515 West 36 Street
Manhattan, NY 10018BBL 1-00708-0020Map
Owner of record: Hudson 36 LLC
515 West 36 Street is an elevator apartment building built in 2016 in Manhattan, 10018. It has 251 residential units across 39 floors. The owner of record is Hudson 36 LLC. HPD has recorded 35 housing violations here, most recently on August 21, 2026. 5 of the 35 most recent violations are still open. City tax records listed 63 rent-stabilized apartments here in 2024.
- HPD violations
- 35
- DOB violations
- 25
- ECB violations
- 27
- HPD complaints
- 81
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 35
- BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 2nd room from east located at apt 22g, 21st story, 1st apartment from west at north
Aug 21, 2026 · Apt 22G
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from east located at apt 22g, 21st story, 1st apartment from west at north
Aug 21, 2026 · Apt 22G
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallway located at apt 22g, 21st story, 1st apartment from west at north
Aug 21, 2026 · Apt 22G
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the private hallway located at apt 22g, 21st story, 1st apartment from west at north
Aug 21, 2026 · Apt 22G
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 10j, 10th story, 1st apartment from west at north
Jul 10, 2026 · Apt 10J
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt 16b, 15th story, 1st apartment from north at east
Jun 13, 2026 · Apt 16B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 16b, 15th story, 1st apartment from north at east
Jun 13, 2026 · Apt 16B
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 13, 2026
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 13, 2026
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 10d, 10th story, 1st apartment from south at west
Jun 3, 2026 · Apt 10D
Closed — Violation dismissed
Show 25 more ↓
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the private hallway located at apt 10d, 10th story, 1st apartment from south at west
Jun 3, 2026 · Apt 10D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at stairway a at public hall, 19th story
Jun 3, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door at public hall, 36th story
Jun 3, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at refuse room door at public hall, 22nd story
Jun 3, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the private hallway located at apt 11d, 11th story, 1st apartment from south at west
Jun 3, 2026 · Apt 11D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door at public hall, 25th story
Jun 3, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door at public hall, 32nd story
Jun 3, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door at public hall, 35th story
Jun 3, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective mechanical air vent at north wall in the bathroom located at apt 16c, 15th story, 1st apartment from west at north
May 31, 2026 · Apt 16C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door on north at compactor closet, 18th story
Oct 27, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door at north at compactor closet, 22nd story
Oct 27, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at compactor closet, 22nd story
Oct 15, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 18th story
Oct 15, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls in the bathroom located at apt 17a, 17th story, 2nd apartment from north at east
Jul 31, 2024 · Apt 17A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 16b, 16th story, 1st apartment from north at east
Oct 30, 2023 · Apt 16B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 16b, 16th story, 1st apartment from north at east , section ''north''
Mar 6, 2023 · Apt 16B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 16b, 16th story, 1st apartment from north at east , section ''north''
Mar 6, 2023 · Apt 16B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south and west walls in the 1st room from east at south located at apt 10j, 10th story, 1st apartment from east at south
Sep 7, 2022 · Apt 10J
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Mar 18, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 18, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Mar 18, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Mar 18, 2021
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Mar 18, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 18, 2021
Closed — Violation dismissed
DOB building violations · 25
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed
Show 15 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2021
Dob violation - resolved - Construction other optional
As per incident occured on 2/25/19. inner glass panel fell form the 25th flr on expos#1(south elevation)remedy:owner to immed inspect all glass window panels(100 % hands on) on all exposures and provide nys lic professional engineer drawig proposal of repairs by 3/25/2019 and evaluate window glass panels conditions. submit all information
Feb 25, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 30, 2018
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 10, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 10, 2018
Dob violation - dismissed
ECB violations · 27
- Class - 2
I observed in roof top mechanical room, gas regulators on main house pipe were not vented correctly allowing gas to escape into mechanical room which is prohibited and not code compliant as per fgc 410.3., repa
Mar 11, 2026 · Penalty $3,125
Resolve - Class - 2
1/x/10 emergency stop switch bell does ring when activated inoperativerepair,98/m/7, 5 year tag missing provide, 59/x/7 brake tag missing provide.
Nov 24, 2023
Resolve - Class - 1
Bc3310.8.2.1 site safety manager failed to notify the dept of unsafe conditions/accident. at the time of inspection of a 39story building topped off. i observed a sidewalk shed at exp3 with one of its posts
Mar 1, 2019 · Penalty $1,250
Resolve - Class - 1
Bc 3301.2 failure to institute and maintain safe operations. note:at the time of my inspection of an active jobsite,responding to incident where site safety manager reported that a window at the 25th fl was lef
Feb 25, 2019 · Penalty $2,530
Resolve - Class - 1
Failure to safeguard all persons and property affected by construction operations.in response to an incident for the above mentioned complaint #,it was observed that a pedestrian joseph branciforte was struck a
Nov 27, 2018 · Penalty $10,000
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments.in response to an incident for the above mentioned complaint,it was observed that the roadway fence was unstable and out of pl
Nov 27, 2018 · Penalty $2,500
Resolve - Class - 1
3304.7 required means of egress. at time of inspection on an active jobsite of a 39 story building. observed that egress/ingress leading from hoist on 34th fl is compromised by material/machinery storage creati
Jul 30, 2018 · Penalty $2,500
Resolve - Class - 1
Housekeeping. @ time of insp of a 39 story nb observed certain areas on floors 30 through 39 w/ inadequate housekeeping, hallways & rooms consisted of wallboard,insulation,bx cables & other debris scattered on
Jul 25, 2018
Resolve - Class - 1
Bc3301.2.failure to holes covered.at time of inspection observed active job site.failure to maintain holes.covered was not adequately at ground floor.worker was working close to holes covered on plank.worker wa
May 10, 2018 · Penalty $2,500
Resolve - Class - 1
Bc 3301.1.2 failure to have fdny permit for propane stored on site. noticed at time of inspection nb in progress noticed propane stored onground floor in a case permit for propane storage use expired 1/26/18.
Feb 13, 2018 · Penalty $1,600
Resolve
Show 17 more ↓
- Class - 2
Failure to safeguard all pesons and property effected by construction operations partial stop work on all backer scaffolds.note at time of inspection as per alphonso grill @ site safety manager linknocker wilfr
Dec 4, 2017 · Penalty $5,000
Resolve - Class - 1
Sec: bc 3301.6. no drawings (fall arrest system). @ time of insp of a 39 story bldg currently on roof level, observed workers using a lifeline system contrary to manufactures specs & no design drawings for curr
Dec 2, 2017 · Penalty $1,600
Resolve - Class - 1
Inadequate safety measures with operations of crane/hoisting equipmentin unsafe manner.at time of inspection i asked project manager markterelle for permit and plans for spydercrane which was being used to hois
Oct 15, 2017 · Penalty $10,000
Resolve - Class - 1
Inadequate safety measures with operations of crane/hoisting equipmentin unsafe manner.at time of inspection i requested permit for spydercrane which was hoisting windows on the 5th floor outside of building fr
Oct 13, 2017 · Penalty $4,800
Resolve - Class - 2
Sec. 3307.2.1 dot permit not in conjunction. noticed at time of inspection noticed nb in progress. noticed at exp#1 temp walkway for pedestrians blocked by outriggers from truck loading material into site. dot
Jan 4, 2017
Resolve - Class - 2
Sec. 3304.8 dewatering site w/o dep permit to dewater. noticed at timeof inspection nb in progress. noticed at exp#1 dewatering of site water pumping out into street into catch basin w/o dewatering permits.
Jan 4, 2017 · Penalty $800
Resolve - Class - 2
Job site fence not constructed to code. noticed at time of inspection job site fence erected at exp#1 not to code fence is pealing off & has holes. remedy: construct fence to code.
Jan 4, 2017
Resolve - Class - 1
Failure to notify the dob w/i 24-48hrs of the start of excavation. at the time of inspection,the excavation work had started & the dob was not notifued of the start of excavation. remedy: offically notify the
Apr 26, 2016 · Penalty $1,200
Resolve - Class - 2
Failure to provide approved/accepted plans at the jobsite. at the timeof inspection,the respondent failed to provide approved/accepted plansfor the support of excavation(soe)in that no elevation plans were prov
Apr 26, 2016
Resolve - Class - 2
Failure to post dot permit for street closing. a debris container has been placed in street closing curb lane of w 36 street. note: there are 2 containers in street in front of 513-515 w 36 st. remedy: post
Dec 28, 2013 · Penalty $250
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection. defects noted: construction site fence erected under job #121584222 issued 8-14-13,expiring on 7-16-14 does not comply w/ll 47 of 2013. no
Sep 29, 2013
Resolve - Class - 1
Sec. bc 3303.5.2. dropping or throwing prohibited. at the time of my inspection demo work in progress approx 15 workers on site. i observedworkers dropping and throwing wood beam approx 22' by 3" wide from the
Sep 26, 2013 · Penalty $1,600
Resolve - Class - 1
Sec. bc 3306.2. failure to protect utility lines of adjoining bldg - upon inspection demolition work of 5 sty bldg commenced, work in progress. at time of inspection noted the telephone and cable service lines
Aug 16, 2013 · Penalty $800
Resolve - Non-hazardous
Occupancy to that allowed by the certificate of occupancy in that c ofo #37776 stated at cellar storage & sale & 3rd & 4th store light storage and incidental manufactoring for each story at time of inspection
Feb 24, 2004 · Penalty $800
Resolve - Hazardous
Work without a permit hazardous work noted at roof an addition room created at 3rd floor partition walls weree erected to create occupiable space wit ha full working kitchen (with a glass stove)3pc, bathroom,at
Feb 24, 2004 · Penalty $800
Resolve - Non-hazardous
Work w/o permit(s); work noted erected a structure on roof approx 24' x 50' x 9'h. remedy : obtian permit if possible or restore to prior legal condition.
Dec 11, 2002
Resolve - Non-hazardous
Work without permits, work noted: at roof level erected a penthouse approx 15x22' long & 8'h pent house fully occupied no work on file with dept. of bldg. remedy; stop all work obtain all req permits plans from
Jul 5, 2002
Resolve
Complaints
- Water leak
Heavy flow
Aug 14, 2026 · Apt 22G
Close - Water leak
Slow leak
Jun 11, 2026 · Apt 16B
Close - Electric
No lighting
Jun 11, 2026 · Apt 16B
Close - Plumbing
Basin/sink
Jun 11, 2026 · Apt 16B
Close - Heat/hot water
Apartment only
May 28, 2026 · Apt 16C
Close - Heat/hot water
Apartment only
Jan 5, 2026 · Apt 20B
Close - Heat/hot water
Entire building
Jan 23, 2025 · Apt 15H
Close - Paint/plaster
Ceiling
Dec 6, 2024 · Apt 36C
Close - General
Mailbox
Feb 27, 2024 · Apt 24A
Close - Door/window
Window frame
Feb 27, 2024 · Apt 24A
Close
Show 40 more ↓
- Water leak
Heavy flow
Dec 15, 2023 · Apt 17B
Close - Plumbing
Basin/sink
Dec 13, 2023 · Apt 17B
Close - Plumbing
Water supply
Nov 9, 2023 · Apt BLDG
Close - Plumbing
Water supply
Nov 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt 17D
Close - Heat/hot water
Apartment only
Nov 2, 2023 · Apt 12D
Close - Plumbing
Basin/sink
Oct 23, 2023 · Apt 17B
Close - Plumbing
Basin/sink
Oct 23, 2023 · Apt 17B
Close - Water leak
Heavy flow
Oct 16, 2023 · Apt 16B
Close - Plumbing
Basin/sink
Oct 5, 2023 · Apt 17B
Close - General
Bell/buzzer/intercom
Aug 17, 2023 · Apt 19B
Close - Water leak
Heavy flow
Jun 29, 2023 · Apt 22B
Close - Plumbing
Bathtub/shower
Mar 21, 2023 · Apt 17A
Close - Paint/plaster
Wall
Mar 21, 2023 · Apt 17A
Close - Door/window
Window frame
Mar 21, 2023 · Apt 17A
Close - Heat/hot water
Apartment only
Mar 7, 2023 · Apt 12D
Close - Heat/hot water
Apartment only
Mar 4, 2023 · Apt 12D
Close - Heat/hot water
Apartment only
Mar 3, 2023 · Apt 12D
Close - Door/window
Window frame
Feb 10, 2023 · Apt 17A
Close - Paint/plaster
Wall
Feb 10, 2023 · Apt 17A
Close - General
Ventilation system
Jan 18, 2023 · Apt 31J
Close - Heat/hot water
Entire building
Jan 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2023 · Apt 22B
Close - Heat/hot water
Entire building
Jan 10, 2023 · Apt BLDG
Close - Plumbing
Water supply
Jan 10, 2023 · Apt BLDG
Close - Water leak
Slow leak
Jan 10, 2023 · Apt 20B
Close - Heat/hot water
Apartment only
Jan 9, 2023 · Apt 30H
Close - Heat/hot water
Entire building
Jan 9, 2023 · Apt 17A
Close - Heat/hot water
Entire building
Jan 9, 2023 · Apt BLDG
Close - Water leak
Slow leak
Dec 31, 2022 · Apt 16B
Close - Unsanitary condition
Garbage/recycling storage
Nov 17, 2022 · Apt 17A
Close - Plumbing
Basin/sink
Sep 5, 2022 · Apt 11J
Close - Unsanitary condition
Sewage
Sep 5, 2022 · Apt 11J
Close - Water leak
Heavy flow
Sep 5, 2022 · Apt 11J
Close - Electric
Power outage
Aug 6, 2022 · Apt 31J
Close - Electric
Outlet/switch
Jun 28, 2022 · Apt 31J
Close - Heat/hot water
Entire building
Feb 24, 2022 · Apt BLDG
Close - Water leak
Slow leak
Feb 1, 2022 · Apt 11D
Close - Door/window
Window frame
Feb 1, 2022 · Apt 11D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2016
- Floors
- 39
- Residential units
- 251
- Building area
- 321,691 ft²
- Lot area
- 22,219 ft²
- Zoning
- C2-8
- Community board
- 104
- Council district
- 3
- Block / lot
- 708 / 20
- Assessed value
- $62,493,300
- Landmark / historic district
- No
HPD registration #144646, last renewed Aug 27, 2025.
Questions about 515 West 36 Street
Who owns 515 West 36 Street?
The owner of record in NYC Department of City Planning PLUTO data is Hudson 36 LLC.
Does 515 West 36 Street have violations?
Yes. NYC HPD has recorded 35 housing violations at this property.
Is 515 West 36 Street rent stabilized?
NYC Department of Finance tax bills listed 63 rent-stabilized units here in 2024 (about 25% of its 251 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 515 West 36 Street built?
City records list 2016 as the year it was built.
How many apartments are in 515 West 36 Street?
It has 251 residential units and 253 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.