roofy

36 East 4 Street

Manhattan, NY 10003BBL 1-00531-0031Map

Owner of record: 34-36 East 4th Street Realty LLC

36 East 4 Street is a walk-up apartment building built in 1889 in Manhattan, 10003. It has 18 residential units across 5 floors. The owner of record is 34-36 East 4th Street Realty LLC. HPD has recorded 9 housing violations here, most recently on January 18, 2024. 4 of the 9 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.

HPD violations
9
DOB violations
9
ECB violations
34
HPD complaints
37

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jan 18, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
6
About 33% of the building's 18 apartments
Down from 7 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 9

  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5fw, 5th story, 1st apartment from west at north

    Jan 18, 2024 · Apt 5FW

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5fw, 5th story, 1st apartment from west at north

    Jan 18, 2024 · Apt 5FW

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. at front areaway

    Sep 12, 2017

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum required 100 watts (light fixture present) at front areaway, 1st story

    Nov 25, 2016

    Closed — Violation dismissed
  • B

    D26-10.01, 10.05 adm code fire egress defective fire escapes at 5th sty rear west apt 16. located at apt 16

    Apr 14, 1997 · Apt 16

    Open — Nov sent out
  • C

    Remove or cover in a manner approved by the department the peeling lead paint ceiling and walls at kitchen 5 sty front east apt 17 barlow 674 4543. , section '' ''

    Aug 24, 1992 · Apt 17

    Open — First no access to re- inspect violation
  • B

    D26-10.01, 10.05 adm code fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate 4 sty rear east apt 11. located at apt 11

    Aug 20, 1992 · Apt 11

    Open — Nov sent out
  • B

    D26-10.01, 10.05 adm code and dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes all stys rear fire escapes.

    Aug 20, 1992

    Open — Nov sent out

DOB building violations · 9

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 24, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 6, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 1, 1992

    Vp-violation unserved ecb-active
  • Construction other optional

    C-construction other optional

    Sep 28, 1988

    Dob violation - dismissed

ECB violations · 34

  • Class - 1

    Filed a certificate,form,application etc.containing a material false statement(s)noted:the owner/representative made false certifications onsection#26 on pw1 job application #123069455which was filed on 05/30/1

    Oct 30, 2017 · Penalty $4,800

    Resolve
  • Class - 2

    Failure to comply w/the commissioner's order contained in notice of violation #34879511n issued on 4/4/11. for work w/o a permit at the cellar. remedy: comply w/the comm's order.

    Feb 4, 2012 · Penalty $400

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in nov#34879511n issued on 04/04/2011.for work w/o permit at cellar level.remedy:comply w/thecomm's order.

    Sep 2, 2011 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #34879511n issued on 4/4/11. for work w/o permit at cellar level. remedy: comply w/the commissioner's order.

    Jul 19, 2011 · Penalty $2,400

    Resolve
  • Class - 1

    Unlawful acts. failure to comply w/an order at the commissioner. respondent failed to correct the violating conditions cited in the prior ecb nov #34879511n. for work w/o permit at cellar level. remedy: comply

    May 20, 2011 · Penalty $2,400

    Resolve
  • Class - 1

    Unlawful acts. failure to comply w/an order of the commissioner. respondent failed to correct the conditions cited in the prior nov #34879511n for work w/o a permit at cellar west foundation wall through walkwa

    Mar 11, 2011 · Penalty $2,400

    Resolve
  • Class - 1

    Work w/o a permit.noted:at west foundation wall at cellar an expansion of the #34 e.4st. men's room has been built and a through hole walkway was built w/o a permit. the through hole is through the common found

    Jan 4, 2011 · Penalty $1,600

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by dob records rear of cellar area changed from storage to dinning area for approx 40 persons remedy: discontinue illegal use

    May 31, 2008 · Penalty $400

    Resolve
  • Non-hazardous

    Failure to maintain adequate housekeeping.note:garbage bags garbage & const debris & ladders being stored in air shaft corride (at west side) basement level.photo.remedy:maintain adequate house repair & remove

    Jun 30, 2007 · Penalty $500

    Resolve
  • Hazardous

    Exit passageway or corridor: total. note: at center air shaft corridorthere exists the following: const materials consisting of 4'x 8' plywood sheets plywood & wood shelving, bundles of wood shingles, ladders,

    Feb 12, 2007

    Resolve
Show 24 more ↓
  • Non-hazardous

    Work without a permit. ground floor east space erecting partition and installing bathroom rough new electric. remedy: stop all work. obtain permits.

    Sep 25, 2004

    Resolve
  • Non-hazardous

    Failure to provide approved plans at time of inspection. job #103790701 alt type 2 3rd floor. remedy: stop all work provide plans.

    Jun 21, 2004 · Penalty $130

    Resolve
  • Non-hazardous

    Work without a permits. work noted: 5th floor apt # 5rw demo of partitions, removed plaster from exterior walls. installed sleepers to existing floor 2' x 3'' wood. remedy: work completed appox. 40% done stop a

    Jun 21, 2004 · Penalty $250

    Resolve
  • Non-hazardous

    Work without a permit. (100% of work completed) noted: steel deck & stairs and steel i beams running between 34 e 4 st & 36 e 4 st installed without plans or permits. location: air shaft between 34 e 4 st &

    Jul 3, 2001 · Penalty $500

    Resolve
  • Hazardous

    Failure to maintain building. noted: wooden stair case from 1st floor corridor to cellar has broken treads making it difficult & dangerous to use. remedy: repair all defects immediately & maintian bldg.

    Jul 3, 2001 · Penalty $800

    Resolve
  • Non-hazardous

    Use of illegal hardware. noted: secondary means of egress from rear fire escapes passes into cellar through door which lock's from inside cellar with a bolt. remedy: remove illegal hardware immediately.

    Jul 3, 2001 · Penalty $350

    Resolve
  • Non-hazardous

    Exit passageway or corridor: required width decreased by obstruction. noted: secondary egress from rear fire escape passes through cellar which is filled with garbage. remedy: remove obstructions immediately.

    Jul 3, 2001 · Penalty $350

    Resolve
  • Hazardous

    Failure to maintain adequate houskeeping. noted: at cellar level large amount of cumbustible construction debris stored creating a fire &tripping hazard. remedy: remove all debris & maintain housekeeping.

    Oct 12, 2000 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to maintain building noted: at 1st & 2nd floor level public staircase steps pulling away from wall, loose cracked defective. remedyrepair all defects at once.

    Dec 27, 1999

    Resolve
  • Non-hazardous

    Failure to provide approved plans at premises at time of inspection. noted: firerated ceiling removed in apt. 4fw-4 fl. new partition wall erected between apts 4fw and 4fe 4 fl. 2 persons working. 75% of work c

    Apr 7, 1998

    Resolve
  • Non-hazardous

    Work without a permit. noted: steel beam and concrete platform installed over cellar level at west side of building airshaft creating a first floor level approx. size at longest measurement 30' x 10'. installe

    Jan 23, 1998 · Penalty $500

    Resolve
  • Hazardous

    Failure to maintain bldg. noted: stairs in public hallway throughout all fls at various locations broken, damaged and loose. water damage on 5th fl ceiling in public hallway. remedy: repair all defects.

    Dec 30, 1997 · Penalty $800

    Resolve
  • Non-hazardous

    Work without a permit. noted: removal of fireproofing in apts 4fe and5fe on ceiling and walls throughout apt. erected a wood frame and sheetrock partition dividing 4fe & 4fw.

    Dec 30, 1997 · Penalty $800

    Resolve
  • Hazardous

    Failure to maintain exterior wall noted: rear yard ground level. east retaining wall broken damaged and collapsing approx. size 5' high x 10' long x 18" wide. creating a hazardous condition. remedy: repair re

    Oct 7, 1997 · Penalty $800

    Resolve
  • Non-hazardous

    Building matters covered: hazardous. noted: sealing of existing light shaft contrary to department values and regulations. for non- fire proof structures: shaft require can enclose of material assembly

    Dec 19, 1994 · Penalty $350

    Resolve
  • Hazardous

    Work without a permit--creating hazardous conditions noted: interior demoltion of commercial space. new partitions, new bathroom and sec--story. remedy; stop all work. obtain a permit and approvals from --

    Dec 19, 1994 · Penalty $800

    Resolve
  • Non-hazardous

    Work with out a permit work noted: removal of centerline wooden beams and brick columns at front of basement approx 40' building front sec- tion is unsupported ceiling.

    Oct 17, 1994 · Penalty $800

    Resolve
  • Non-hazardous

    Work work without a permit. constructing new interior sheetrock and metal stud wall. removal of kitchen constructing new closet at apt 2tr at 2nd floor. remedy: obtain a permit if feasible or restore

    Oct 17, 1994

    Resolve
  • Hazardous

    Work without a lpermit work noted:complete demoltition of all interiorwalls and store fronts of 1st flr commercial spaces (2)the remocval of the fire reated ceiling at the 1or2flstores creating a hazardous co

    Oct 17, 1994

    Resolve
  • Non-hazardous

    Work without a permit work noted removed partition wall at cellar level running north to south removed fire rated material from cellar ceiling remedy obtain a permit or restore to prior condition

    May 1, 1992 · Penalty $1,000

    Resolve
  • Non-hazardous

    Work without a permit. work noted: ceilings and interior partitions. removed from 5th story front and rear apt. on west side of building 3rd story rear east apt. 2nd story building cellar, holes created in

    May 1, 1992 · Penalty $1,000

    Resolve
  • Non-hazardous

    Work without a permit work noted ceilings and interior partitions removed from 5 sty front and rear apt on west side of building 3 sty rear east apt 2 sty rear east apt 1 sty stores on west and east sides of bl

    Mar 28, 1989 · Penalty $125

    Resolve
  • Non-hazardous

    Work without a permit work noted removed partition walls at cellar level running north to south removed fire rated materiao from cellar ceiling remedy stop all work obtain a permit if feasible or restore to pri

    Jan 23, 1989 · Penalty $285

    Resolve
  • Unknown

    Work without a permit interior demolition in 5 floor s/w and n/w apts plaster walls and ceilings removed partitions removed stop all work remedy obtain permits before continuing work

    Jul 13, 1988 · Penalty $1,000

    Resolve

Complaints

  • Water leak

    Heavy flow

    Apr 26, 2025 · Apt GROUND

    Close
  • Heat/hot water

    Apartment only

    Jan 16, 2024 · Apt 5FW

    Close
  • Heat/hot water

    Entire building

    Nov 28, 2023 · Apt BLDG

    Close
  • Heating

    Heat related

    Feb 13, 2011 · Apt 3FW

    Close
  • Heating

    Heat related

    Jan 28, 2011 · Apt 1RE

    Close
  • Heating

    Heat related

    Jan 24, 2011 · Apt 2FE

    Close
  • Heating

    Heat related

    Jan 19, 2011 · Apt BLDG

    Close
  • Heating

    Heat related

    Jan 18, 2011 · Apt 1RW

    Close
  • Heating

    Heat related

    Nov 30, 2010 · Apt BLDG

    Close
  • Heating

    Heat related

    Nov 28, 2010 · Apt BLDG

    Close
Show 27 more ↓
  • Heating

    Heat related

    Nov 22, 2010 · Apt BLDG

    Close
  • Heating

    Heat related

    Nov 20, 2010 · Apt 8

    Close
  • Heating

    Heat related

    Oct 10, 2009 · Apt 2RW

    Close
  • Heating

    Heat related

    Feb 22, 2009 · Apt 2RW

    Close
  • Heating

    Heat related

    Feb 6, 2009 · Apt 2RW

    Close
  • Heating

    Heat related

    Jan 29, 2009 · Apt 2RW

    Close
  • Heating

    Heat related

    Jan 28, 2009 · Apt 2RW

    Close
  • Heating

    Heat related

    Jan 15, 2009 · Apt 2RW

    Close
  • Heating

    Heat related

    Jan 13, 2009 · Apt 2RW

    Close
  • Heating

    Heat related

    Nov 22, 2008 · Apt 2RW

    Close
  • Heating

    Heat related

    Nov 22, 2008 · Apt BLDG

    Close
  • Nonconst

    Rubbish

    May 4, 2008 · Apt 1RE

    Close
  • Heating

    Heat related

    Feb 24, 2008 · Apt 2RW

    Close
  • Heating

    Heat related

    Feb 24, 2008 · Apt 2RW

    Close
  • Heating

    Heat related

    Feb 14, 2007 · Apt 2RW

    Close
  • Heating

    Heat related

    Feb 11, 2007 · Apt 2RW

    Close
  • Heating

    Heat related

    Feb 11, 2007 · Apt 4FW

    Close
  • Heating

    Heat related

    Jan 29, 2007 · Apt 2RW

    Close
  • Heating

    Heat related

    Jan 28, 2007 · Apt 2RW

    Close
  • Heating

    Heat related

    Jan 21, 2007 · Apt 2RW

    Close
  • Plumbing

    Water supply

    Aug 13, 2004 · Apt 1RW

    Close
  • Plumbing

    Basin/sink

    Aug 13, 2004 · Apt 1RW

    Close
  • Heating

    Heat related

    Aug 13, 2004 · Apt 1RW

    Close
  • Plumbing

    Basin/sink

    Jun 29, 2004 · Apt 1RW

    Close
  • Heating

    Heat related

    Jun 14, 2004 · Apt 1RW

    Close
  • Paint/plaster

    Ceiling

    Dec 15, 2003 · Apt 2RW

    Close
  • Paint/plaster

    Ceiling

    Dec 15, 2003 · Apt 2RW

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1889
Floors
5
Residential units
18
Building area
10,070 ft²
Lot area
2,405 ft²
Zoning
M1-5/R7X
Community board
102
Council district
2
Block / lot
531 / 31
Assessed value
$2,274,750
Landmark / historic district
NoHo Historic District Extension

HPD registration #107996, last renewed Sep 4, 2025.

Questions about 36 East 4 Street

Who owns 36 East 4 Street?

The owner of record in NYC Department of City Planning PLUTO data is 34-36 East 4th Street Realty LLC.

Does 36 East 4 Street have violations?

Yes. NYC HPD has recorded 9 housing violations at this property.

Is 36 East 4 Street rent stabilized?

NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 33% of its 18 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 36 East 4 Street built?

City records list 1889 as the year it was built.

How many apartments are in 36 East 4 Street?

It has 18 residential units and 20 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.