- Council district
- 3
- Block / lot
- 753 / 16
- Assessed value
- $1,860,300
- Landmark / historic district
- Lamartine Place Historic District
HPD registration #124850, last renewed Aug 26, 2025.
Questions about 339 West 29 Street
Who owns 339 West 29 Street?
The owner of record in NYC Department of City Planning PLUTO data is 339 W 29 Am LLC.
Does 339 West 29 Street have violations?
Yes. NYC HPD has recorded 37 housing violations at this property.
Is 339 West 29 Street rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2022 (about 90% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 339 West 29 Street built?
City records list 1847 as the year it was built.
How many apartments are in 339 West 29 Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.