19 Cleveland Place
Manhattan, NY 10012BBL 1-00481-0009Map
Owner of record: Fontana Realty LLC
19 Cleveland Place is a walk-up apartment building built in 1900 in Manhattan, 10012. It has 16 residential units across 5 floors. The owner of record is Fontana Realty LLC. HPD has recorded 79 housing violations here, most recently on July 15, 2026. 5 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 79
- DOB violations
- 9
- ECB violations
- 25
- HPD complaints
- 203
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 79
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door leadind to roof at 1st public hall stairs from east, 5th story
Jul 15, 2026
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jun 21, 2026
Closed — Violation dismissed - BHazardous
Remove the illegal fastening illegal panic bar installed on bulkhead door, preventing re-entry into the public hall , 5th story
Jun 3, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 3, 2026
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
May 13, 2026
Closed — Violation dismissed - BHazardous
Fire egress defective. remove the obstruction in fireproof passageway household storage and construction materials at fire passage way
May 13, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at public hall, 5th story
May 13, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 1st room from north at west, the 2nd room from north located at apt 4a, 5th story, 1st apartment from south at west
Jan 31, 2026 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3b, 4th story, 1st apartment from west at north
Jan 29, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of garbage cans at fire passage way at north
Jan 22, 2026
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4a, 5th story, 1st apartment from south at west
Jan 22, 2026 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Jan 11, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 5th story, 1st apartment from south at west
Jan 11, 2026 · Apt 4A
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of pests. evidence of flies at fire passage way, 1st story
Aug 26, 2025
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of pests. evidence of maggots at yard at east at fire passage way, 1st story
Aug 26, 2025
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the yard at east at fire passage way, 1st story
Aug 26, 2025
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 26, 2025
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jul 31, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kick stand stopper at the building entrance door , 1st story
Feb 14, 2024
Closed — Violation dismissed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods .. at 2nd fire escape from north
Jan 28, 2024
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the restaurant's waste and supplyies at rear yard
Jan 28, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame at bulkhead to the roof , 5th story
Jan 28, 2024
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exeeding 130 degree at fixtures in the entire apartment located at apt 4a, 5th story, 1st apartment from south at west
Nov 12, 2023 · Apt 4A
Open — Invalid certification - CImmediately hazardous
M/d law abate the nuisance consisting of consisting of hot water temperature of 178 degrees fahnrenheit at sink exceeding the maximum hot water 130 f allowed in the kitchen located at apt 4a, 5th story, 1st apartment from south at west
Oct 17, 2023 · Apt 4A
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the north passageway , 1st story
Aug 25, 2023
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 25, 2023
Closed — Violation dismissed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the trash bags, boxes, and all house hold items , 1st story
Aug 25, 2023
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 6, 2023
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water 135f exceeding the maximum allowable temperature of 130 degrees in the entire apartment located at apt 4a, 5th story, 1st apartment from south at west
Jan 3, 2023 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature 135 f exceeds allowable temperature of 130 f thermometer number 29103 in the kitchen located at apt 4a, 4th story, 1st apartment from south at west
Jul 26, 2021 · Apt 4A
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east fire passageway
Mar 16, 2021
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing garbage receptacle covers at building front east
Mar 16, 2021
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at the north wall bathtub in the bathroom located at apt 4a, 5th story, 1st apartment from south at west
Mar 12, 2021 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at the north wall washbasin in the bathroom located at apt 4a, 5th story, 1st apartment from south at west
Mar 12, 2021 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at washbasin in the kitchenette located at apt 4a, 5th story, 1st apartment from south at west
Mar 12, 2021 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective bell buzzer intercom system from the building entrance door to the apartment wall panel located at apt 4a, 5th story, 1st apartment from south at west
Mar 12, 2021 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the 1st room from north at west located at apt 4a, 5th story, 1st apartment from south at west
Jan 27, 2021 · Apt 4A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 4a, 5th story, 1st apartment from south at west
Jan 27, 2021 · Apt 4A
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceed maximum allowable temperature of 130 degrees. 164 degrees supplied at all plumbing fixtures. located at apt 4a, 5th story, 1st apartment from south at west
Jan 27, 2021 · Apt 4A
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Dec 8, 2020
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material. yard
Feb 15, 2020
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the 2nd room from north at west located at apt 4a, 5th story, 1st apartment from south at west
Dec 4, 2018 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 2nd room from north at west located at apt 4a, 5th story, 1st apartment from south at west
Dec 4, 2018 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective radiator air valve west wall in the 2nd room from north at west located at apt 4a, 5th story, 1st apartment from south at west
Nov 24, 2018 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing escutcheon plate around heat riser at floor in the bathroom located at apt 4a, 5th story, 1st apartment from south at west
Nov 24, 2018 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective radiator air valve at west wall in the 1st room from north at west located at apt 4a, 5th story, 1st apartment from south at west
Nov 24, 2018 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system key not on premises at public hall, 1st story
Oct 23, 2018
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the 2nd room from north at east located at apt 4a, 5th story, 1st apartment from south at west
Sep 28, 2018 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; located at apt 4a, 5th story, 1st apartment from south at west
Sep 28, 2018 · Apt 4A
Closed — Violation dismissed
DOB building violations · 9
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 16, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 12, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 3, 2024
Dob violation - active - Immediate emergency anythingoptional
Provide a sidewalk shed 32 feet at the front of the building plus 5 feet
Apr 26, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 14, 2018
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 5, 1997
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Dec 5, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Electric signs none
Es-electric signs none
Jul 5, 1990
Dob violation - dismissed
ECB violations · 25
- Class - 2
Cellar level in many area's firestop not done, holes and gaps filled with foam no firestop used. (fire block foam cannot be substituted for firestop), provide/maintain fire stopping
Oct 27, 2025 · Penalty $625
Resolve - Class - 2
Emergency exit lighting not working when tested on 1st floor and cellar level. (units need new batteries), provide adequate power for emergency exit lighting
Oct 27, 2025 · Penalty $625
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. violation has been corrected however no certificate of correction is on file as of 10/17/202
Oct 17, 2025 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. at time of inspection some trash bags were in ally way but there was more then 36''of walk w
Oct 17, 2025 · Penalty $6,250
Active - Class - 1
Failure to maintain building in code-compliant manner. at time of inspection material and supplies are still being stored in outside ally way at exp#2 ., repair and/replace
Oct 17, 2025 · Penalty $25,000
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. violation has been corrected however no certificate of correction on file as of 12/17/25 for
Oct 17, 2025 · Penalty $3,125
Resolve - Class - 2
Failure to maintain building in code-compliant manner. at time of inspection observed building entrance hallway partially obstructed by household items. at exposure #2 where fire escapes are located observed em
May 11, 2025 · Penalty $1,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for violations 35667951z, 35676671z, and 39104366y., file a certificate of correction
Feb 21, 2025 · Penalty $3,125
Resolve - Class - 1
Failure to maintain building in a code compliant manner. combustible material below fire escape and chemicals stored in open air alleyway that is a hazard to buildings 19 and 21 cleveland place and public., rep
Feb 21, 2025 · Penalty $5,000
Active - Class - 1
Failure to maintain second means of egress. at time of inspection observed a substantial amount of debris including household items, garbage, work supplies and boxes obstructing the passageway below the fire es
Jun 21, 2024 · Penalty $3,125
Active
Show 15 more ↓
- Class - 1
Failure to provide unobstructed exit passageway-note at main exit passageway at the base observed box and handicap stroller obstructed the main entrance. remedy: remove obstruction.
Mar 19, 2024 · Penalty $312
Resolve - Class - 1
At time of inspection observed restaurant items, self, garbage & garbage stored on emergency exit passageway on exposure # 02. also observed 2-active exterior fire escapes on expo # 01. the storage on passagewa
Jan 25, 2024 · Penalty $1,250
Active - Class - 1
At 4th floor, in hallway and landing of roof top door, step ladder, bicycle and stroller obstruct exit passageway., remove obstruction
Oct 6, 2023 · Penalty $625
Resolve - Class - 1
Failure to maintain building in code compliant manner.noted exterior brick facade at front is cracked vertically and spalling located above the main entrance to the building and public sidewalk on the 2nd floor
Apr 26, 2023 · Penalty $6,250
Resolve - Class - 2
Failure to maintain building in code-compliant manner. note : upon inspection, observed exterior wall in a state of disrepair with substantial cracks along window frame and lintel at exposure 1 at this location
Aug 23, 2022 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35343744p issued on 08-15-18& to file a c of c pursuant to 28-201.1 & 1rcny 1 02-01. no cert of correction on record. remedy: comply w/comm's order
Sep 29, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to provide unobstructed exit passageway. at 1st fl landing there are 2 large furniture boxes blocking the staircase and entry/exit door. the boxes have apt #3a, there was no response to bell at that apt
Aug 15, 2018 · Penalty $625
Resolve - Class - 1
Filed a certificate, form, application etc containing a material falsestatements. noted: false filing on pw2 on application #123114897 item #26 checked "no" fo rbuilding being occupied or rent regulated when in
Aug 10, 2018 · Penalty $2,500
Resolve - Class - 2
B254,25a,50 as per class 2 (b254) 28-301.1 violating condition #25a and 50 site glass correct violating condition and submit a certificateof correction.
Apr 5, 2018 · Penalty $625
Resolve - Class - 2
Failure to comply w/commissioner's order contained in nov#35180581x issued on 05/11/16 and to file a certificate of correction pursuant to 28-201.1,28-204.4 and 1rcny 102-01. rmdy:comply w/commissioner's order
Jul 8, 2016 · Penalty $400
Resolve - Class - 1
Failure to maintain bldg in code compliant manner.noted @ left side ofbldg,fire passage & side yard exp2,fire escape & fire escape drop ladder is obstructed w/ cardboard pile,hand trucks ladder,plastic storage
May 11, 2016 · Penalty $1,000
Resolve - Class - 2
W/o a permit. at 1st story commercial space installed projecting business accessory sign "mexican radio" approx 5' wide x 4' high x ' projection. remedy: obtain permits or restore to prior legal condition
Sep 29, 2014 · Penalty $800
Active - Non-hazardous
Occupancy contrary to that allowed in the certificate of occupancy. noted: cellar and 1st floor level of premises being used as an eating and drinking establishment with a combined total capacity seating appr
Feb 11, 1998 · Penalty $800
Resolve - Non-hazardous
Operation of a place of assembly without a current permit. noted:-1st fl comm space occupied with seating for approx 80 person's d.b.a. jet simple location: 1st fl & cellar remedy: obtain a p,a permit from dept
Nov 6, 1997 · Penalty $100
Resolve - Non-hazardous
Occupancy contrary to dept recor 7 without a c of o north side yard being used for dining area in conjuction with rest at 1 sty. remedy remove all tables 7 chairs from rear north yard or obtain permit if feasib
Jul 24, 1989
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Jun 7, 2026 · Apt 4A
Close - Safety
Fire escape
Jun 4, 2026 · Apt BLDG
Close - Door/window
Door
May 14, 2026 · Apt 4A
Close - Electric
No lighting
May 14, 2026 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
May 5, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Feb 7, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 3B
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 2C
Close
Show 40 more ↓
- Door/window
Door
Jan 25, 2026 · Apt 4A
Close - Electric
Lighting
Jan 25, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 19, 2026 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Jan 17, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 15, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 9, 2026 · Apt 4A
Close - Plumbing
Water supply
Jan 8, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Jan 3, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 1, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 30, 2025 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Oct 4, 2025 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Aug 25, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 9, 2025 · Apt 5THFL
Close - Unsanitary condition
Garbage/recycling storage
Jul 2, 2025 · Apt 4A
Close - Unsanitary condition
Pests
Jul 2, 2025 · Apt 4A
Close - Heat/hot water
Apartment only
May 10, 2025 · Apt 4A
Close - Heat/hot water
Apartment only
Apr 18, 2025 · Apt 4A
Close - Heat/hot water
Apartment only
Apr 8, 2025 · Apt 4A
Close - Heat/hot water
Entire building
Jan 30, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 14, 2025 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 8, 2025 · Apt 4A
Close - Unsanitary condition
Pests
Dec 22, 2024 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Dec 22, 2024 · Apt 4A
Close - Unsanitary condition
Pests
Dec 22, 2024 · Apt 4A
Close - Heat/hot water
Apartment only
Dec 22, 2024 · Apt 4A
Close - Door/window
Door
Nov 5, 2024 · Apt 4A
Close - Heat/hot water
Entire building
Nov 5, 2024 · Apt 4A
Close - Heat/hot water
Entire building
Oct 27, 2024 · Apt 4A
Close - Heat/hot water
Entire building
Oct 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 10, 2024 · Apt BLDG
Close - Plumbing
Water supply
Oct 2, 2024 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Sep 7, 2024 · Apt 4A
Close - Unsanitary condition
Pests
Sep 7, 2024 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Sep 7, 2024 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Sep 7, 2024 · Apt 4A
Close - Heat/hot water
Entire building
Sep 7, 2024 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Jun 19, 2024 · Apt 4A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1900
- Floors
- 5
- Residential units
- 16
- Building area
- 11,775 ft²
- Lot area
- 2,680 ft²
- Zoning
- C6-1
- Community board
- 102
- Council district
- 1
- Block / lot
- 481 / 9
- Assessed value
- $1,974,150
- Landmark / historic district
- No
HPD registration #139038, last renewed Jul 15, 2026.
Questions about 19 Cleveland Place
Who owns 19 Cleveland Place?
The owner of record in NYC Department of City Planning PLUTO data is Fontana Realty LLC.
Does 19 Cleveland Place have violations?
Yes. NYC HPD has recorded 79 housing violations at this property.
Is 19 Cleveland Place rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 38% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 19 Cleveland Place built?
City records list 1900 as the year it was built.
How many apartments are in 19 Cleveland Place?
It has 16 residential units and 17 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.