2 Cooper Square
Manhattan, NY 10003BBL 1-00544-0065Map
Owner of record: 10-12 Cooper Square INC
2 Cooper Square is an elevator apartment building built in 2009 in Manhattan, 10003. It has 133 residential units across 16 floors. The owner of record is 10-12 Cooper Square INC. HPD has recorded 14 housing violations here, most recently on November 17, 2025. 3 of the 14 most recent violations are still open. City tax records listed 133 rent-stabilized apartments here in 2023.
- HPD violations
- 14
- DOB violations
- 31
- ECB violations
- 49
- HPD complaints
- 21
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 8, 8th story, 2nd apartment from south at west
Apr 10, 2021 · Apt 8
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures in kitchen and bathroom in the entire apartment located at apt 8, 8th story, 2nd apartment from south at west
Apr 10, 2021 · Apt 8
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at kitchen and bathroom located at apt 2b, 2nd story, 3rd apartment from south at west
Apr 4, 2020 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at kitchen and bathroom located at apt 2b, 2nd story, 3rd apartment from south at west
Apr 4, 2020 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked boiler room door at basement
Apr 4, 2020
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at or near mailboxes at public hall, 1st story
Mar 15, 2016
Closed — Violation closed
Show 4 more ↓
- ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box , at public hall, 1st story
Mar 15, 2016
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Mar 15, 2016
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Mar 15, 2016
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 15, 2016
Closed — Violation closed
DOB building violations · 31
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed
Show 21 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 29, 2008
Dob violation - dismissed - Construction other optional
Work does not conform to approved construction documents and/or approved amendments nb permit # 104743495 two rakers not installed for support of shoring of excavation at exposure 2 rear of 16 cooper square. concrete wall constructed along length of foundation at exp 3 (37 e 4 street) not on approved plans
Aug 7, 2008
Dob violation - dismissed - Construction other optional
Stop all work failure to provide approved plans on site at time of ins pection noted: an active excavation site, plans are incomplete for und erpinning missing demensions missing rakers on plans no demensions seq uance for underpinning unclear job#104743422 plan incomplete no refere nce remedy: stop work amend plans call 212 676-2918
Apr 23, 2008
Dob violation - dismissed
ECB violations · 49
- Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #915990.remedy:submit acceptable required te
Dec 9, 2022 · Penalty $1,250
Active - Class - 2
Accessory use:found the active construction of a physical culture establishment at 1st flr and celalr. please be advised that alteration i job#121694345 to create a physical culture establishment was disapprov
Jul 16, 2013
Resolve - Class - 2
Failure to comply w/ nyc fire & bldg code smoking refuse observed in construction site refuse observed on 1st fl near contractors shed & near entrance rem: comply w/ the code
Jul 1, 2010 · Penalty $1,200
Resolve - Class - 1
Sec. 3301.2. failure to provide overhead protection. observed workers are working on 7th flr setback while parapet construction is in progress on roof right above the workers. remedy: provide overheadprotection
May 26, 2010 · Penalty $1,600
Resolve - Class - 2
Sec. 3301.2. failure to safeguard all persons affected by constructionoperations. noted at time of inspection of above site bldg complete tothe roof, observed no guard rail system provided at exp 1. 7th flr
Apr 13, 2010 · Penalty $4,000
Resolve - Class - 2
Sec. 3301.7. failure to provide design drawing. noted: at time of inspection at above active site, observed material hoist on the roof bulkhead at exp (1), no design drawing available on site. remedy: stop all
Apr 13, 2010 · Penalty $4,000
Resolve - Class - 2
Failure to maintain. vertical nets at time of inspection west side of bldg scaffolding erected exterior of bldg vertical nets set up to protect any material from falling off scaffold is loose & hanging on scaff
Jan 25, 2010 · Penalty $250
Resolve - Class - 2
Failure to maintain vertical netting at time of inspection on flrs 5,12,13,14,15 cables missing on vertical netting that hold nets secure & nets loose & not tied to cables holes in nets large gaps in nets.
Jan 25, 2010 · Penalty $250
Resolve - Class - 1
Failure to safeguard public & property affected by construction operations. at time of inspection windows installed to 10th flr on 7th flr set back there is no overhead protection provided leading out on to set
Jan 25, 2010 · Penalty $2,400
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction no guard rails at time of inspection on flrs 10,12,13 guardrails around hoist platforms sections missing guardrail panels loose.
Jan 25, 2010 · Penalty $2,400
Resolve
Show 39 more ↓
- Class - 1
Failure to maintain adequate housekeeping. per section requirements: upon inspection as noted on active construction site up to 16th (roof). there was an excessive amount of debris rubble,(disguarded) masonry
Dec 22, 2009 · Penalty $2,400
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. upon inspection as noted: on active construction site up to 16th flr(roof) there were cigarette butts on the 1st flr cellar & sub
Dec 22, 2009 · Penalty $1,200
Resolve - Class - 2
Sec. bc 3301.2 failure to institute & maintain safety equipment or temporary construction. holes in flr: upon inspection as noted: on activeconstruction site up to 16th roof. there were holes varying in size fr
Dec 22, 2009 · Penalty $400
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction: no guardrails: upon inspection on active construction site up 16th (roof). there was a scaffold on the ground flr approx 13ft
Dec 22, 2009 · Penalty $1,200
Resolve - Class - 1
3303.4.5.1(misc)storage of material during construction:upon inspection as noted:on active const site up to roof (16th) there was material 4"conduit, 2x8 planks,plywood unstrapped & stacked loosely @ the edge
Nov 19, 2009 · Penalty $1,600
Resolve - Class - 2
Bc3307.4.3vehicular traffic no warning lights upon inspection as notedon active const site up to roof (16th) there was approx 200ft of barrier around the jobsite & only one lantern was in wrking order. traffic
Nov 19, 2009 · Penalty $800
Resolve - Class - 3
Contrary to approved plans - scaffold erected over 40' in height around entire site - scaffold fully netted - design drawing does not specify. remedy: amend drawings to show scaffold fully netted.
Oct 20, 2009 · Penalty $500
Resolve - Class - 1
Failure to cover opening/holes on inspection of above active site observed uncovered holes throughout building.remedy:cover all openings on all floors.
Sep 21, 2009 · Penalty $2,400
Resolve - Class - 1
Sec. bc 3303.8(2) failure to maintain siamese connection from obstruction. note: at time of inspection at above site. observed siamese connection obstructed by ramp that's made up of plywood 2x4 & 3x4 that's
Aug 23, 2009 · Penalty $1,600
Resolve - Class - 1
Work w/o a permit noted: at time of inspection at above active site building up to 9th flr. observed pipe scaffold erected at the edge of building at the 6th flr along exposure 3 pipe scaffold erected approx fe
Aug 4, 2009
Resolve - Class - 1
Sec.bc3308.1. & 27-1021(g).failure to provide vertical netting at perimeter of bldg.note:at time of inspection at above active site pouring of 8th fl in progress observed there is no vertical netting provided
Jul 23, 2009 · Penalty $1,600
Resolve - Class - 2
Sec 3301.2 misc viol: fail to provide fireguard while torch operationsburning in progress. noted: forming 6th floor in progress. observed burning operation on going in the sub cellar w.o avy fireguard on duty.
Jul 1, 2009
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations.note:at time of inspection at above active site forming of 6fl in progress observed,smoking within construction site in violation
Jul 1, 2009
Resolve - Class - 1
Sec. bc 3301.7.3.1 & 27-1021 failure to provide sidewalk shed as required. note: at time of inspection at above active site construction work in progress. forming of 5th flr,observed there is no sidewalk shed
Jun 22, 2009 · Penalty $1,600
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirement. note: at time of inspection at above active site(forming) 5th flr in peogress,observed excessive amount of material formwork,plywood,clamps,sca
Jun 22, 2009 · Penalty $2,400
Resolve - Class - 2
Sec. bc 3313.1 & 27-1069 storage of all flammable & combustible compressed gases. note: at time of inspection at above active site construction work is progress observed 3 tanks stored in the basement w/o f.d.n
Jun 22, 2009
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. note: at time of inspection at above active site construction work in progress observed platform erected at exposure 1 3rd fl
Jun 22, 2009
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations upon inspection as noted on active construction site up to 4th flr there are electric box's & extension cords also cord connection
Jun 18, 2009
Resolve - Class - 2
Sec. 3301.2 27-1009(a) failure to institute & maintain safety equipment measures or temporary construction: holes in flr: upon inspection as noted on active construction site up to 3rd flr there were holes appr
Jun 4, 2009
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations: no fall arrest system: upon inspection as noted on active construction site up to 3rd flr there was 2 workers working on the nort
Jun 4, 2009 · Penalty $2,400
Resolve - Class - 2
Sec 3301.2 failure to safeguard public and property affected by construction operations noted by an a frame ladder (2) are being used inappropriately not extended put closed leaning against wall used to climb u
Apr 23, 2009
Resolve - Class - 2
Sec. bc 3307.5.2;27-1024(b). failure to provide flagperson. noted: at time of inspection on active job site w/concrete form work and delivery in operation. observed lumber delivery in process on bowery side of
Mar 23, 2009 · Penalty $400
Resolve - Class - 1
Sec. 3310.8.2 notification requirement: noted: an accident involving aworker who fell while climbing onto a(broken) scaffold was injured with 20 (s ) - best squad was not notified by site safety manager -
Mar 12, 2009
Resolve - Class - 1
Sec. 3307.8 guardrail requirement noted:(baker) scaffold being used has no guardrail. remedy: provide guardrail.
Mar 12, 2009
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. noted: baker scaffold used to install insulation at foundation walls with no guardrails or ladder to climb up & down person injuc
Mar 12, 2009
Resolve - Class - 1
Storage & use of combustible gases. at time of inspection oxygen & accedelyne tanks on site. tanks free standing not in cages or carts. no f.d.n.y. permit for use & storage. remedy: stop all uses of oxygen & ac
Dec 30, 2008
Resolve - Class - 1
Failure to safeguad public & property affected by construction operations - upon inspection - concrete slab poured on south side - workers smoothing out ( ) - no 2 means of egress for entire site. remedy: stop
Dec 6, 2008 · Penalty $2,400
Resolve - Class - 2
Sec. 3315.2. failure to provide guard rail & timber curbs for runways & ramps for the use of motor vehicles. as noted: at time of inspectionat above active construction site rebar work in progress for mat slab.
Dec 3, 2008 · Penalty $800
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operation. as noted: observed smoking w/i construction site in violation of nyc fire code 1404.1. smoking observed 1) at ground level by
Dec 3, 2008 · Penalty $1,200
Resolve - Class - 2
Job site fence not constructed pursuant to subsection. as noted: at time off inspection at above active construction site observed wood gates in frontt of job site. approx 4' wide swinging out onto sidewalk
Dec 3, 2008
Resolve - Class - 2
No site safety log per regulation: as noted: at time of inspection at above active construction site rebar work in progress for mat slab. site safety log is not maitained up to date. missing entry from november
Dec 3, 2008
Resolve - Class - 1
Failure to safeguard all persons affected by construction operations. noted: work ongoing under nb permit #104743495 inside the constructionfence, at the edge of approx 15 foot excavation, is an approx 8 to 10
Sep 2, 2008 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations noted nb permit #104743495 excavating and shoring for new bldg foundation wall place at rear no guardrails along trunk ramp appro
Aug 7, 2008 · Penalty $2,400
Resolve - Non-hazardous
Work w/o a permit work noted installed a sidewalk shed at front & sideof above location. panels installed are approx.12'high &are being usedas a billboard for sign advertisement w/o 1st obtaining permits &
Dec 26, 2006 · Penalty $400
Resolve - Hazardous
Work w/o permit work noted @ south east corner of the property erectedconst sidewalk shed approx size 140' note6' advertising installed around shed on top.remedy:obtain permit or restore to prior legal conditio
Aug 23, 2006 · Penalty $500
Resolve - Non-hazardous
Work w/o a permit work noted installed approx 15'-0t of sidewalk shed @ front of lot @ cooper square & @ side of lot @ east 4th st w/o 1st obtaining required permits & approvals.note:panels are approx 12ft high
Aug 22, 2006 · Penalty $500
Resolve - Non-hazardous
Work w/o a permit-work noted-erected side walk shed at corner cooper,sq & east 4th st. remedy: obtain permits or discontinue use.
Jun 2, 2006
Resolve - Non-hazardous
Work without a permit work noted install 24 mechanical lifts for parking cars and installed asphalt at the entire lot without first obtaining permits and approvals as required by this department. remedy: remove
Jun 17, 2004 · Penalty $500
Resolve - Non-hazardous
Occupancy contrary to that allowed by building department records in that vacant lot converted into parking lot for approx 150 cars contraryto building department records. remedy: discontinue use or obtain a c
Jun 17, 2004 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Pests
Sep 1, 2026 · Apt 2G
Close - Water leak
Heavy flow
Jul 11, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 28, 2022 · Apt 13D
Close - Heat/hot water
Entire building
Apr 10, 2021 · Apt BLDG
Close - Plumbing
Water supply
Apr 10, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2021 · Apt BLDG
Close - Plumbing
Water supply
Apr 10, 2021 · Apt BLDG
Close - Plumbing
Water supply
Apr 10, 2021 · Apt BLDG
Close - Plumbing
Water supply
May 18, 2020 · Apt 6J
Close - Heat/hot water
Entire building
May 16, 2020 · Apt BLDG
Close
Show 11 more ↓
- Plumbing
Water supply
Apr 4, 2020 · Apt 5B
Close - Plumbing
Water supply
Apr 4, 2020 · Apt 8C
Close - Plumbing
Water supply
Apr 4, 2020 · Apt BLDG
Close - Plumbing
Water supply
Apr 4, 2020 · Apt 5B
Close - Plumbing
Water supply
Apr 4, 2020 · Apt BLDG
Close - Plumbing
Water supply
Apr 3, 2020 · Apt 2B
Close - Heat/hot water
Entire building
Apr 3, 2020 · Apt 2B
Close - Heat/hot water
Entire building
Mar 12, 2016 · Apt 10A
Close - General
Signage missing
Mar 12, 2016 · Apt BLDG
Close - Heating
Heat related
Feb 28, 2014 · Apt 4H
Close - Heating
Heat related
Dec 14, 2004 · Apt XYZ
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2009
- Floors
- 16
- Residential units
- 133
- Building area
- 128,300 ft²
- Lot area
- 13,542 ft²
- Zoning
- M1-6/R10
- Community board
- 102
- Council district
- 2
- Block / lot
- 544 / 65
- Assessed value
- $31,417,650
- Landmark / historic district
- No
HPD registration #143378, last renewed Dec 1, 2025.
Questions about 2 Cooper Square
Who owns 2 Cooper Square?
The owner of record in NYC Department of City Planning PLUTO data is 10-12 Cooper Square INC.
Does 2 Cooper Square have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 2 Cooper Square rent stabilized?
NYC Department of Finance tax bills listed 133 rent-stabilized units here in 2023 (about 100% of its 133 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2 Cooper Square built?
City records list 2009 as the year it was built.
How many apartments are in 2 Cooper Square?
It has 133 residential units and 134 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.