208 West 10 Street

Manhattan, NY 10014BBL 1-00619-0056Map

Owner of record: 210 West 10th I LLC

208 West 10 Street is a walk-up apartment building built in 1911 in Manhattan, 10014. It has 39 residential units across 6 floors. The owner of record is 210 West 10th I LLC. HPD has recorded 297 housing violations here, most recently on July 15, 2026. 3 of the 50 most recent violations are still open. City tax records listed 7 rent-stabilized apartments here in 2024.

HPD violations
297
DOB violations
20
ECB violations
15
HPD complaints
426

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Jul 15, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
7
About 18% of the building's 39 apartments
Down from 8 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 297

  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at center stack at front of building at fire escape

    Jul 15, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at entrance door to building

    Jul 15, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective ...door and frame at bulkhead to the roof

    May 20, 2026

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 6b, 6th story, 2nd apartment from north at east

    Dec 31, 2025 · Apt 6B

    Open — Invalid certification
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 6b, 6th story, 2nd apartment from north at east

    Dec 31, 2025 · Apt 6B

    Open — Invalid certification
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeds the maximum allowable operating temperature of 130 degrees, 167 degrees found at fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east

    Nov 13, 2024 · Apt 1A

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of a metal ladder, mop and bucket and other household items at public hall, 1st story

    Mar 5, 2024

    Closed — Violation dismissed
Show 40 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at entrance door to cellar

    Mar 5, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6d, 6th story, 2nd apartment from east at south

    Mar 5, 2024 · Apt 6D

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective spring balance at upper window sash at north in the kitchen located at apt 6g, 6th story, 1st apartment from west at north

    Oct 18, 2023 · Apt 6G

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 6g, 6th story, 1st apartment from west at north

    Oct 18, 2023 · Apt 6G

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6g, 6th story, 1st apartment from west at north

    Oct 18, 2023 · Apt 6G

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 6g, 6th story, 1st apartment from west at north

    Oct 18, 2023 · Apt 6G

    Closed — Violation closed
  • A

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the private hallway located at apt 6g, 6th story, 1st apartment from west at north

    Oct 18, 2023 · Apt 6G

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchen located at apt 6g, 6th story, 1st apartment from west at north

    Oct 18, 2023 · Apt 6G

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 6g, 6th story, 1st apartment from west at north

    Oct 18, 2023 · Apt 6G

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 6g, 6th story, 1st apartment from west at north

    Oct 18, 2023 · Apt 6G

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Aug 9, 2023

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Aug 9, 2023

    Closed — Violation dismissed
  • B

    Provide wire mesh screen skylight at bulkhead , 6th story

    Aug 9, 2023

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electircal wires at east wall in the 3rd room from east located at apt 6g, 6th story, 1st apartment from west at north

    Aug 2, 2023 · Apt 6G

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3d, 3rd story, 2nd apartment from east at south

    Aug 2, 2023 · Apt 3D

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 3d, 3rd story, 2nd apartment from east at south

    Aug 2, 2023 · Apt 3D

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective bricks at exterior south wall at 3rd story, west yard

    Aug 2, 2023

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective bricks at exterior south wall in 2nd story, west yard

    Aug 2, 2023

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective bricks at exterior south wall at 1 story, west yard

    Aug 2, 2023

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of uncapped gas pipe in the kitchen located at apt 3f, 3rd story, 2nd apartment from south at west

    Aug 2, 2023 · Apt 3F

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 2nd room from north at west located at apt 2b, 2nd story, 2nd apartment from north at east

    Aug 2, 2023 · Apt 2B

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 15, 2023

    Closed — Violation dismissed
  • A

    Paint or post a sign indicating floors at west wall at public hall, 1st story

    Oct 9, 2022

    Closed — Violation dismissed
  • A

    Paint or post a sign indicating floors at west wall at public hall, 2nd story

    Oct 9, 2022

    Closed — Violation dismissed
  • A

    Paint or post a sign indicating floors at west wall at public hall, 3rd story

    Oct 9, 2022

    Closed — Violation dismissed
  • A

    Paint or post a sign indicating floors at west wall at public hall, 4th story

    Oct 9, 2022

    Closed — Violation dismissed
  • A

    Paint or post a sign indicating floors at west wall at public hall, 5th story

    Oct 9, 2022

    Closed — Violation dismissed
  • A

    Paint or post a sign indicating floors at west wall at public hall, 6th story

    Oct 9, 2022

    Closed — Violation dismissed
  • C

    Provide in the event of a power outage by means of an acceptable heavy duty lock and latch set at vestibule door at public hall, 1st story

    Oct 9, 2022

    Closed — Violation closed
  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic lockset installed at top of vestibule door at public hall, 1st story

    Oct 9, 2022

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items at public hall, 6th story

    Oct 9, 2022

    Closed — Violation closed
  • B

    Provide metal screen under skylight at roof bulkhead at public hall stairs, 6th story

    Oct 9, 2022

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the 1st room from north at west located at apt 3f, 3rd story, 2nd apartment from south at west

    Oct 9, 2022 · Apt 3F

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 6b, 6th story, 2nd apartment from north at east

    Oct 9, 2022 · Apt 6B

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 6b, 6th story, 2nd apartment from north at east

    Oct 9, 2022 · Apt 6B

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 6d, 6th story, 2nd apartment from east at south

    Oct 2, 2022 · Apt 6D

    Closed — Violation closed
  • B

    Replace with new the missing safety cap at electrical outlet at west wall at public hall, 5th story

    Oct 2, 2022

    Closed — Violation closed
  • B

    Replace with new the missing safety cap at electrical outlet at west wall at public hall, 4th story

    Oct 2, 2022

    Closed — Violation closed
  • B

    Replace with new the missing safety cap at electrical outlet at west wall at public hall, 2nd story

    Oct 2, 2022

    Closed — Violation closed
  • A

    Replace with new the missing safety cap at electrical outlet at west wall at public hall, 3rd story

    Oct 2, 2022

    Closed — Violation closed

DOB building violations · 20

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 11, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 26, 2024

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Aug 17, 2017

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Aug 17, 2017

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Aug 17, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 31, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 5, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 15, 2014

    Dob violation - dismissed
  • Emergency none

    Egncy-emergency none

    Aug 7, 2012

    Dob violation - active
  • Emergency none

    Also associated with violation #34993153l

    Aug 7, 2012

    Dob violation - dismissed
Show 10 more ↓
  • Landmark none

    Landmk-landmark none

    May 17, 2011

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 31, 2000

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Aug 16, 2000

    Dob violation - active
  • Landmark none

    Landmk-landmark none

    Jun 28, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Oct 1, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jun 7, 1990

    Dob violation - dismissed
  • Landmark none

    Landmrk-landmark none

    Mar 6, 1987

    Dob violation - dismissed

ECB violations · 15

  • Class - 2

    I observed interior alteration at cellar level, installed and completed bedroom, bathroom, and staircase opening connecting the 1st fl. apt 1b, creating a duplex apt, two existing windows opening changed to exi

    Jan 8, 2025 · Penalty $1,250

    Resolve
  • Class - 1

    Work without a permit. noted: observed in apt 1b ongoing construction activity, work inlcudes installation of new bx cable in ceiling. work is approx. 6% to completion. no permit on file according to dob record

    Sep 24, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    Work without a permit. noted: observed in apt 1b ongoing construction activity, work includes installation of waste pipes, and hot/cold pipes in the kitchen area in work is 60% completion-no permit on file acco

    Sep 24, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    Filed a certificate,form,application etc. containing a material false statement(s) the work proposed in application #122580199 requires pw1 plan/work approval application. rmdy: comply with code.

    Jan 25, 2017

    Resolve
  • Class - 1

    Work w/o permit @time of inspection 8:52am @address above i observed in cellar installed the new gas piping to 1st flr restorant connected to 3commercial appliances.no permits.rem:obtain permit or restore premi

    Jul 15, 2016 · Penalty $800

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner:lack of a system of automatic sprinklers where required per bc 903.2,27-954.@time of inspection 8:52am @address above i observed on 1st flr in kitchen area 2 sp

    Jul 15, 2016 · Penalty $250

    Resolve
  • Class - 1

    Electrical work w/o permit. observed in ground floor lobby wires hanging from ceiling outlet & connected to rubber pigtail socket. open exposed hanging wires hazardous. remedy: obtain permit/comply w/ec code.

    Mar 3, 2016 · Penalty $800

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway. defects noted: at time of inspection both fire escape at rear of building are obstructed byflower pots on platforms & stairs. window a/c units are also obstructi

    Aug 1, 2012 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to maintain building walls or appurtenances defects noted: at time of inspection parapet wall. at wall exposures are leaning out of plumb. front parapet exposure #1 is leaning outward towards street,at

    Aug 1, 2012 · Penalty $1,000

    Resolve
  • Hazardous

    Work w/o permit. work noted: demolition of partitions bathroom, kitchen change position of entrance door ceiling demolition on 5th floor apt 5 e. remedy: obtain permit

    Feb 26, 2002

    Resolve
Show 5 more ↓
  • Non-hazardous

    Work w/o permits, work noted : in apt 5e gut / demo of bathrm walls, removal of partition wall separating livingrm. also noted : creating new door opening ( entrance door ) approx 3 1/2' x 7 1/2' and installed

    Feb 8, 2002 · Penalty $250

    Resolve
  • Hazardous

    4b. low water cut off would not shut down bolier. boiler shut down and sealed due to unsafe condition.

    Jan 19, 2000 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work without a permit. noted: new wooden store front installed & all work complete at time of inspection. no permit posted. no plans available. space vacant at time of inspection. loacation: east/side comm

    Apr 30, 1998 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work without a permit work noted demo apt 4e and erect new bathroom and plumbing electrical work being done remedy stop all work obtain a permit or restore to prior legal condition.

    Dec 24, 1996 · Penalty $1,000

    Resolve
  • Non-hazardous

    Section of metal ornament of front facade north wall above 6th floor window is loose and in danger of falling,creating a hazardous conditi-on for pedestrian & properties.remedy:make all necessary repairs fortw

    Jun 7, 1990 · Penalty $720

    Resolve

Complaints

  • Plumbing

    Basin/sink

    Sep 16, 2026 · Apt 5E

    Open
  • Unsanitary condition

    Garbage/recycling storage

    Sep 7, 2026 · Apt BLDG

    Open
  • Unsanitary condition

    Pests

    Jul 8, 2026 · Apt 1C

    Close
  • Unsanitary condition

    Pests

    Jun 9, 2026 · Apt 1D

    Close
  • Unsanitary condition

    Pests

    Jun 1, 2026 · Apt 1C

    Close
  • Unsanitary condition

    Pests

    Jun 1, 2026 · Apt 1C

    Close
  • Water leak

    Slow leak

    Apr 17, 2026 · Apt 5A

    Close
  • Outside building

    Roof door/hatch

    Apr 14, 2026 · Apt 6G

    Close
  • Electric

    No lighting

    Dec 29, 2025 · Apt 6B

    Close
  • Electric

    Lighting

    Dec 29, 2025 · Apt 6B

    Close
Show 40 more ↓
  • Unsanitary condition

    Garbage/recycling storage

    Dec 16, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Dec 16, 2025 · Apt LOBBY

    Close
  • Electric

    Wiring

    Dec 2, 2025 · Apt 6B

    Close
  • Appliance

    Refrigerator

    Aug 11, 2025 · Apt 5D

    Close
  • Heat/hot water

    Entire building

    Apr 21, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 21, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 24, 2025 · Apt BLDG

    Close
  • Electric

    No lighting

    Jan 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 23, 2025 · Apt 3C

    Close
  • General

    Bell/buzzer/intercom

    Dec 4, 2024 · Apt 6G

    Close
  • Water leak

    Slow leak

    Dec 4, 2024 · Apt 6G

    Close
  • Heat/hot water

    Entire building

    Nov 28, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 28, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Nov 27, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 27, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Nov 27, 2024 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Nov 27, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 20, 2024 · Apt 5D

    Close
  • Plumbing

    Water supply

    Nov 12, 2024 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Nov 12, 2024 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Oct 28, 2024 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2024 · Apt BLDG

    Close
  • Door/window

    Door

    Sep 3, 2024 · Apt 6F

    Close
  • Water leak

    Heavy flow

    Aug 24, 2024 · Apt 5D

    Close
  • Heat/hot water

    Entire building

    Apr 7, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 10, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 16, 2023 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Oct 11, 2023 · Apt 6G

    Close
  • Electric

    Wiring

    Oct 11, 2023 · Apt 6G

    Close
  • Paint/plaster

    Cabinet

    Oct 11, 2023 · Apt 6G

    Close
  • Flooring/stairs

    Floor

    Oct 11, 2023 · Apt 6G

    Close
  • Flooring/stairs

    Floor

    Oct 11, 2023 · Apt 6G

    Close
  • General

    Bell/buzzer/intercom

    Oct 11, 2023 · Apt 6G

    Close
  • Door/window

    Window frame

    Oct 11, 2023 · Apt 6G

    Close
  • Heat/hot water

    Entire building

    Oct 9, 2023 · Apt BLDG

    Close
  • Door/window

    Door frame

    Sep 9, 2023 · Apt 6F

    Close
  • Door/window

    Door

    Sep 9, 2023 · Apt 6F

    Close
  • Paint/plaster

    Ceiling

    Aug 28, 2023 · Apt 3A

    Close
  • Flooring/stairs

    Floor

    Jul 27, 2023 · Apt 4I

    Close
  • Plumbing

    Toilet

    Mar 27, 2023 · Apt 3D

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1911
Floors
6
Residential units
39
Building area
22,005 ft²
Lot area
5,105 ft²
Zoning
C1-6
Community board
102
Council district
3
Block / lot
619 / 56
Assessed value
$3,991,500
Landmark / historic district
Greenwich Village Historic District

HPD registration #122600, last renewed Sep 19, 2024.

Questions about 208 West 10 Street

Who owns 208 West 10 Street?

The owner of record in NYC Department of City Planning PLUTO data is 210 West 10th I LLC.

Does 208 West 10 Street have violations?

Yes. NYC HPD has recorded 297 housing violations at this property.

Is 208 West 10 Street rent stabilized?

NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 18% of its 39 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 208 West 10 Street built?

City records list 1911 as the year it was built.

How many apartments are in 208 West 10 Street?

It has 39 residential units and 41 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.