228 Mott Street
Manhattan, NY 10012BBL 1-00493-0009Map
Owner of record: 228 Mott St. LLC
228 Mott Street is a walk-up apartment building built in 1900 in Manhattan, 10012. It has 14 residential units across 6 floors. The owner of record is 228 Mott St. LLC. HPD has recorded 15 housing violations here, most recently on May 18, 2022. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 15
- DOB violations
- 5
- ECB violations
- 8
- HPD complaints
- 73
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 15
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 18, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing
May 18, 2022
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
May 18, 2022
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at the east and south walls at public hall, 5th story
May 18, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east and south walls at public hall, 5th story
May 18, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 18, 2022
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balconies and all components at fire escape building front
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 21, 2015
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at the north wall at public hall, 1st story
Apr 21, 2015
Closed — Violation dismissed
Show 5 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1w, 1st story, 1st apartment from west at north
Nov 6, 2005 · Apt 1W
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 6, 2005
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pot on 2 sty front west at party wall balcony
Sep 23, 2005
Closed — Violation closed - BHazardous
Properly repair the broken or defective disconnected intercom system at front building entrance.
Sep 9, 2005
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective all concrete treads, 1st floor to 2nd floor, at public hall, 1st story
Jun 8, 2005
Closed — Violation closed
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 28, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed
ECB violations · 8
- Class - 1
Failure to comply and submit certificate of correction for violation # 39057990z issued on 03/13/2022 for failure to maintain building in code-compliant manner. (condition remains same), repair and/replace
Aug 14, 2025 · Penalty $2,500
Active - Class - 1
Failure to maintain building in code-complaint manner. at time of inspection at exposure 1(front) and 4(right),1st,2nd and 3rd floor, running and step cracks, deteriorated joints at bricks and window openings.
Aug 8, 2025 · Penalty $2,500
Active - Class - 2
Failure to maintain building in a code-compliant manner. at time of inspection, observed bilco hatch door opening for the cellar stair access. staircase improperly installed creating an egress issue for mainten
Mar 14, 2022 · Penalty $1,562
Resolve - Class - 1
Failure to maintain building in a code compliant manner. at time of inspection, observed damaged/cracked brick around the fire escape bracing, broken missing pieces of the stone window sills and headers/lintels
Mar 14, 2022 · Penalty $1,280
Active - Class - 3
Failure to maintain bldg in a code compliant manner.defects noted:@ time of inspection door frame & walls around door frame are cracked @ int & ext of apt 5b.also noted:there is water damage observed to walls &
May 18, 2011
Resolve - Hazardous
Plumbing work w/o a permit hazardous location cellar hot water heater & water storage tank installed w/o a permit gas supply pipe to hot water heater installed not according national fuel gas code s 2 6.8 a (pi
Sep 27, 2006 · Penalty $1,000
Resolve - Non-hazardous
Failure to mainrain building.in that water is accumulation at the 2nd stiry roof exterior due to no nrain has been provided.approx 1 inch of water has accumulated at entire area.remedy:remove water and provide
Jul 11, 2005 · Penalty $350
Resolve - Non-hazardous
Work contrary to plans under applicaiton #104057974 in that new metal pan stair installed from 1st floor to 2nd floor hallway is not shown plans remedy:conform to plans
May 18, 2005
Resolve
Complaints
- General
Ventilation system
Jun 27, 2025 · Apt 6D
Close - Unsanitary condition
Mold
Jun 27, 2025 · Apt 6D
Close - Flooring/stairs
Floor
Apr 11, 2022 · Apt 6C
Close - Plumbing
Water supply
Mar 6, 2022 · Apt 3B
Close - Heat/hot water
Entire building
Mar 6, 2022 · Apt 3B
Close - Plumbing
Water supply
Mar 6, 2022 · Apt 3B
Close - Heat/hot water
Entire building
Mar 6, 2022 · Apt 1A
Close - Heat/hot water
Entire building
Jul 8, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 5, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 29, 2016 · Apt 5B
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Jan 20, 2016 · Apt 5B
Close - Heat/hot water
Apartment only
Dec 21, 2015 · Apt E1
Close - Nonconst
Vermin
Sep 6, 2013 · Apt 5A
Close - Nonconst
Vermin
Sep 6, 2013 · Apt 5A
Close - Plumbing
Sewer
Jun 25, 2013 · Apt 4B
Close - General
Doors
Feb 12, 2012 · Apt 6C
Close - Plumbing
Water-leaks
Feb 12, 2012 · Apt 6C
Close - General
Windows
Feb 12, 2012 · Apt 6C
Close - General
Doors
Sep 5, 2011 · Apt E1
Close - Paint/plaster
Wall
Sep 5, 2011 · Apt E1
Close - Paint/plaster
Wall
Sep 5, 2011 · Apt E1
Close - General
Locks
Jul 20, 2011 · Apt E1
Close - General
Doors
Jul 20, 2011 · Apt E1
Close - Paint/plaster
Wall
Jul 20, 2011 · Apt E1
Close - Heating
Heat related
Nov 5, 2006 · Apt E1
Close - Plumbing
Shower-stall
Apr 4, 2006 · Apt E1
Close - Heating
Heat related
Feb 18, 2006 · Apt BLDG
Close - Heating
Heat related
Feb 8, 2006 · Apt BLDG
Close - Heating
Heat related
Feb 7, 2006 · Apt D2
Close - Heating
Heat related
Jan 15, 2006 · Apt E1
Close - Heating
Heat related
Jan 15, 2006 · Apt E1
Close - General
Doors
Jan 15, 2006 · Apt E1
Close - Heating
Heat related
Nov 6, 2005 · Apt E1
Close - Heating
Heat related
Nov 6, 2005 · Apt BLDG
Close - Plumbing
Water supply
Nov 5, 2005 · Apt 1W
Close - Heating
Heat related
Oct 23, 2005 · Apt E1
Close - Electric
Lighting
Aug 28, 2005 · Apt E1
Close - General
Doors
Aug 28, 2005 · Apt E1
Close - Plumbing
Water-leaks
Aug 15, 2005 · Apt E1
Close - Paint/plaster
Ceiling
Aug 15, 2005 · Apt E1
Close - Plumbing
Water-leaks
Aug 15, 2005 · Apt E1
Close - Paint/plaster
Ceiling
Aug 15, 2005 · Apt E1
Close - Paint/plaster
Ceiling
Aug 15, 2005 · Apt E1
Close - Paint/plaster
Ceiling
Aug 15, 2005 · Apt E1
Close - Electric
Bell-buzzer/intercom
Aug 15, 2005 · Apt D2
Close - Electric
Wiring
Aug 13, 2005 · Apt E1
Close - Electric
Wiring
Aug 13, 2005 · Apt E1
Close - Paint/plaster
Wall
Aug 13, 2005 · Apt E1
Close - Plumbing
Radiator
Aug 12, 2005 · Apt E1
Close - Paint/plaster
Ceiling
Aug 12, 2005 · Apt E1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1900
- Floors
- 6
- Residential units
- 14
- Building area
- 8,010 ft²
- Lot area
- 2,457 ft²
- Zoning
- C6-2
- Community board
- 102
- Council district
- 1
- Block / lot
- 493 / 9
- Assessed value
- $820,350
- Landmark / historic district
- No
HPD registration #136607, last renewed Aug 20, 2025.
Questions about 228 Mott Street
Who owns 228 Mott Street?
The owner of record in NYC Department of City Planning PLUTO data is 228 Mott St. LLC.
Does 228 Mott Street have violations?
Yes. NYC HPD has recorded 15 housing violations at this property.
Is 228 Mott Street rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 14% of its 14 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 228 Mott Street built?
City records list 1900 as the year it was built.
How many apartments are in 228 Mott Street?
It has 14 residential units and 16 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.