303 10 Avenue
Manhattan, NY 10001BBL 1-00699-0033Map
Owner of record: 303-309 10th Ave LLC
303 10 Avenue is an elevator apartment building built in 2008 in Manhattan, 10001. It has 89 residential units across 13 floors. The owner of record is 303-309 10th Ave LLC. HPD has recorded 12 housing violations here, most recently on May 8, 2026. City tax records listed 89 rent-stabilized apartments here in 2024.
- HPD violations
- 12
- DOB violations
- 29
- ECB violations
- 18
- HPD complaints
- 23
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 12
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ; defective hydraulic door closer at boiler room at roof story
Mar 20, 2024
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 2a, 2nd story, 1st apartment from north at east
Mar 17, 2022 · Apt 2A
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 25, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Aug 25, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 25, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Aug 25, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
Show 2 more ↓
- CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2d, 2nd story, 4th apartment from south at west
Feb 15, 2021 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked to basement at boiler room
Feb 15, 2021
Closed — Violation closed
DOB building violations · 29
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 9, 2019
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 25, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 25, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 21, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 7, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed
Show 19 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 7, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 7, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 7, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 15, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 15, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 15, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 28, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 28, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 28, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Construction other optional
Stop all work failure to safeguard public & property affected by construction operations noted: no construction fence protecting rear fire escape egress from adjacent property 309 10 ave into construction site. remedy: stop all work provide fence as permitted call excavatio n at 718 802-4594
Mar 18, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 14, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 25, 2007
Dob violation - dismissed
ECB violations · 18
- Class - 1
42g11,52m07,39x10,cl1-05a10. class 1 05a-repair altered restrictor; 52m-provide and install; 39x-repair; 42g-replace two incorrect fuses.
Feb 26, 2019 · Penalty $1,250
Resolve - Class - 1
Cu05a10; 52m07. cease use item; 05a-repair altered restrictor. 52m-provide and install.
Feb 26, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to have new or altered plumbing system tested. on 04/28/18 @ approx. 5:30pm, i observed on the 1st floor hudson market business 9 new commercial cooking stoves with new gas piping installed without full
Apr 28, 2018 · Penalty $2,500
Active - Class - 1
Gas being supplied to building without inspection and certification by dob. on 04/28/18 @ approx. 5:30pm, i observed on the 1st floor hudson market business 9 new commercial cooking stoves with new gas piping i
Apr 28, 2018 · Penalty $5,000
Active - Class - 1
Filed a certificate form, application etc., containing a material false statement(s). noted: the owner/representative made a false certifications on section #26 of pw1 job application #122071033 which was filed
Nov 15, 2017 · Penalty $4,800
Active - Class - 1
Filed a certificate form, application etc., containing a material false statement(s). noted: the owner/representative made a false certifications on section #26 of pw1 job application #122372084 which was filed
Nov 15, 2017 · Penalty $4,800
Active - Class - 2
Failure to safeguard all persons & property affected by construction operations.as reported by site safety manager,tar paper on bulkhead got fire while grinding metal.fdny called the respondent didnt take preca
May 5, 2010 · Penalty $1,200
Resolve - Class - 1
Failure to institute/maintain safety equipment measures no guardrails on roof no guardrail has been provided.the railing/parapet not in place.roofing finish work in progress.rem:provide guard rail
May 5, 2010 · Penalty $1,200
Resolve - Class - 1
Work does not conform to approved const. documents and/or approved amendments. noted: outrigger beams erected & in use on exp 3. the beam are approx 30 degrees to 40 degrees askew from facade plans show this. t
Dec 4, 2009 · Penalty $500
Resolve - Class - 1
Fail to perform a safe/proper insp of suspended scaffold.noted outrigger beams erected contrary to plans with beams not perpendicular w/facade they didnot provide opposable tie backs agg-2 condition for history
Dec 4, 2009 · Penalty $10,000
Resolve
Show 8 more ↓
- Class - 2
Operation of a crane w/o a c of o onsite inspection no signed 10e onsite engineers drawing for crane set up
May 28, 2009 · Penalty $2,400
Resolve - Non-hazardous
Sec.27-1009 failure to safeguard public and property affected by construction operation noted no vibration monitoring for 311 loav appl 110087432 stop all work remedy: maintain safeguard provide engineering
Mar 14, 2008
Resolve - Hazardous
Job site fence defective fence accross 9 ave is leaning over onto a public sidewalk remedy: repair replace fence
Feb 20, 2008 · Penalty $5,000
Resolve - Hazardous
Failure to post permit for work at premises.demo appl # 104652332 no permit posted for construction fence.remedy post permit for work at premises.
Oct 2, 2007 · Penalty $625
Resolve - Hazardous
Sec-27-1021c job site fence defected.defects noted:4 sec.of fence at front exposure # 1 is leaning onto sidewalk at exposure #2 rear sec. offence collapsed & open to entry.remedy repair & or replace fence
Oct 2, 2007 · Penalty $500
Resolve - Hazardous
Failure to carry out demo operations in a safe & proper manner. defects noted wall adj to north side of property damaged by demo work, loosebricks holes 6-8" deep noted damaged area was backfilled w/ brick
Apr 11, 2007 · Penalty $5,000
Resolve - Non-hazardous
Failure to post permit for work at premises. demo appl #104652332 no permit posted for construction fence. remedy:post permit for work at premises.
Apr 11, 2007 · Penalty $250
Resolve - Non-hazardous
Failure to post contractor's sign.remedy:post contractor's sign.
Apr 11, 2007 · Penalty $1,000
Resolve
Complaints
- Electric
Lighting
Jan 31, 2026 · Apt 6A
Close - Heat/hot water
Entire building
Jun 26, 2025 · Apt 12C
Close - Unsanitary condition
Pests
Jul 19, 2023 · Apt 2H
Close - Paint/plaster
Ceiling
Jan 23, 2023 · Apt 3A
Close - Heat/hot water
Entire building
Jan 22, 2023 · Apt BLDG
Close - Plumbing
Water supply
Jan 22, 2023 · Apt BLDG
Close - Water leak
Slow leak
Dec 8, 2021 · Apt 3N
Close - Flooring/stairs
Floor
Dec 8, 2021 · Apt 3N
Close - Unsanitary condition
Mold
Dec 8, 2021 · Apt 3N
Close - Paint/plaster
Wall
Dec 8, 2021 · Apt 3N
Close
Show 13 more ↓
- Door/window
Door
Dec 8, 2021 · Apt 3N
Close - Paint/plaster
Wall
Dec 8, 2021 · Apt 3N
Close - Heat/hot water
Apartment only
Feb 11, 2021 · Apt 2D
Close - Heat/hot water
Entire building
Dec 18, 2020 · Apt 4B
Close - Heat/hot water
Entire building
Nov 13, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2019 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D8)
- Year built
- 2008
- Floors
- 13
- Residential units
- 89
- Building area
- 101,000 ft²
- Lot area
- 9,875 ft²
- Zoning
- C6-3
- Community board
- 104
- Council district
- 3
- Block / lot
- 699 / 33
- Assessed value
- $13,837,500
- Landmark / historic district
- No
HPD registration #143306, last renewed Aug 25, 2025.
Questions about 303 10 Avenue
Who owns 303 10 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 303-309 10th Ave LLC.
Does 303 10 Avenue have violations?
Yes. NYC HPD has recorded 12 housing violations at this property.
Is 303 10 Avenue rent stabilized?
NYC Department of Finance tax bills listed 89 rent-stabilized units here in 2024 (about 100% of its 89 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 303 10 Avenue built?
City records list 2008 as the year it was built.
How many apartments are in 303 10 Avenue?
It has 89 residential units and 91 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.