25 Cornelia Street
Manhattan, NY 10014BBL 1-00590-0043Map
Owner of record: New Jht Corp.
25 Cornelia Street is a walk-up apartment building built in 1903 in Manhattan, 10014. It has 32 residential units across 6 floors. The owner of record is New Jht Corp.. HPD has recorded 16 housing violations here, most recently on November 15, 2018. 4 of the 16 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 16
- DOB violations
- 12
- ECB violations
- 9
- HPD complaints
- 40
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 16
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story
Nov 15, 2018
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby, 1st story
Aug 8, 2017
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor , at lobby, 1st story
Aug 8, 2017
Open — Nov sent out - ANon-hazardous
Paint or post a sign indicating floors at all stories at public hall
Aug 8, 2017
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceilings thru-out in the entire apartment located at apt 24, 6th story, 1st apartment from west at north
Jun 2, 2004 · Apt 24
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls thru-out in the entire apartment located at apt 24, 6th story, 1st apartment from west at north
Jun 2, 2004 · Apt 24
Closed — Violation closed - BHazardous
Remove the torn and/or loose floor covering , in the entire apartment located at apt 24, 6th story, 1st apartment from west at north
Jun 2, 2004 · Apt 24
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 24, 6th story, 1st apartment from west at north
Jun 2, 2004 · Apt 24
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of household items blocking egress to fire escape in the 2nd room from east located at apt 24, 6th story, 1st apartment from west at north
Jun 2, 2004 · Apt 24
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening slide bolt capable of being locked in the entire apartment located at apt 9, 3rd story, 1st apartment from north at east
May 24, 2003 · Apt 9
Closed — Violation closed
Show 6 more ↓
- CImmediately hazardous
Provide an adequate supply of gas to the fixtures kitchen in the entire apartment located at apt 9, 3rd story, apartment at east
Apr 3, 2002 · Apt 9
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room, cellar
Mar 25, 2002
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at stove in the kitchen located at apt 9, 3rd story, 1st apartment from east at south
Oct 29, 2001 · Apt 9
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling east wall & door frame 2 sty center east apt 4 west room barry 233 8377 er1. , section '' ''
Mar 3, 1992 · Apt 4
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint west wall 2 sty center east apt 4 south room er1. , section '' ''
Mar 3, 1992 · Apt 4
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling east wall west wall 2 sty center east apt 4 kitchen er1. , section '' ''
Mar 3, 1992 · Apt 4
Closed — Violation closed
DOB building violations · 12
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed
Show 2 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 9
- Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 10000077847n0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Jul 1, 2025 · Penalty $3,125
Active - Class - 1
Failure to have new or altered plumbing system tested i observed in apartment d in cellar installed water valves under the sink in kitchen area also installed three piece bathroom and gas line for a gas stove t
Jun 22, 2022 · Penalty $2,500
Active - Class - 1
Gas being supplied to building without inspection and certification by dob i observed in apartment d in the cellar gas supplying gas stove without certification by dob, file for required permits and have necess
Jun 22, 2022 · Penalty $5,000
Active - Class - 1
Work without a permit i observed in apartment d in cellar installed water valves under the sink in kitchen area also installed three piece bathroom and gas line for a gas stove work done 100 percent, obtain per
Jun 22, 2022 · Penalty $2,500
Active - Class - 2
Failure to maintain exterior bldg facade and appurtenances. note:exp1,south elevation: flower pots stored at fire escape (ii) exp 4,east elevation: spall/damaged masonry brick. *no amended report file as of 01/
Jan 14, 2017 · Penalty $250
Resolve - Non-hazardous
Failure to provide approved set of plans sat time of inspection.noted:renovation of apts e and d apt d gut demo with exposed fire stopping.apt e completion of relocation of kitchen.remedy:stop all work,provide
May 15, 2001 · Penalty $130
Resolve - Non-hazardous
Work without a permit. work noted: at apartment #10 3rd floor, total renovation with new walls, ceiling, floors, electrical and plumbing. 80% of work done. stop all work. remedy: stop all work, obtain all
Jul 27, 1999 · Penalty $500
Resolve - Non-hazardous
Exit passageway obstructed (hazardous). where as rear & side fire passageway obstructed by construction debris. debris also obstructingegress from fire escape creating a hazardous condition to tenants.
Oct 9, 1998 · Penalty $480
Resolve - Hazardous
Exit passageway totally obstructed (hazardous) where as - west side passageway is totally distructed by construction debris & household debris. passageway is secondary means of egress for fireescapeat w/sid
Jan 4, 1994 · Penalty $475
Resolve
Complaints
- Unsanitary condition
Pests
Oct 10, 2026 · Apt 23
Open - Water leak
Slow leak
Oct 10, 2026 · Apt 23
Open - Paint/plaster
Ceiling
Oct 10, 2026 · Apt 23
Open - Plumbing
Steam pipe/riser
Oct 10, 2026 · Apt 23
Open - Paint/plaster
Wall
Oct 10, 2026 · Apt 23
Open - Heat/hot water
Entire building
Oct 25, 2025 · Apt 5
Close - Heat/hot water
Entire building
Jan 16, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2022 · Apt 19
Close - Heat/hot water
Entire building
Nov 15, 2018 · Apt ALL
Close - Heat/hot water
Entire building
Nov 15, 2018 · Apt BLDG
Close
Show 30 more ↓
- Heat/hot water
Entire building
Nov 14, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 13, 2018 · Apt 19
Close - Heat/hot water
Entire building
Oct 26, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 26, 2018 · Apt 5
Close - Heat/hot water
Entire building
Dec 2, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2017 · Apt 28
Close - Heat/hot water
Entire building
Nov 8, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 7, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 7, 2017 · Apt 12
Close - General
Floor
Jun 1, 2004 · Apt 24
Close - Electric
Wiring
Jun 1, 2004 · Apt 24
Close - Paint/plaster
Wall
Jun 1, 2004 · Apt 24
Close - General
Ceramic-tile
Aug 11, 2003 · Apt 9
Close - General
Ceramic-tile
Aug 11, 2003 · Apt 9
Close - Paint/plaster
Wall
Aug 11, 2003 · Apt 9
Close - Appliance
Refrigerator
Aug 11, 2003 · Apt 9
Close - General
Windows
Aug 11, 2003 · Apt 9
Close - General
Windows
Aug 7, 2003 · Apt 13
Close - Plumbing
Basin/sink
Aug 7, 2003 · Apt 13
Close - Plumbing
Toilet
Aug 7, 2003 · Apt 13
Close - Paint/plaster
Ceiling
Aug 7, 2003 · Apt 13
Close - Paint/plaster
Wall
Jun 16, 2003 · Apt 9
Close - General
Ceramic-tile
Jun 16, 2003 · Apt 9
Close - Plumbing
Shower-stall
Jun 16, 2003 · Apt 9
Close - Paint/plaster
Ceiling
Jun 16, 2003 · Apt 9
Close - Electric
Wiring
Jun 16, 2003 · Apt 9
Close - Paint/plaster
Wall
Jun 16, 2003 · Apt 9
Close - Paint/plaster
Wall
May 12, 2003 · Apt A
Close - General
Windows
May 12, 2003 · Apt A
Close - Heating
Heat related
Feb 27, 2003 · Apt 9
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1903
- Floors
- 6
- Residential units
- 32
- Building area
- 17,826 ft²
- Lot area
- 4,095 ft²
- Zoning
- R6
- Community board
- 102
- Council district
- 3
- Block / lot
- 590 / 43
- Assessed value
- $3,164,400
- Landmark / historic district
- Greenwich Village Historic District Extension II
HPD registration #105938, last renewed Sep 16, 2025.
Questions about 25 Cornelia Street
Who owns 25 Cornelia Street?
The owner of record in NYC Department of City Planning PLUTO data is New Jht Corp..
Does 25 Cornelia Street have violations?
Yes. NYC HPD has recorded 16 housing violations at this property.
Is 25 Cornelia Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 19% of its 32 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 25 Cornelia Street built?
City records list 1903 as the year it was built.
How many apartments are in 25 Cornelia Street?
It has 32 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.