180 Mulberry Street
Manhattan, NY 10012BBL 1-00480-0002Map
Owner of record: 180 Mulberry Realty LLC
180 Mulberry Street is a walk-up apartment building built in 1910 in Manhattan, 10012. It has 12 residential units across 5 floors. The owner of record is 180 Mulberry Realty LLC. HPD has recorded 4 housing violations here, most recently on February 16, 2022. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 4
- DOB violations
- 3
- ECB violations
- 26
- HPD complaints
- 10
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 4
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2015
Closed — Violation dismissed
DOB building violations · 3
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
ECB violations · 26
- Class - 1
Permanent dwelling used/converted for other than permanent residentialpurposes. dob records indicates premises to be legally approved as a class "a" multiple dwelling. now apartment 3b on the 3rd floor is being
May 19, 2026 · Penalty $70,000
Active - Class - 1
Failure to maintain building in a code-compliant manner. lack of required number of means of egress for every floor per bc 1018.1(2008 code); 27-366; bc 1021.1(2014 code); bc 1006.3(2022 code) for transient use
May 19, 2026 · Penalty $25,000
Active - Class - 1
Failure to maintain building in a code-compliant manner. lack of a system of automatic sprinklers where required as per bc 903.2 and 27-954 for transient use at apartment 3b on the 3rd floor. previous ecb viola
May 19, 2026 · Penalty $25,000
Active - Class - 1
Bc 907.2.8. failure to provide fire alarm system(class j) for transient yse at apartment 3b on the 3rd floor. previous ecb violation #35727741m. remedy: discontinue illegal occupancy.
May 19, 2026 · Penalty $25,000
Active - Class - 1
Failure to provide the required class "j" fire alarm system for transient use at apartment 3b. remedy: discontinue illegal occupancy. ______________________________________________________________________
Apr 28, 2026
Resolve - Class - 1
Bc 907.2.8. failure to provide the required class "j" fire alarm system for transient use at apartment 3b. remedy: discontinue illegal occupancy.
Apr 28, 2026 · Penalty $2,500
Active - Class - 2
Permanent dwelling used/converted for other than permanent residentialpurposes. premises to be legally approved as a class "a" multiple dwelling. now apartment 3b is used/converted to transient, having 2 guests
Apr 28, 2026 · Penalty $10,000
Active - Class - 1
Failure to maintain building in a code-compliant manner. failure to provide the required number of means of egress for every floor as per bc1018.1(2008: bc 1021.1(2014); bc 1006.3(2022) and 27-366 for transient
Apr 28, 2026 · Penalty $12,500
Active - Class - 1
Failure to maintain building in a code-compliant manner. lack of a system of a automatic sprinklers where required as per bc 903.2 and 27-954 for transient use at apartment 3b. remedy: discontinue illegal occup
Apr 28, 2026 · Penalty $12,500
Active - Class - 1
Failure to maintain building wall(s) or appurtenances.noted:window ac units improperly supported with bricks,also missing support at 2nd,3rd&4th floors,with 2nd floor directly above the entry to 1 building and
Apr 27, 2021 · Penalty $2,500
Resolve
Show 16 more ↓
- Hazardous
Use or installation of plumbing materials on equipment which do not comply with rs-16. observed 2" pvc trap installed on bathroom sink in first floor store (north side). also observed 2" pipe being used for the
Oct 25, 2005 · Penalty $200
Resolve - Non-hazardous
Failure to safely and properly remove debris from construction site. wooden and metal studs are being stored at courtyard with other construction debris and garbage covered with paper creating a fire hazard. no
Oct 3, 2005 · Penalty $500
Resolve - Non-hazardous
Failure to provide approved plans at time of inspection.noted:work in progress under permit# 103784362 issued 7/12/04 exp. 5/21/05 w/o approved plans on site. remedy: stop all work/provide approved plans
Apr 7, 2005 · Penalty $130
Resolve - Hazardous
Failure to properly store combustible material or other material and equipment noted:combustible material approx. 16' x 6' height. being stored in rear yard. wood pallets, wood paneling, rosin paper, wood plank
Apr 7, 2005 · Penalty $900
Resolve - Hazardous
Exit passageway or corridor total obstruction.1- fire escape window of apt 5b is in operable. 2-drop ladder fire escape obstructed by pile of debris in rear yard. 3-public hall at first floor obstructed by mult
Apr 7, 2005 · Penalty $480
Resolve - Hazardous
Failure to property store combustible and other material noted (1) bricks furniture metal studs lumber card board boxes insulation material improperly stock piled in rear court yard remedy:store material proper
Mar 17, 2005 · Penalty $900
Resolve - Hazardous
Failure to saftey & property remove debris from construction site noted: construction debris (metal studs insulation material ceiling material)thrown from 3rd floor apartment #3a window at rear onto courtyard
Mar 11, 2005 · Penalty $500
Resolve - Hazardous
Failure to maintain plumbing and or appurtenances -hazardous 1st floorno water supply to bathroom in store remedy:maintain plumbing and or appurtenances
Mar 10, 2005 · Penalty $800
Resolve - Non-hazardous
Work without a permit noted(1) at cellar of rear buidling excavated existing floor ground approx 30 deep poured concrete flooring (12'0 x 20-0" area incomplete)constructed cinder block retaining wall 30' high a
Feb 17, 2005 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior building wall. noted: north west corner- west e levations cracks in brick and stove masnry at 2nd and 3rd floorremedy: provide structural stability report from p.e. or r.a. erect si
May 29, 2002 · Penalty $800
Resolve - Non-hazardous
Little italy special purpose district operation of a wholesale food establishment on south side of building 1st floor c. & w. trading co. use not permitted on special district. remedy:discontinue illegal use.
Jul 22, 1998 · Penalty $2,500
Resolve - Non-hazardous
Di premises located in c 6-2 zoning district. noted:-1st fl comm spacenorth-side now used as a "welding workship" manufacturing metal guard's & gates d,b,a. t l iron work company location 1st fl north-side comm
Sep 17, 1997 · Penalty $240
Resolve - Non-hazardous
Work without a permit work noted erect a walkin frezzer on first floor store at south side complete remedy obtain a permit if feasible or resotre premises to prior legal condition
Jul 9, 1996
Resolve - Hazardous
Failure to provide atleast two means of egress from the 2nd to the 5th floor at the front apartments no front fire escape railroad flats have been subdivided remedy provide a 2 neams of egress
Jun 16, 1993
Resolve - Hazardous
Failure to provide at least two means of egress from the 2nd to the 5th floor at the front apartment. remedy: provide two means of egress.
Dec 12, 1991 · Penalty $500
Resolve - Non-hazardous
Work without a permit work noted 1. six cubicals at cellar north const. with sheet partitions. 2. new tiolets sinks installed at cellar. new hvac duct at cellar. cellar being used for sleeping area.
Jun 8, 1989 · Penalty $500
Resolve
Complaints
- Heating
Heat related
Feb 22, 2012 · Apt 2A
Close - Heating
Heat related
Feb 5, 2007 · Apt 2A
Close - General
Cooking gas
Jun 7, 2005 · Apt 2R
Close - Nonconst
Smoke-fumes
Mar 10, 2005 · Apt BLDG
Close - Heating
Heat related
Jan 30, 2005 · Apt 2R
Close - Nonconst
Smoke-fumes
Jan 26, 2005 · Apt BLDG
Close - Nonconst
Smoke-fumes
Jan 26, 2005 · Apt BLDG
Close - Nonconst
Smoke-fumes
Jan 26, 2005 · Apt BLDG
Close - Nonconst
Smoke detector
Jan 23, 2005 · Apt BLDG
Close - Heating
Heat related
Jan 9, 2004 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 5
- Residential units
- 12
- Building area
- 9,392 ft²
- Lot area
- 2,516 ft²
- Zoning
- C6-1
- Community board
- 102
- Council district
- 1
- Block / lot
- 480 / 2
- Assessed value
- $1,072,800
- Landmark / historic district
- No
HPD registration #107984, last renewed Nov 6, 2025.
Questions about 180 Mulberry Street
Who owns 180 Mulberry Street?
The owner of record in NYC Department of City Planning PLUTO data is 180 Mulberry Realty LLC.
Does 180 Mulberry Street have violations?
Yes. NYC HPD has recorded 4 housing violations at this property.
Is 180 Mulberry Street rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 25% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 180 Mulberry Street built?
City records list 1910 as the year it was built.
How many apartments are in 180 Mulberry Street?
It has 12 residential units and 14 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.