36 East 4 Street
Manhattan, NY 10003BBL 1-00531-0031Map
Owner of record: 34-36 East 4th Street Realty LLC
36 East 4 Street is a walk-up apartment building built in 1889 in Manhattan, 10003. It has 18 residential units across 5 floors. The owner of record is 34-36 East 4th Street Realty LLC. HPD has recorded 9 housing violations here, most recently on January 18, 2024. 4 of the 9 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 9
- DOB violations
- 9
- ECB violations
- 34
- HPD complaints
- 37
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 9
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5fw, 5th story, 1st apartment from west at north
Jan 18, 2024 · Apt 5FW
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5fw, 5th story, 1st apartment from west at north
Jan 18, 2024 · Apt 5FW
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. at front areaway
Sep 12, 2017
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum required 100 watts (light fixture present) at front areaway, 1st story
Nov 25, 2016
Closed — Violation dismissed - BHazardous
D26-10.01, 10.05 adm code fire egress defective fire escapes at 5th sty rear west apt 16. located at apt 16
Apr 14, 1997 · Apt 16
Open — Nov sent out - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling and walls at kitchen 5 sty front east apt 17 barlow 674 4543. , section '' ''
Aug 24, 1992 · Apt 17
Open — First no access to re- inspect violation - BHazardous
D26-10.01, 10.05 adm code fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate 4 sty rear east apt 11. located at apt 11
Aug 20, 1992 · Apt 11
Open — Nov sent out - BHazardous
D26-10.01, 10.05 adm code and dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes all stys rear fire escapes.
Aug 20, 1992
Open — Nov sent out
DOB building violations · 9
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 24, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 6, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
May 1, 1992
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Sep 28, 1988
Dob violation - dismissed
ECB violations · 34
- Class - 1
Filed a certificate,form,application etc.containing a material false statement(s)noted:the owner/representative made false certifications onsection#26 on pw1 job application #123069455which was filed on 05/30/1
Oct 30, 2017 · Penalty $4,800
Resolve - Class - 2
Failure to comply w/the commissioner's order contained in notice of violation #34879511n issued on 4/4/11. for work w/o a permit at the cellar. remedy: comply w/the comm's order.
Feb 4, 2012 · Penalty $400
Resolve - Class - 1
Failure to comply w/the comm's order contained in nov#34879511n issued on 04/04/2011.for work w/o permit at cellar level.remedy:comply w/thecomm's order.
Sep 2, 2011 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34879511n issued on 4/4/11. for work w/o permit at cellar level. remedy: comply w/the commissioner's order.
Jul 19, 2011 · Penalty $2,400
Resolve - Class - 1
Unlawful acts. failure to comply w/an order at the commissioner. respondent failed to correct the violating conditions cited in the prior ecb nov #34879511n. for work w/o permit at cellar level. remedy: comply
May 20, 2011 · Penalty $2,400
Resolve - Class - 1
Unlawful acts. failure to comply w/an order of the commissioner. respondent failed to correct the conditions cited in the prior nov #34879511n for work w/o a permit at cellar west foundation wall through walkwa
Mar 11, 2011 · Penalty $2,400
Resolve - Class - 1
Work w/o a permit.noted:at west foundation wall at cellar an expansion of the #34 e.4st. men's room has been built and a through hole walkway was built w/o a permit. the through hole is through the common found
Jan 4, 2011 · Penalty $1,600
Resolve - Non-hazardous
Occupancy contrary to that allowed by dob records rear of cellar area changed from storage to dinning area for approx 40 persons remedy: discontinue illegal use
May 31, 2008 · Penalty $400
Resolve - Non-hazardous
Failure to maintain adequate housekeeping.note:garbage bags garbage & const debris & ladders being stored in air shaft corride (at west side) basement level.photo.remedy:maintain adequate house repair & remove
Jun 30, 2007 · Penalty $500
Resolve - Hazardous
Exit passageway or corridor: total. note: at center air shaft corridorthere exists the following: const materials consisting of 4'x 8' plywood sheets plywood & wood shelving, bundles of wood shingles, ladders,
Feb 12, 2007
Resolve
Show 24 more ↓
- Non-hazardous
Work without a permit. ground floor east space erecting partition and installing bathroom rough new electric. remedy: stop all work. obtain permits.
Sep 25, 2004
Resolve - Non-hazardous
Failure to provide approved plans at time of inspection. job #103790701 alt type 2 3rd floor. remedy: stop all work provide plans.
Jun 21, 2004 · Penalty $130
Resolve - Non-hazardous
Work without a permits. work noted: 5th floor apt # 5rw demo of partitions, removed plaster from exterior walls. installed sleepers to existing floor 2' x 3'' wood. remedy: work completed appox. 40% done stop a
Jun 21, 2004 · Penalty $250
Resolve - Non-hazardous
Work without a permit. (100% of work completed) noted: steel deck & stairs and steel i beams running between 34 e 4 st & 36 e 4 st installed without plans or permits. location: air shaft between 34 e 4 st &
Jul 3, 2001 · Penalty $500
Resolve - Hazardous
Failure to maintain building. noted: wooden stair case from 1st floor corridor to cellar has broken treads making it difficult & dangerous to use. remedy: repair all defects immediately & maintian bldg.
Jul 3, 2001 · Penalty $800
Resolve - Non-hazardous
Use of illegal hardware. noted: secondary means of egress from rear fire escapes passes into cellar through door which lock's from inside cellar with a bolt. remedy: remove illegal hardware immediately.
Jul 3, 2001 · Penalty $350
Resolve - Non-hazardous
Exit passageway or corridor: required width decreased by obstruction. noted: secondary egress from rear fire escape passes through cellar which is filled with garbage. remedy: remove obstructions immediately.
Jul 3, 2001 · Penalty $350
Resolve - Hazardous
Failure to maintain adequate houskeeping. noted: at cellar level large amount of cumbustible construction debris stored creating a fire &tripping hazard. remedy: remove all debris & maintain housekeeping.
Oct 12, 2000 · Penalty $500
Resolve - Non-hazardous
Failure to maintain building noted: at 1st & 2nd floor level public staircase steps pulling away from wall, loose cracked defective. remedyrepair all defects at once.
Dec 27, 1999
Resolve - Non-hazardous
Failure to provide approved plans at premises at time of inspection. noted: firerated ceiling removed in apt. 4fw-4 fl. new partition wall erected between apts 4fw and 4fe 4 fl. 2 persons working. 75% of work c
Apr 7, 1998
Resolve - Non-hazardous
Work without a permit. noted: steel beam and concrete platform installed over cellar level at west side of building airshaft creating a first floor level approx. size at longest measurement 30' x 10'. installe
Jan 23, 1998 · Penalty $500
Resolve - Hazardous
Failure to maintain bldg. noted: stairs in public hallway throughout all fls at various locations broken, damaged and loose. water damage on 5th fl ceiling in public hallway. remedy: repair all defects.
Dec 30, 1997 · Penalty $800
Resolve - Non-hazardous
Work without a permit. noted: removal of fireproofing in apts 4fe and5fe on ceiling and walls throughout apt. erected a wood frame and sheetrock partition dividing 4fe & 4fw.
Dec 30, 1997 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior wall noted: rear yard ground level. east retaining wall broken damaged and collapsing approx. size 5' high x 10' long x 18" wide. creating a hazardous condition. remedy: repair re
Oct 7, 1997 · Penalty $800
Resolve - Non-hazardous
Building matters covered: hazardous. noted: sealing of existing light shaft contrary to department values and regulations. for non- fire proof structures: shaft require can enclose of material assembly
Dec 19, 1994 · Penalty $350
Resolve - Hazardous
Work without a permit--creating hazardous conditions noted: interior demoltion of commercial space. new partitions, new bathroom and sec--story. remedy; stop all work. obtain a permit and approvals from --
Dec 19, 1994 · Penalty $800
Resolve - Non-hazardous
Work with out a permit work noted: removal of centerline wooden beams and brick columns at front of basement approx 40' building front sec- tion is unsupported ceiling.
Oct 17, 1994 · Penalty $800
Resolve - Non-hazardous
Work work without a permit. constructing new interior sheetrock and metal stud wall. removal of kitchen constructing new closet at apt 2tr at 2nd floor. remedy: obtain a permit if feasible or restore
Oct 17, 1994
Resolve - Hazardous
Work without a lpermit work noted:complete demoltition of all interiorwalls and store fronts of 1st flr commercial spaces (2)the remocval of the fire reated ceiling at the 1or2flstores creating a hazardous co
Oct 17, 1994
Resolve - Non-hazardous
Work without a permit work noted removed partition wall at cellar level running north to south removed fire rated material from cellar ceiling remedy obtain a permit or restore to prior condition
May 1, 1992 · Penalty $1,000
Resolve - Non-hazardous
Work without a permit. work noted: ceilings and interior partitions. removed from 5th story front and rear apt. on west side of building 3rd story rear east apt. 2nd story building cellar, holes created in
May 1, 1992 · Penalty $1,000
Resolve - Non-hazardous
Work without a permit work noted ceilings and interior partitions removed from 5 sty front and rear apt on west side of building 3 sty rear east apt 2 sty rear east apt 1 sty stores on west and east sides of bl
Mar 28, 1989 · Penalty $125
Resolve - Non-hazardous
Work without a permit work noted removed partition walls at cellar level running north to south removed fire rated materiao from cellar ceiling remedy stop all work obtain a permit if feasible or restore to pri
Jan 23, 1989 · Penalty $285
Resolve - Unknown
Work without a permit interior demolition in 5 floor s/w and n/w apts plaster walls and ceilings removed partitions removed stop all work remedy obtain permits before continuing work
Jul 13, 1988 · Penalty $1,000
Resolve
Complaints
- Water leak
Heavy flow
Apr 26, 2025 · Apt GROUND
Close - Heat/hot water
Apartment only
Jan 16, 2024 · Apt 5FW
Close - Heat/hot water
Entire building
Nov 28, 2023 · Apt BLDG
Close - Heating
Heat related
Feb 13, 2011 · Apt 3FW
Close - Heating
Heat related
Jan 28, 2011 · Apt 1RE
Close - Heating
Heat related
Jan 24, 2011 · Apt 2FE
Close - Heating
Heat related
Jan 19, 2011 · Apt BLDG
Close - Heating
Heat related
Jan 18, 2011 · Apt 1RW
Close - Heating
Heat related
Nov 30, 2010 · Apt BLDG
Close - Heating
Heat related
Nov 28, 2010 · Apt BLDG
Close
Show 27 more ↓
- Heating
Heat related
Nov 22, 2010 · Apt BLDG
Close - Heating
Heat related
Nov 20, 2010 · Apt 8
Close - Heating
Heat related
Oct 10, 2009 · Apt 2RW
Close - Heating
Heat related
Feb 22, 2009 · Apt 2RW
Close - Heating
Heat related
Feb 6, 2009 · Apt 2RW
Close - Heating
Heat related
Jan 29, 2009 · Apt 2RW
Close - Heating
Heat related
Jan 28, 2009 · Apt 2RW
Close - Heating
Heat related
Jan 15, 2009 · Apt 2RW
Close - Heating
Heat related
Jan 13, 2009 · Apt 2RW
Close - Heating
Heat related
Nov 22, 2008 · Apt 2RW
Close - Heating
Heat related
Nov 22, 2008 · Apt BLDG
Close - Nonconst
Rubbish
May 4, 2008 · Apt 1RE
Close - Heating
Heat related
Feb 24, 2008 · Apt 2RW
Close - Heating
Heat related
Feb 24, 2008 · Apt 2RW
Close - Heating
Heat related
Feb 14, 2007 · Apt 2RW
Close - Heating
Heat related
Feb 11, 2007 · Apt 2RW
Close - Heating
Heat related
Feb 11, 2007 · Apt 4FW
Close - Heating
Heat related
Jan 29, 2007 · Apt 2RW
Close - Heating
Heat related
Jan 28, 2007 · Apt 2RW
Close - Heating
Heat related
Jan 21, 2007 · Apt 2RW
Close - Plumbing
Water supply
Aug 13, 2004 · Apt 1RW
Close - Plumbing
Basin/sink
Aug 13, 2004 · Apt 1RW
Close - Heating
Heat related
Aug 13, 2004 · Apt 1RW
Close - Plumbing
Basin/sink
Jun 29, 2004 · Apt 1RW
Close - Heating
Heat related
Jun 14, 2004 · Apt 1RW
Close - Paint/plaster
Ceiling
Dec 15, 2003 · Apt 2RW
Close - Paint/plaster
Ceiling
Dec 15, 2003 · Apt 2RW
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1889
- Floors
- 5
- Residential units
- 18
- Building area
- 10,070 ft²
- Lot area
- 2,405 ft²
- Zoning
- M1-5/R7X
- Community board
- 102
- Council district
- 2
- Block / lot
- 531 / 31
- Assessed value
- $2,274,750
- Landmark / historic district
- NoHo Historic District Extension
HPD registration #107996, last renewed Sep 4, 2025.
Questions about 36 East 4 Street
Who owns 36 East 4 Street?
The owner of record in NYC Department of City Planning PLUTO data is 34-36 East 4th Street Realty LLC.
Does 36 East 4 Street have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 36 East 4 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 33% of its 18 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 36 East 4 Street built?
City records list 1889 as the year it was built.
How many apartments are in 36 East 4 Street?
It has 18 residential units and 20 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.