109 East 9 Street
Manhattan, NY 10003BBL 1-00555-0040Map
Owner of record: 109e9 LLC
109 East 9 Street is an office building built in 1900 in Manhattan, 10003. It has 14 residential units across 5 floors. The owner of record is 109e9 LLC. HPD has recorded 72 housing violations here, most recently on April 29, 2026. 3 of the 50 most recent violations are still open. City tax records listed 11 rent-stabilized apartments here in 2024.
- HPD violations
- 72
- DOB violations
- 21
- ECB violations
- 22
- HPD complaints
- 78
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 72
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2e, 3rd story, 1st apartment from north at east
Nov 19, 2025 · Apt 2E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective defective handrail at east wall at public hall, 1st story
Nov 19, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor located at b-room 4c, 5th story, b-room at east
Jun 25, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective slopping wood floor at public hall, 3rd story
Jun 25, 2025
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling located at b-room 4a, 5th story, 1st b-room from south at west
Jun 25, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling located at b-room 2a, 3rd story, 1st b-room from south at west
Jun 25, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor located at b-room 4a, 5th story, 1st b-room from east at south
Jun 25, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling located at b-room 4c, 5th story, 1st b-room from north at east
Jun 25, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective slopping wood floor at public hall, 4th story
Jun 25, 2025
Open — Not complied with
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective slopping wood floor at public hall, 5th story
Jun 25, 2025
Open — Not complied with - BHazardous
Properly secure the loose handrail at public hall stairs, 3rd story
Jun 25, 2025
Closed — Violation dismissed - BHazardous
Replace with new the missing firestopping material at entire open ceiling area located at b-room 2b, 3rd story, 1st b-room from west at north
Jun 25, 2025 · Apt 2B
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of firestopping material at ceiling located at b-room, 3rd story, 1st b-room from west at north
Jun 25, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor located at b-room 2a, 3rd story, 1st b-room from south at west
Jun 25, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor located at b-room 2b, 3rd story, 1st b-room from west at north
Jun 25, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling located at b-room 2b, 3rd story, 1st b-room from west at north
Jun 25, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor located at b-room 3a, 4th story, 1st b-room from south at west
Jun 25, 2025 · Apt 3A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling located at b-room 3a, 4th story, 1st b-room from south at west
Jun 25, 2025 · Apt 3A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story
Jun 25, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 5, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 2, 2015
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 200 watts minimum required. at front areaway
Mar 23, 2000 · Apt NA
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls & ceilings public hall stairs all stories.
Mar 24, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarding walls & ceiling at public hall stairs all stories.
Mar 24, 1999
Closed — Violation closed - ANon-hazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following fixtures present lights not on night inspection.
Mar 18, 1998
Closed — Violation closed - ANon-hazardous
Paint to the satisfaction of this department the exterior window frames and sashes all stories front.
Mar 18, 1998
Closed — Violation closed - BHazardous
Properly repair the broken or defective wood tread all stys public hall.
Sep 5, 1997
Closed — Violation closed - BHazardous
Replace with new the broken or defective painted sprinklerhead 3 sty public hall
Sep 5, 1997
Closed — Violation closed - ANon-hazardous
M/d law abate the nuisance consisting of water stain ceiling 4 sty public hall.
Sep 5, 1997
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling 4 sty public hall.
Sep 5, 1997
Closed — Violation closed - ANon-hazardous
M/d law abate the nuisance consisting of water stain ceiling 4 sty southwest room4a.
Sep 5, 1997
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling 4 sty southwest room 4a.
Sep 5, 1997
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of exposed electric wiring ceiling 4 sty southwest room 4a.
Sep 5, 1997
Closed — Violation closed - BHazardous
Properly secure the loose light fixture ceiling 4 sty southwest room 4a.
Sep 5, 1997
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 5, 1997
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling all stys public halls.
Sep 5, 1997
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of protruding nails floor 4 sty southwest room 4a.
Sep 5, 1997
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling 3 4 and 5 stys public halls water damages.
Sep 5, 1997
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of water settled on roof at front.
Sep 5, 1997
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls 3 sty apt 3c. located at apt 3c
Sep 5, 1997 · Apt 3C
Closed — Violation closed - BHazardous
Properly repair the broken or defective wood floor 3 sty apt 3c. located at apt 3c
Sep 5, 1997 · Apt 3C
Closed — Violation closed
DOB building violations · 21
- Construction other optional
Requesting an engineering report due to broken walls and a broken floor exposing wood joists observed in apt. #4c. these potentially hazardous conditions have rendered the entire apartment 4c unsafe to enter and occupy. an engineering report is required to assess and rectify the property.
Nov 6, 2025
Dob violation - dismissed - Construction other optional
All work and permits in connection with application #m01181265-i1 has been revoked
Apr 14, 2025
Dob violation - dismissed - Construction other optional
Dob hereby orders you to stop all work immediately due to intent to revoke all approvals and permits under job #m01181265-i1 .
Apr 14, 2025
Dob violation - active - Construction other optional
All work and permits in connection with application #m01098599-i1 has been revoked
Apr 1, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Construction other optional
Emergency work order.main bldg w/wood joist&crckd 3rdfl header w/ inadequate connection to trimmer,which was supportng interior wall adj to stairs.floors severely slopng towards center stairs@2nd thru 5flrs ownr to immed rtain nyspe&licensed gc to shore bldg,as req'd,undr full time cont,nyspe supervision/direction
Aug 14, 2024
Dob violation - active - Construction other optional
Failure to maintain bldg in a safe condition.main bldg&crckd 3rdfl header w/inadequate connection to trimmer which was supportng interior wall adj to stairs.floors severely slopng towards.ownr to rtain nyspe to eval the ent bldg&file rpair dwgs w/dob.perm rpairs to begin undr prmt 10/14/24&cmpltd&sgnd off
Aug 14, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed
Show 11 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 19, 1994
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Dec 19, 1994
Dob violation - dismissed
ECB violations · 22
- Class - 1
Atoi observed at apt #3c , 3d and 4d electrical work was done without permit (conduits, outlets, switches and fixtures), obtain permit
Nov 6, 2025 · Penalty $1,600
Active - Class - 1
Atoi inspection observed that multiple floors and stairways are uneven and sloped, creating hazardous conditions for the tenants of the property, repair and/replace
Nov 6, 2025 · Penalty $2,500
Active - Class - 2
Work without permit, observed tubs installed with all typical water and waste piping in rooms 4d and 2d. in room 3c stand shower waste and water piping installed., obtain all permits
Nov 6, 2025 · Penalty $1,250
Active - Class - 1
Atoi observed at apt#4c broken walls and broken floor exposing wood joists. these potentially hazardous conditions have therefore rendered the entire apt 4c unsafe to enter / occupy, repair and/replace; vacate
Nov 6, 2025 · Penalty $2,500
Resolve - Class - 2
Atoi firestopping installed at ceilings in unoccupied rooms at 5th fl, without permit - no work in progress, obtain all permits; obtain permit
Mar 19, 2025
Resolve - Class - 1
Atoi firestopping removed and exposed electrical wiring in unoccupied rooms at 2nd, 3rd and 4th fls of premises, an occupied mixed use multiple dwelling, repair and/replace; replace firestopping, cover electric
Mar 19, 2025
Resolve - Class - 2
Atoi observed: 6 metal shooting installed at 1st floor and reinforcing beams with wood supporting the apts aboves using to fix structure defect without dob permit. ecb violation issued., obtain all permits
Nov 22, 2024
Resolve - Class - 1
Partial *swo* use of supported scaffold without a scaffold user certificate.supported scaffold @exps #1 & #4 w/approx 8 workers performing facade work.only one 4-hr user certificate could be produced.rem:stop a
Aug 29, 2013 · Penalty $8,000
Resolve - Class - 1
3314.8 supported scaffold does not meet code specifications.supported scaffold @exp #1 & #4,approx 50' in height does not meet dob req.note:supported scaffold missing guardrails,mid-rails & toe boards;planks ex
Aug 29, 2013 · Penalty $8,000
Resolve - Class - 2
Operation of place of assembly w/out a current certificate of operation.p.a. permit#100958073 for 194 people cellar - 2nd floor expired 10- 17-12.remedy:obtain place of assembly certificate of operation.
Dec 14, 2012
Resolve
Show 12 more ↓
- Class - 2
Approved place of assembly plans not available for inspection noted: upon inspection plans not available under permit 100958073 expired 10-17-12. remedy: provide approved pa plans.
Dec 14, 2012
Resolve - Non-hazardous
Altered building occupied without first obtaining a valid certificate of occupancy as required under application 100958064.remedy:discontinue use or obtain a certificate of occupancy.
Aug 21, 2003 · Penalty $350
Resolve - Non-hazardous
Work without a permit work complete noted at 3 fl level west side new partitions erected creating kitchen with stove sink refriedgator in conjunction with bathrm with shower lessening units to 3 total on fl
Apr 6, 1999 · Penalty $2,500
Resolve - Non-hazardous
Use of illegal hardware noted at verious locations throughout entry /exit to rms with enterval locking lasp lock and loop locks remedy remove illegal hardware at once
Apr 6, 1999 · Penalty $2,500
Resolve - Non-hazardous
Operation of a place of assembly without a pa permit noted at 1st fl level restaraunt for 2nd fl level accesson space with total capacity seating arranged to seat approx 175 persons remedy not in code complai
Mar 2, 1999 · Penalty $200
Resolve - Non-hazardous
Work without a permit. noted: at 4 fl rear east side space complete demolition of plaster fire proofing and wood lathe. work approx 50% complete. remedy: stop all work. make area safe. obtain all permit.
Feb 10, 1999 · Penalty $500
Resolve - Non-hazardous
Failure to maintain building. noted: at 4th floor rear east side door to construction location not mounted leaving area open. 2) floors in public hallway sloping at various locations throughout. remedy: repair
Feb 10, 1999 · Penalty $350
Resolve - Non-hazardous
No equipment use permits. noted: at 2nd fl level roof 2 trane ac unitsremedy: obtain equipment use permits.
Dec 22, 1998
Resolve - Hazardous
Gas meter & gas piping located at entrance in a public hallway. supplying gas to a 3rd fl kitchen stove. violation: failing to maintain plumbing (hazardous). memo 6/30/75 by thomas burke.
May 19, 1998 · Penalty $800
Resolve - Non-hazardous
Failure to provide approved plana at premises at time of inspection. noted: all work beings done under permit #100941929-04 remedy: provideapproved plans stop all work!
Nov 28, 1994
Resolve - Hazardous
Work does noit conform to approved plans. noted: application # 100 941 929 type alt 2-1. installing 3 street beams atop west exterior brick wall whick is structuraly defective, approx 15'-20 rear
Nov 28, 1994 · Penalty $350
Resolve - Non-hazardous
Failure to provide appproved pans at premise at time of inspection alteration.100941929 -11/05/95 major rehab.(new steel structural) cellar first /second stern rear remedy provide approved plans at site
Nov 21, 1994
Resolve
Complaints
- Heat/hot water
Entire building
Jan 23, 2026 · Apt 3C
Close - Heat/hot water
Entire building
Jan 22, 2026 · Apt 3C
Close - Door/window
Door
Jan 20, 2026 · Apt BLDGEN
Close - Heat/hot water
Entire building
Nov 20, 2025 · Apt 1A
Close - Heat/hot water
Apartment only
Nov 20, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Nov 17, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 11, 2025 · Apt 1C
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Nov 10, 2025 · Apt 3C
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 10, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Nov 10, 2025 · Apt 1B
Close - Flooring/stairs
Stairs
Nov 7, 2025 · Apt 1A
Close - Electric
No lighting
Nov 7, 2025 · Apt 2E
Close - Heat/hot water
Entire building
Nov 7, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 7, 2025 · Apt 3C
Close - Unsanitary condition
Pests
Sep 13, 2025 · Apt 4D
Close - Flooring/stairs
Floor
Jun 20, 2025 · Apt 2A
Close - Paint/plaster
Ceiling
Jun 20, 2025 · Apt 4M
Close - Safety
Carbon monoxide detector
Jun 20, 2025 · Apt 3A
Close - Flooring/stairs
Floor
Jun 20, 2025 · Apt 3A
Close - Paint/plaster
Ceiling
Jun 20, 2025 · Apt 3A
Close - Safety
Fire escape
Jun 20, 2025 · Apt 2B
Close - Safety
Carbon monoxide detector
Jun 20, 2025 · Apt 2B
Close - Safety
Smoke detector
Jun 20, 2025 · Apt 2B
Close - Flooring/stairs
Floor
Jun 20, 2025 · Apt 2B
Close - Paint/plaster
Ceiling
Jun 20, 2025 · Apt 2B
Close - Safety
Smoke detector
Jun 20, 2025 · Apt 3A
Close - Flooring/stairs
Floor
Jun 20, 2025 · Apt BUILD
Close - Paint/plaster
Ceiling
Jun 20, 2025 · Apt BUILD
Close - Flooring/stairs
Floor
Jun 20, 2025 · Apt BUILD
Close - Safety
Fire escape
Jun 20, 2025 · Apt 2A
Close - Safety
Carbon monoxide detector
Jun 20, 2025 · Apt 2A
Close - Safety
Smoke detector
Jun 20, 2025 · Apt 2A
Close - Paint/plaster
Ceiling
Jun 20, 2025 · Apt 2A
Close - Flooring/stairs
Stairs
Jun 20, 2025 · Apt PA
Close - Safety
Fire escape
Jun 20, 2025 · Apt 4A
Close - Safety
Carbon monoxide detector
Jun 20, 2025 · Apt 4A
Close - Safety
Smoke detector
Jun 20, 2025 · Apt 4A
Close - Paint/plaster
Ceiling
Jun 20, 2025 · Apt 4A
Close - Flooring/stairs
Floor
Jun 20, 2025 · Apt 4A
Close - Safety
Carbon monoxide detector
Jun 20, 2025 · Apt 4C
Close - Safety
Fire escape
Jun 20, 2025 · Apt 4C
Close - Safety
Smoke detector
Jun 20, 2025 · Apt 4C
Close - Flooring/stairs
Floor
Jun 20, 2025 · Apt 4C
Close - Paint/plaster
Ceiling
Jun 20, 2025 · Apt 4C
Close - Paint/plaster
Wall
Jun 20, 2025 · Apt 4M
Close - Flooring/stairs
Floor
Jun 20, 2025 · Apt PA
Close - Plumbing
Toilet
Jun 20, 2025 · Apt HALL
Close - Plumbing
Basin/sink
Jun 20, 2025 · Apt HALL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O8)
- Year built
- 1900
- Floors
- 5
- Residential units
- 14
- Building area
- 7,968 ft²
- Lot area
- 2,070 ft²
- Zoning
- C6-2A
- Community board
- 103
- Council district
- 2
- Block / lot
- 555 / 40
- Assessed value
- $1,131,750
- Landmark / historic district
- No
HPD registration #117881, last renewed Sep 10, 2025.
Questions about 109 East 9 Street
Who owns 109 East 9 Street?
The owner of record in NYC Department of City Planning PLUTO data is 109e9 LLC.
Does 109 East 9 Street have violations?
Yes. NYC HPD has recorded 72 housing violations at this property.
Is 109 East 9 Street rent stabilized?
NYC Department of Finance tax bills listed 11 rent-stabilized units here in 2024 (about 79% of its 14 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 109 East 9 Street built?
City records list 1900 as the year it was built.
How many apartments are in 109 East 9 Street?
It has 14 residential units and 15 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.