roofy

134 West Houston Street

Manhattan, NY 10012BBL 1-00526-0077Map

Owner of record: 134-136 West Houston Street, LLC

134 West Houston Street is a walk-up apartment building built in 1900 in Manhattan, 10012. It has 7 residential units across 8 floors. The owner of record is 134-136 West Houston Street, LLC. HPD has recorded 27 housing violations here, most recently on February 16, 2022. 22 of the 27 most recent violations are still open.

HPD violations
27
DOB violations
20
ECB violations
28
HPD complaints
240

What to know

Concern
12 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Feb 16, 2022

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 27

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 16, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 2, 2015

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 3, 2015

    Closed — Violation dismissed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint the front fire escapes at all stories.

    Sep 17, 2014

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective the fire retarding ceiling at public hall, 3rd story, section at west

    Sep 17, 2014

    Open — Nov sent out
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint balconies at all stories at fire escape, section at south

    Jul 17, 2014

    Open — Nov sent out
  • C

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods and land properly on stair landing at fire escape, section at south

    Jul 17, 2014

    Closed — Violation closed
  • C

    Properly repair the broken or defective mortise lock at vestibule door, basement level.

    Jun 21, 2013

    Open — Nov sent out
  • B

    Properly repair the broken or defective lock at building entrance door at public hall, 1st story

    May 16, 2013

    Open — Nov sent out
Show 17 more ↓
  • C

    M/d law abate the nuisance consisting of pelxi glass at building door from vestibule to public hall basement story

    Feb 15, 2013

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of latch door lock with eyelet capable receiving padlock at scuttle cover at east section 3rd story public hall

    Feb 15, 2013

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of latch door lock with eyelet capable receiving padlock at scuttle cover at west section 3rd story public hall

    Feb 15, 2013

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling,north & east walls in the 2nd room from north at west located at apt 1, 1st story, 1st apartment from west at north

    Jan 26, 2012 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tile walls in the bathroom located at apt 6, 3rd story, 1st apartment from west at north

    Aug 29, 2010 · Apt 6

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color walls in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Jan 22, 2010 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Feb 10, 2009 · Apt 1

    Open — Not complied with
  • C

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2, 1st story, 1st apartment from north at east

    Nov 13, 2006 · Apt 2

    Open — First no access to re- inspect violation
  • C

    M/d law abate the nuisance consisting of radiator free standing in the kitchen located at apt 2, 1st story, 1st apartment from north at east

    Nov 13, 2006 · Apt 2

    Open — First no access to re- inspect violation
  • C

    M/d law abate the nuisance consisting of uncapped shut-off valve of disconnected radiator in the kitchen located at apt 2, 1st story, 1st apartment from north at east

    Nov 13, 2006 · Apt 2

    Open — First no access to re- inspect violation
  • C

    Remove the illegal fastening double cylinder lock at entrance door in the entire apartment located at apt 2, 1st story, 1st apartment from north at east

    Nov 13, 2006 · Apt 2

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling in the 4th room from north at west located at apt 2, 1st story, 1st apartment from north at east

    Nov 13, 2006 · Apt 2

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) wainscotting at south wall, west wall in the 3rd room from north located at apt 2, 1st story, 1st apartment from north at east

    Nov 13, 2006 · Apt 2

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 2, 1st story, 1st apartment from north at east

    Nov 13, 2006 · Apt 2

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling, 1st door from west at north wall in the bathroom located at apt 2, 1st story, 1st apartment from north at east

    Nov 13, 2006 · Apt 2

    Open — First no access to re- inspect violation
  • A

    Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also chain guard in the entrance located at apt 5, 2nd story, 1st apartment from south at west

    Aug 27, 2003 · Apt 5

    Open — First no access to re- inspect violation
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 200 watts. at front areaway

    Jul 31, 2000

    Open — Not complied with

DOB building violations · 20

  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 20, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 20, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 16, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 16, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 24, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 30, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
Show 10 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Plumbing none

    P-plumbing none

    May 17, 2001

    Dob violation - dismissed

ECB violations · 28

  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#917220.rem:submit acceptable required t

    Dec 9, 2022

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction- no handrails. @ time of insp observed that the contractors failed to install handrails for the stairs leading from the 1st flr

    Jun 21, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    Construction superintendent failed to perform to perform duties as per rule. @ time of insp it was observed that the registered construction superintendent, john dibble jr was not present, nor was their any dai

    Jun 21, 2017

    Resolve
  • Class - 1

    Bc3309.9 weatherproof integrity of adjoining buildings. noted: bldg under construction demolished about 90% exposing adjacent buildings atexp2 and 4. cmu wall erected on ground level. swo issued pursuant to

    Aug 18, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3301.2 failure to safeguard. noted: active construction site: bldg partially demolished undermining adjacent properties (exp and 4) swo is pursuant ot 28-207.2 and posted at premises. rmdy: stop all work

    Aug 18, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments. observed at time of inspection approved documents show new c.m.u. wall at exp#3 with dowel's #4 at 24"o.c. drill/epoxy and 4"

    Aug 17, 2016 · Penalty $250

    Resolve
  • Class - 2

    Work does not conform to approved plans work noted.at time of inspect ion in cellar level observed one wall has been removed contrary to approved plans#dm-100.01,job#122230371.wall size approx.12ft length,8ft

    Jul 18, 2016 · Penalty $250

    Resolve
  • Class - 2

    Sec. 3309.8 failure to maintain adjoining walls exposed or breached asa result of demolition or construction operations. at the time of inspection it was observed the contractor partially demolished part of the

    Feb 5, 2016 · Penalty $800

    Resolve
  • Class - 1

    Failure to notify within 24-28 hours of the start of excavation. at the time of inspection it was observed that the excavation opertation for the uderpinning was in progress and there was no notification to dob

    Dec 1, 2015 · Penalty $6,000

    Resolve
  • Class - 1

    Sec. 28-207.2.2 failure to comply w/an order to stop work by dept. noted: a partial stop work order existed on this property for work w/o permit at the 2nd & 3rd fl. at the time of inspection,it was observed

    Oct 7, 2015 · Penalty $8,000

    Resolve
Show 18 more ↓
  • Class - 2

    Failure to safeguard all persons & property affected by construction operation. at the time of inspection,there were debris & broken bricks that fell to the adjoining bldg patio. at exp#2 therefore the contract

    Oct 7, 2015 · Penalty $1,200

    Resolve
  • Class - 2

    Sec. 3301.2 failure to provide 3foot 6inch guardrail or equivalent around all floor & perimeter openings. at the time of inspection there were holes on 2nd & 3rd fl w/o a guardrail protection. this was observed

    Oct 7, 2015 · Penalty $830

    Resolve
  • Class - 2

    Sec. 3306.7 failure to properly shore & brace a weakened structure prior to full or partial demolition. at the time of inspection,it was observed there was a weak wooden bracing both adjoining bldg exp#2 & #4

    Oct 7, 2015 · Penalty $830

    Resolve
  • Class - 1

    Failure to comply w/commissioner's order contained in nov#35004575r issued on 4/18/13. for work w/o a permit. demolition and removal of partitions,electrical and plumbing work and erecting new partitions,ceilin

    Sep 22, 2014

    Resolve
  • Class - 1

    Unlawful acts: failure to comply w/an order of the commissioner. notedrespondent failed to correct conditions cited in nov #35004575r,in that remedy required the obtaining relevant permits. no permits were file

    Jul 15, 2014

    Resolve
  • Class - 1

    Failure to comply w/ commissioner's order to correct conditions cited in nov # 35084575r issued on 04/18/13 for work w/o permit in 2nd fl apt. noted : no permits or compliance documents on file. remedy: comply

    May 19, 2014

    Resolve
  • Class - 1

    Failure to comply w/commissioner's order contained in nov#35084575r issued on 4/18/13. for work w/o a permit. erected partitions,electrical work and plumbing work in apt on the 2nd flr.rmdy: comply w/commission

    Mar 4, 2014

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35084575r issued on 4/18/13. for work w/o a permit. erected partitions,electrical work & plumbing work in apt on the 2nd fl & 2 rea

    Jan 10, 2014 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35084575r issued on 4/18/13. for work w/o a permit. erected partitions,electrical work & plumbing work in apt on the 2nd fl & 2 rea

    Oct 16, 2013 · Penalty $24,000

    Resolve
  • Class - 1

    Failure to comply w/commissioner's order contained in nov #35084575r issued on 4/18/13.for work w/o a permit.erected partition,electric workwith plumbing work in apt on the 2nd flr and 2 rear apts on 3rd flr.

    Aug 21, 2013 · Penalty $2,400

    Resolve
  • Class - 3

    Failure to maintain building in a code compliant manner.defects noted:at time of inspection there are cracks and water damage in hallways & stairwells. rmdy: repair and/or replace.

    Jun 3, 2013 · Penalty $500

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35004575r issued on 4/18/13. partition electric work w/plumbing work in apt on the 2nd fl. remedy: comply w/the comm's order.

    Jun 1, 2013 · Penalty $2,430

    Resolve
  • Class - 1

    Work w/o a permit-work noted: demolition and removal of partitions,electrical and plumbing work and erecting new partitions,ceiling with newelectrical work and plumbing work throughout in one apt. on 2nd flr &

    Apr 18, 2013 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner.noted:water leaking into apt #1,water damage at entrance foyer spalling concrete open walls at foyer bathroom ceiling saturated sagging from water,at kitche

    Jan 15, 2010 · Penalty $250

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner.no fire stopping per bc712.3. & 27-345:noted at 1st fl apt #1 removal of fire rated material at entrance-ceiling wall at 2nd fl apt #4 hole in ceiling expos

    Jan 15, 2010 · Penalty $250

    Resolve
  • Class - 2

    Failure to maintain building in code complaint manner. noted: on 2nd floor apartment designated # cracked unkeyed/dislodged plater on bedroom wall and ceiling on east wall. in kitchen missing 1- 12'x12" ceilin

    Feb 13, 2009 · Penalty $250

    Resolve
  • Non-hazardous

    B4a/16/33a/50/50a/50b/50c/50d/50e 50-anti syghon on steam guage 50a-nopressure relief valve on domestic water coils 50b-no drop tube on low water cut off 50d-air tank guage defective also or shut off valve at

    Aug 26, 2005 · Penalty $180

    Resolve
  • Unknown

    Work without a permit. work noted: removed existing partitons and installed new metal studs at bathroom basement level. remedy: stop all work, until a permit has been obtained.

    Jun 22, 1988

    Resolve

Complaints

  • Electric

    Lighting

    Sep 30, 2014 · Apt 1

    Close
  • Electric

    Wiring

    Sep 30, 2014 · Apt 1

    Close
  • Heating

    Heat related

    Dec 7, 2013 · Apt NA

    Close
  • Nonconst

    Janitor/super

    Oct 19, 2013 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Oct 19, 2013 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Oct 19, 2013 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Oct 19, 2013 · Apt 5

    Close
  • Heating

    Heat-plant

    Oct 19, 2013 · Apt 5

    Close
  • Electric

    Electric-supply

    Oct 19, 2013 · Apt 5

    Close
  • Electric

    Lighting

    Oct 19, 2013 · Apt 5

    Close
Show 40 more ↓
  • Plumbing

    Water-leaks

    Oct 19, 2013 · Apt 5

    Close
  • Heating

    Heat related

    Oct 16, 2013 · Apt NA

    Close
  • Plumbing

    Water-leaks

    Oct 14, 2013 · Apt 1

    Close
  • Heating

    Heat related

    Oct 14, 2013 · Apt 5

    Close
  • Heating

    Heat related

    Jul 31, 2013 · Apt 1

    Close
  • Heating

    Heat related

    Jul 26, 2013 · Apt 1

    Close
  • Paint/plaster

    Wall

    Jul 2, 2013 · Apt 1

    Close
  • Construction

    Roof

    Jul 2, 2013 · Apt 1

    Close
  • Plumbing

    Water-leaks

    Jul 2, 2013 · Apt 1

    Close
  • General

    Doors

    Jun 15, 2013 · Apt 1

    Close
  • General

    Locks

    Jun 15, 2013 · Apt 1

    Close
  • Construction

    Roof

    Jun 15, 2013 · Apt 5

    Close
  • General

    Locks

    Jun 15, 2013 · Apt 5

    Close
  • General

    Locks

    May 14, 2013 · Apt BLDG

    Close
  • Electric

    Electric-supply

    May 6, 2013 · Apt 5

    Close
  • Heating

    Heat related

    Feb 13, 2013 · Apt 5

    Close
  • Heating

    Heat related

    Feb 13, 2013 · Apt 1

    Close
  • Heating

    Heat related

    Dec 9, 2012 · Apt NA

    Close
  • General

    Windows

    Jan 19, 2012 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Jan 19, 2012 · Apt 1

    Close
  • General

    Doors

    Jan 19, 2012 · Apt 1

    Close
  • General

    Doors

    Jan 19, 2012 · Apt 1

    Close
  • Paint/plaster

    Wall

    Jan 19, 2012 · Apt 1

    Close
  • Heating

    Heat related

    Dec 16, 2011 · Apt 1

    Close
  • Heating

    Heat related

    Dec 11, 2011 · Apt 1

    Close
  • Heating

    Heat related

    Dec 1, 2011 · Apt 1

    Close
  • Heating

    Heat related

    Oct 29, 2011 · Apt 6

    Close
  • Heating

    Heat related

    Oct 29, 2011 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Oct 3, 2011 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Oct 3, 2011 · Apt 1

    Close
  • General

    Windows

    Oct 3, 2011 · Apt 1

    Close
  • General

    Doors

    Oct 3, 2011 · Apt 1

    Close
  • Paint/plaster

    Wall

    Oct 3, 2011 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Oct 3, 2011 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Oct 3, 2011 · Apt 1

    Close
  • Paint/plaster

    Wall

    Oct 3, 2011 · Apt 1

    Close
  • Plumbing

    Water-leaks

    Oct 3, 2011 · Apt 1

    Close
  • Plumbing

    Water-leaks

    Oct 3, 2011 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Jul 27, 2011 · Apt 1

    Close
  • General

    Windows

    Jul 27, 2011 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1900
Floors
8
Residential units
7
Building area
20,547 ft²
Lot area
3,110 ft²
Zoning
R7-2
Community board
102
Council district
2
Block / lot
526 / 77
Assessed value
$6,498,450
Landmark / historic district
No

HPD registration #125574, last renewed Oct 29, 2025.

Questions about 134 West Houston Street

Who owns 134 West Houston Street?

The owner of record in NYC Department of City Planning PLUTO data is 134-136 West Houston Street, LLC.

Does 134 West Houston Street have violations?

Yes. NYC HPD has recorded 27 housing violations at this property.

Is 134 West Houston Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 134 West Houston Street built?

City records list 1900 as the year it was built.

How many apartments are in 134 West Houston Street?

It has 7 residential units and 9 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.