24 East 13 Street
Manhattan, NY 10003BBL 1-00570-0017Map
Owner of record: 26 East 13th Street LLC
24 East 13 Street is an elevator apartment building built in 1910 in Manhattan, 10003. It has 24 residential units across 6 floors. The owner of record is 26 East 13th Street LLC. HPD has recorded 13 housing violations here, most recently on October 13, 2026. 5 of the 13 most recent violations are still open.
- HPD violations
- 13
- DOB violations
- 18
- ECB violations
- 15
- HPD complaints
- 32
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 13
- BHazardous
Properly repair or replace the broken or defective buzzer and return voice intercom system from building entrance door up to panel at east wall in the private hallway located at apt 4f, 4th story, 2nd apartment from east at south
Oct 13, 2026 · Apt 4F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4f, 4th story, 2nd apartment from east at south
Oct 13, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4f, 4th story, 2nd apartment from east at south
Oct 13, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4f, 4th story, 2nd apartment from east at south
Oct 13, 2026 · Apt 4F
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum of 100 watts as required(light fixture(s) present). at front areaway
Sep 24, 2017
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... north wall approximately 10 square feet in the 1st room from north located at apt 6f, 6th story, 2nd apartment from east at south
Mar 13, 2013 · Apt 6F
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak ceiling and north wall when it rains in the 1st room from north located at apt 6f, 6th story, 2nd apartment from east at south
Mar 13, 2013 · Apt 6F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 2nd room from north located at apt 6f, 6th story, 2nd apartment from east at south
Mar 13, 2013 · Apt 6F
Closed — Violation dismissed
Show 3 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north located at apt 6g, 6th story, 1st apartment from south at west
Aug 25, 2012 · Apt 6G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at loft in the 2nd room from north located at apt 6g, 6th story, 1st apartment from south at west
Aug 25, 2012 · Apt 6G
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen & bathroom fixtures 3 sty west apt 3e er1. , section '' ''
Dec 3, 1990 · Apt 3E
Open — Nov sent out
DOB building violations · 18
- Immediate emergency anythingoptional
Extend existing sidewalk shed to approximately 60 linear feet along exposure#1 (east 13 street) to safeguard public and property
May 16, 2022
Dob violation - dismissed - Construction other optional
At time of inspection observed 2-terra-cotta pedestals missing on 5th floor ornamental balcony railing and fell on to pedestrians sidewalk at expo # 01. remaining 4-pedestals crack, loose and disrepair conditions.
May 13, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 18, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 18, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 3, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 6, 2010
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 7, 2008
Dob violation - resolved
Show 8 more ↓
- Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 5, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 22, 2006
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatorrequired
1p30517
May 6, 1999
Dob violation - resolved - Elevator elevatorrequired
(74)repair cab fan
Jul 20, 1989
Dob violation - resolved - Elevator elevatorrequired
(71)reapir car fan
Jul 20, 1989
Dob violation - resolved
ECB violations · 15
- Class - 2
Atoi observed construction work being performed( 1st through 3rd fl) at approx. 9:30am failure to post tpp notices throughout the occupied floors 4 through 6 in building. while work is being done on the below f
Aug 3, 2026
Resolve - Class - 1
Atoi approx. 9am, observed failure to maintain adequate housekeeping throughout construction site: 1st -3rd floor. observed piles of construction debri bags, pile of construction debri, stacks 2x4s, demoed mate
Aug 3, 2026 · Penalty $2,500
Active - Class - 1
Atoi approx. 9:05am observed failure to safeguard properly. exposed flooring at mezzanine level to lower floor, where workers were observed actively performing tasks underneath exposed opening area. under job#
Aug 3, 2026 · Penalty $10,000
Active - Class - 2
No certificate of correction on file for violation #39062140z issued on 5/13/22 for failure to maintain building in a code-compliant manner.remedy: file a certificate of correction.
Sep 25, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain sidewalk deck as per code requirements 3307.6.5.5 materials stored on deck, and 3307.6.5.6 found sharp edges pose a danger to public on the passageway, creating hazardous of overload the str
Jan 13, 2025 · Penalty $2,400
Resolve - Class - 1
At time of inspection observed 2-terra-cotta pedestals missing on 5th floor ornamental balcony railing and fell on to pedestrians sidewalk at expo # 01. remaining 4-pedestals crack, loose and disrepair conditio
May 13, 2022 · Penalty $25,000
Active - Class - 1
230.79,rating of service disconnecting means.the service disconnectingmeans shall have a rating not less than the calculated load to be carried,determined in accordance w/part iii,iv or v of article 220,or 240.
Feb 26, 2014 · Penalty $800
Resolve - Class - 1
240.12,electrical system coordination.where an orderly shutdown is required to minimize the hazard to personnel&equipment,a system of coord ination based on the following 2 conditions.(1)coordination short circ
Feb 26, 2014
Resolve - Class - 2
Electrical work w/o a permit. bsmt service equipment: 600 amp service switch square d, 1 set of 500mcm service entrance conductor. "please note" this app does not covered the above work m343035.rmdy:obtain per
Feb 26, 2014 · Penalty $400
Resolve - Class - 1
Size of alternating - current grounding electrode conductor. the size of the grounding electrode conductor at the service at each building or structure where supplied by a feeder(s) or at a separately derived
Feb 26, 2014 · Penalty $400
Resolve
Show 5 more ↓
- Class - 2
Unapproved/unsafe/unsuitable electrical equipment,apparatus,materials,devices,appliances or wiring in use.bsmt electrical room:defective open wiring are in use, 119 boxes not properly supported,armored cables
Feb 26, 2014 · Penalty $400
Resolve - Non-hazardous
B4a,30a,16,50,a,b,c,32a,42,45a/b,36. 50-lock on rear door of mobile boiler missing. 50a-sail switch on fresh air fan missing. 50b-back flow preventer missing. 50c-coil safety not piped down.
Sep 6, 2006 · Penalty $180
Resolve - Non-hazardous
Occupancy contrary to that allowed by the c of o:#74804.temp.expire 11-1-74.mezzanine level at 2nd floor change from rec room to physional cult estatewith 3fl added premises non as c.1.2.3.fl.remedy:discontinu
Feb 28, 1996 · Penalty $800
Resolve - Non-hazardous
Failure maintain defective vent stack at the east side of building joint of angle at about 1st story of building is loose and open causing fumes of clorine from pool in cellar to escape at window in adjacent
May 18, 1992 · Penalty $230
Resolve - Non-hazardous
Failure to safety and properly remove material and debris from constrution site. debris and left over material in east breese way. remedy: remove debris and all left over material from breeseway and maintain
May 18, 1992 · Penalty $345
Resolve
Complaints
- Safety
Fire escape
Oct 21, 2026 · Apt BLDG
Open - Paint/plaster
Ceiling
Oct 14, 2026 · Apt 6E
Open - Plumbing
Water supply
Oct 12, 2026 · Apt BLDG
Close - Plumbing
Water supply
Oct 7, 2026 · Apt BLDG
Close - Safety
Fire escape
Oct 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 5, 2026 · Apt BLDG
Close - General
Cooking gas
Dec 14, 2024 · Apt BLDG
Close - General
Cooking gas
Nov 13, 2024 · Apt BLDG
Close - Paint/plaster
Ceiling
Mar 5, 2013 · Apt 6F
Close - Plumbing
Water-leaks
Mar 5, 2013 · Apt 6F
Close
Show 22 more ↓
- General
Mold
Mar 5, 2013 · Apt 6F
Close - General
Mold
Feb 25, 2013 · Apt 6F
Close - General
Mold
Jan 12, 2013 · Apt 6F
Close - Paint/plaster
Wall
Jan 12, 2013 · Apt 6F
Close - Paint/plaster
Wall
Jan 12, 2013 · Apt 6F
Close - Heating
Heat related
Nov 16, 2012 · Apt 6E
Close - Paint/plaster
Ceiling
Aug 23, 2012 · Apt 6G
Close - Paint/plaster
Ceiling
Aug 23, 2012 · Apt 6G
Close - Paint/plaster
Ceiling
Aug 23, 2012 · Apt 6G
Close - Plumbing
Water-leaks
Aug 23, 2012 · Apt 6G
Close - Plumbing
Water-leaks
Aug 23, 2012 · Apt 6G
Close - Heating
Heat related
Apr 27, 2007 · Apt 5D
Close - Heating
Heat related
Apr 25, 2007 · Apt BLDG
Close - Heating
Heat related
Apr 21, 2007 · Apt BLDG
Close - Heating
Heat related
Mar 29, 2007 · Apt 4H
Close - General
Doors
Mar 20, 2007 · Apt 4H
Close - Nonconst
Rubbish
Mar 20, 2007 · Apt 4H
Close - Plumbing
Water supply
Mar 20, 2007 · Apt 4H
Close - Heating
Heat related
Mar 14, 2007 · Apt 5D
Close - Heating
Heat related
Mar 5, 2007 · Apt 4H
Close - Heating
Heat related
Mar 5, 2007 · Apt 4H
Close - Heating
Heat related
Jan 26, 2007 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jul 17, 2026 | Non-market transfer | Rentals - elevator apartments | 25 |
Building details
- Building type
- Elevator apartment building (D9)
- Year built
- 1910
- Floors
- 6
- Residential units
- 24
- Building area
- 27,760 ft²
- Lot area
- 4,315 ft²
- Zoning
- C6-1
- Community board
- 102
- Council district
- 2
- Block / lot
- 570 / 17
- Assessed value
- $4,695,750
- Landmark / historic district
- No
HPD registration #139131, last renewed Aug 28, 2025.
Questions about 24 East 13 Street
Who owns 24 East 13 Street?
The owner of record in NYC Department of City Planning PLUTO data is 26 East 13th Street LLC.
Does 24 East 13 Street have violations?
Yes. NYC HPD has recorded 13 housing violations at this property.
Is 24 East 13 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 24 East 13 Street built?
City records list 1910 as the year it was built.
How many apartments are in 24 East 13 Street?
It has 24 residential units and 25 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.