roofy

21 East 12 Street

Manhattan, NY 10003BBL 1-00570-7503Map

Owner of record: Unavailable Owner

21 East 12 Street is a condominium built in 2016 in Manhattan, 10003. It has 51 residential units across 23 floors. The owner of record is Unavailable Owner. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
13
ECB violations
15
HPD complaints
2

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 13

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2020

    Jun 20, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 27, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 27, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 27, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 27, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 18, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 18, 2019

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Aug 1, 2018

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Aug 1, 2018

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Jun 13, 2017

    Vp*-violation unserved ecb- dismissed
Show 3 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 10, 2016

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2016

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2016

    Dob violation - dismissed

ECB violations · 15

  • Class - 1

    Sec. 3301.1.3 manufacturer specifications. at time of inspection observed active site. 2 workers was working at 1st fl had loaded a sheetrock dolly(a frame)they were(tripped)over injuried for over loaded & obse

    Aug 1, 2018

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affect by construction operations. at time of inspection observed active job site. 2 workers brian wilson & junior young had loaded a sheetrock dolly(a frame)w/4"x8"

    Aug 1, 2018

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments. at time of inspection crane was not set up as per approved blueprints or amendments. crane was set up north of approved draw

    Jan 30, 2018

    Resolve
  • Class - 1

    Crane phones do not show pertinent features and actual site conditionsrequired to be shown on these documetns for crane use. the crane placement under cn 952/17 does not conform to approved plans. the nys licen

    Jan 30, 2018 · Penalty $1,600

    Resolve
  • Class - 1

    38i11,100i11-38i11)replace damaged power cable. 100i11)replace damagedtrolley hoist, needs to be inspected before hoist is returned to service.

    Dec 13, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to safe guard public & property. in response to an incident where it was reported that a worker was injured when a reshore had become dislodged & struck him in the shoulder, upon further insp i was info

    Jun 13, 2017 · Penalty $5,000

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and or approved amendments.note:at the time of inspection of a 23 story building atpartial foundation and 1st flr level,construction work in progress.i o

    May 8, 2017 · Penalty $250

    Resolve
  • Class - 1

    Failure to protec the sides of excavation. noted: job#121187241, exp 03/01/17. at exp#1,observed sheer cut of apprx 8'to 10' feet in depth with no sheeting or shoring in place and 4 workmen installing lagging

    May 17, 2016 · Penalty $2,400

    Resolve
  • Class - 2

    Bc3304.4.4 failure to provide 3'x6"guradrails around open and excessible excavation. noted: job #121187241,exp 03/01/17. at exp#1 inadequate and missing guardrails were observed.also no toeboards noted.rmdy:pr

    May 17, 2016 · Penalty $400

    Resolve
  • Class - 1

    Sec. 3306.9*.8.3 glass-prior to(commandment)of demo operations,all glass to be removed. note: active demolition job site demo in progress,at the 4th fl/roof level,(men)removing walls & debris with mechanical

    Nov 9, 2015 · Penalty $1,600

    Resolve
Show 5 more ↓
  • Class - 1

    Sec. 3314.3.1 supported scaffolds & outrigger scaffolds. note: demolition jobsite,active operattions 4th fl/roof & 2-3 floors. at the 2nd flobserved supported scaffold erected on needle beam,i observed only 1

    Nov 9, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. note: active demolition jobsite work at 4th fl roof level 3,2nd fl. the lighting at the 2nd & 3rd fl was not in place floors were

    Nov 9, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Work w/o a permit-sprinkler removal/ note: active demolition jobsite,at the 4th fl level/roof observed demo in progress. observed sprinkler line has been partial demolished,left in a hanging position. there is

    Nov 9, 2015 · Penalty $400

    Resolve
  • Class - 1

    Failure to adequately supervise work at demolition site,so as to maintain a safe site & ensure compliance w/approved construction documents & chapter 33(safeguards during construction demolition). the following

    Nov 9, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3301.2 safety measures & standards. note: observed active demolition jobsite observed debris being dropped from 4th fl/roof level,through elevator shift to the ground level. there was none of the required

    Nov 9, 2015 · Penalty $1,200

    Resolve

Complaints

  • Flooring/stairs

    Stairs

    Aug 21, 2026 · Apt 19

    Close
  • Heating

    Heat related

    Jan 10, 2004 · Apt 31

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
2016
Floors
23
Residential units
51
Building area
143,044 ft²
Lot area
19,067 ft²
Zoning
C1-7
Community board
102
Council district
2
Block / lot
570 / 7503
Assessed value
$24,228,090
Landmark / historic district
No

HPD registration #144766, last renewed Aug 21, 2025.

Questions about 21 East 12 Street

Who owns 21 East 12 Street?

The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.

Does 21 East 12 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 21 East 12 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 21 East 12 Street built?

City records list 2016 as the year it was built.

How many apartments are in 21 East 12 Street?

It has 51 residential units and 54 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.