29 St Marks Place
Manhattan, NY 10003BBL 1-00464-0045Map
Owner of record: St. Marks Properties I, LLC
29 St Marks Place is a walk-up apartment building built in 1900 in Manhattan, 10003. It has 8 residential units across 4 floors. The owner of record is St. Marks Properties I, LLC. HPD has recorded 39 housing violations here, most recently on February 15, 2026. 13 of the 39 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.
- HPD violations
- 39
- DOB violations
- 24
- ECB violations
- 23
- HPD complaints
- 55
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 39
- BHazardous
Refit upper window sash at south wall in the 3rd room from north located at apt 2a, 2nd story, 1st apartment from north at east
Feb 15, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Feb 15, 2026 · Apt 2A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sqft at north and east wall tiles in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east
Feb 15, 2026 · Apt 2A
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10sqft at north and east wall tiles in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east original violation 18648028 issued 15-feb-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Feb 15, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Feb 15, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 3b, 4th story, 1st apartment from north at east
Oct 7, 2025 · Apt 3B
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate in the entire apartment located at apt 3b, 4th story, 1st apartment from north at east
Feb 14, 2025 · Apt 3B
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3b, 4th story, 1st apartment from north at east
Feb 14, 2025 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3b, 4th story, 1st apartment from north at east
Feb 14, 2025 · Apt 3B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall at public hall, 4th story
Feb 14, 2025
Closed — Violation closed
Show 29 more ↓
- CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3b, 4th story, 1st apartment from north at east
Feb 14, 2025 · Apt 3B
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective fire retardant material east wall at public hall, 4th story
Feb 14, 2025
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of uneven floor in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Jul 14, 2023 · Apt 3B
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Jul 14, 2023 · Apt 3B
Open — Not complied with - BHazardous
Remove all encumbrances consisting of house hold items, paint supplies, night stand at public hall, 4th story
Jul 14, 2023
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 4th story
Jul 14, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at public hall, 4th story
Jul 14, 2023
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 4th story
Jul 14, 2023
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 3b, 3rd story, 1st apartment from north at east
Jul 14, 2023 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 3b, 3rd story, 1st apartment from north at east
Jul 14, 2023 · Apt 3B
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of uneven floor at public hall, 4th story
Jul 14, 2023
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at bulkhead ceiling
Jul 14, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at east located at apt 3b, 4th story, 1st apartment from north at east
Jun 26, 2023 · Apt 3B
Open — Not complied with - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3b, 4th story, 1st apartment from north at east
Jun 26, 2023 · Apt 3B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective slopping wood subfloor in the bathroom located at apt 3b, 4th story, 1st apartment from north at east
Jun 26, 2023 · Apt 3B
Open — Not complied with - BHazardous
Repair the roof so that it will not leak at ceiling in the 2nd room from north at east located at apt 3b, 4th story, 1st apartment from north at east
Jun 26, 2023 · Apt 3B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3b, 4th story, 1st apartment from north at east
Jun 26, 2023 · Apt 3B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective marble saddle in the entrance located at apt 3b, 4th story, 1st apartment from north at east
Jun 26, 2023 · Apt 3B
Open — Not complied with - CImmediately hazardous
Properly repair with similar material the broken or defective slopping wood floor in the 1st room from north at east located at apt 3b, 4th story, 1st apartment from north at east
Jun 26, 2023 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at bulkhead door
Jun 26, 2023
Closed — Violation closed - ANon-hazardous
File with this department a registration statement for building.
Jun 26, 2023
Open — First no access to re- inspect violation - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 26, 2023
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 26, 2023
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 26, 2023
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north at east located at apt 3b, 4th story, 1st apartment from north at east
Jun 26, 2023 · Apt 3B
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed
DOB building violations · 24
- Construction other optional
Unpermtd partl demo & alt wrk @ 4stry mixd-use bldg, interor walls remv'd & undocumtd shoring in unit 2b, cracks & sagging in unit3b, roof potentially compromised. remedy: fail 2 comply w order 2 commence stabilizatn wrk undr permit commence temporary stabilization wrk under permit by 7/29/25
Jul 29, 2025
Dob violation - active - Construction other optional
Unpermtd partl demo & alt wrk @ 4stry mixd-use bldg, interior walls remv'd & undocumtd shoring in unit 2b, cracks & sagging in unit 3b, roof potentially compromised. remedy: comply w code. perform engineerng investgtn.on 3 fl & roof showing calcs,comply with bc1604.2. submit calcs by 7/29/25
Jul 17, 2025
Dob violation - active - Construction other optional
Unpermtd partl demo & alt wrk @ 4stry mixd-use bldg, interior walls re moved & undocumented shoring in unit 2b, cracks & sagging in unit 3b, roof potentially compromised. remedy: comply w code. commence tempor ary stabilization work under permit by 7/25/25
Jul 17, 2025
Dob violation - active - Construction other optional
Unperm'd partl demo & alt wrk @ 4stry mixd-use bldg, interior walls remv'd & undocumtd shoring in unit 2b, cracks & sagging in unit 3b, roof potentially compromised. remedy: fail to comply w.dob vio# 071725ce10301jt. comply w code, commence temporary stabilization work undr permt by 7/29/25
Jul 17, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 23, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 23, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2024
Dob violation - dismissed - Construction other optional
Observed structural work in progress between floors w/ temporary makeshift shoring on occupied building to secure/support floors.between 3rd&4th floors @ apt#3b observed severe slopping sagging at living room, hallways &severe cracks at ceiling, no special inspections tr1 filled. stop all work at floors 2 & 3.
Oct 16, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active
Show 14 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 23
- Class - 2
Access gained. certificate of correction not obtained for class 1 failure to maintain violation #39088705m issued 6/16/2023 for fire escape obstructed by a keyed locking device. although the device has since be
Nov 21, 2025 · Penalty $1,250
Active - Class - 2
Unable to gain access to apt 2b at 29 st. marks place. no certificate of correction on file for class 1 violation #39125316z issued 9/18/2024 for lack of required fireproofing materials between the 3rd and 4th
Nov 21, 2025 · Penalty $1,250
Active - Class - 2
Certificate of correction not obtained for violation #391275812z issued 10/16/2024 for incomplete tenant protection plan filed under job #m00933450-l1-st. although the tpp has since been corrected through subse
Nov 21, 2025 · Penalty $1,250
Resolve - Class - 2
No access. no certificate of correction on file as per commissioner's request for class 1 work without a permit violation #39127645z issued 10/16/2024 for unsafe temporary structural supports placed in apt 2b.
Nov 21, 2025 · Penalty $625
Resolve - Class - 1
Observed that the tpp file with dob.inconjunction with.job#m00933450-i1-st,doesn't provide sufficient details in regards.specific units that are.ormaybe occupied during constructionthere arenospecifications orm
Oct 16, 2024 · Penalty $1,250
Resolve - Class - 1
Atoi on a 4 story bldg,general construction /or alteration work at apt:#2b premises observed structural work in progress between floors w/ temporary make-shift shoring w/o a permit. upon reviewing. and doing a
Oct 16, 2024 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner: no fire-stopping per bc 712.3; 27-345. fire-proofing materials in apt #2b on 3rd floor have been removed (sheetrock ceilings demolished) which has created
Sep 18, 2024 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in code compliant manner. at time of inspection observed at apt 3b fire escape obstructed by keyed locking device. severe slopping at bathroom, living room. water damage with severe
Jun 16, 2023 · Penalty $1,250
Active - Class - 2
Failure to comply w/commissioner's order to file a certificate of correction for nov(#348596663) remedy: file certificate of correction.
Jan 20, 2011
Resolve - Class - 1
Occupancycontrary to that allowed by the cofo or bldg records noted:@ rear yard tanles & chains arranged for approx 50 patrons causing the eating & drinking est "bull mccabes"to exceed the 74 number of persons
Sep 12, 2010 · Penalty $2,400
Resolve
Show 13 more ↓
- Class - 1
Failure to maintain bldg in a code compliant manner,failure to provide# of required means of egress for every floor per bc 1018 & 27-366 noted:@ rear courtyard there is no 2nd means of egress for approx 20patro
Sep 12, 2010
Resolve - Class - 1
Operation of a place of assembly w/o a valid,current place of assemblycofo.noted:ground flr eating & drinking establishment d/b/a "bull mc cabe's irish pub"arranged to be occupied by more than 74 persons with
Sep 12, 2010
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. noted: at roof level of above premises, excessive construction debris observed; plywood, wood pcs, garbage bags etc. remedy: maintain adequate
Oct 21, 2009 · Penalty $4,000
Resolve - Class - 2
Failure to comply w/the commissioner order to file a certificate of correction w/dob.respondent has failed to file a certificate of correction for 34775342p walls cracked in public halls.stairs are leaning towa
Sep 10, 2009 · Penalty $4,000
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: material & debris, bags of debris at public hallway block egress at 5th flr stairs to roof bulkhead and at 3rd flr public hallway stair landing. remedy:
Jul 16, 2009 · Penalty $6,000
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. noted: material and debris piled up in public hallways at stairs to roofbulkhead & at 3rd flr public hallway stair landing. remedy: maintain
Jul 16, 2009 · Penalty $4,000
Resolve - Class - 3
Failure to maintain bldg in code-compliant manner; in that entire (bath) & plaster ceiling in front room of apt '2a' all debris on the flr. remedy:repair/replace ceiling at the above location as indicated above
Jun 30, 2009 · Penalty $200
Active - Class - 1
Failure to maintain bldg in code-compliant manner. noted: from 2nd to 4th flrs, walls are cracked in the public halls: stairs are leaning toward header and are pulling away from wall stringer: debris is
Apr 23, 2009 · Penalty $1,000
Active - Class - 2
Failure to maintain bldg walls. on inspection rear exterior wall is pulling away from facade b/w 2nd and 3rd flrs cracked in brick wall at roof level. section that pulling away may fall.
Aug 15, 2008 · Penalty $500
Active - Hazardous
Failure to maintain exterior building wall. note: at roof level parapet at west side of bldg leaning out of plumb approx 1'-0" the brick chimey brick work is missing at about 3rd and (2)nd flr approx 1'x6' open
Mar 22, 2008 · Penalty $800
Active - Non-hazardous
Failure to provide approved plans at premises at time of inspection.noted:complete removation of 2nd+3rd fl including new partitions,fl,ceilings,loft. new stairs built under permit 102706804.ceiling above 2nd f
Dec 4, 2000 · Penalty $250
Resolve - Non-hazardous
Work without a permit noted increased fence hight at front of bldg from 3to8 with metal door/gate dead bolt lock remedy remove illegal fence
Jan 2, 1996 · Penalty $1,000
Resolve - Non-hazardous
Work without a permit work nted: erected fence from 3 ft to 8ft. at front of bar with failure at three sides with iron gate and lock dead bolt. remedy: remove illegal fence and gate to legal state or obtain
Aug 17, 1992 · Penalty $1,000
Resolve
Complaints
- Water leak
Slow leak
Aug 27, 2026 · Apt 3B
Close - Electric
No lighting
Apr 24, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Dec 4, 2025 · Apt 2A
Close - Appliance
Electric/gas range
Feb 10, 2025 · Apt 3B
Close - Appliance
Electric/gas range
Jan 9, 2025 · Apt 3B
Close - Appliance
Electric/gas range
Dec 23, 2024 · Apt 3B
Close - Water leak
Damp spot
Jul 7, 2023 · Apt 3B
Close - Flooring/stairs
Floor
Jul 7, 2023 · Apt 3B
Close - Flooring/stairs
Floor
Jul 7, 2023 · Apt 3B
Close - Water leak
Heavy flow
Jun 14, 2023 · Apt 3B
Close
Show 40 more ↓
- Flooring/stairs
Floor
Jun 12, 2023 · Apt 3B
Close - Flooring/stairs
Floor
Jun 12, 2023 · Apt 3B
Close - Flooring/stairs
Floor
May 17, 2023 · Apt 3B
Close - Unsanitary condition
Pests
Nov 1, 2019 · Apt 2A
Close - Unsanitary condition
Pests
Aug 22, 2019 · Apt 2A
Close - Plumbing
Water-leaks
Oct 7, 2011 · Apt 1B
Close - Plumbing
Water-leaks
Oct 7, 2011 · Apt 1B
Close - Heating
Heat related
Dec 8, 2009 · Apt 1B
Close - Construction
Roof
Oct 1, 2009 · Apt BLDG
Close - Nonconst
Rubbish
Jul 22, 2009 · Apt 2B
Close - Nonconst
Rubbish
Jul 22, 2009 · Apt 2B
Close - Electric
Electric-supply
Jul 8, 2009 · Apt 2B
Close - Paint/plaster
Ceiling
Jul 8, 2009 · Apt 2B
Close - General
Mold
Nov 9, 2008 · Apt A
Close - Plumbing
Bathtub/shower
Nov 9, 2008 · Apt A
Close - Plumbing
Basin/sink
Apr 4, 2008 · Apt 2B
Close - Plumbing
Shower-stall
Apr 4, 2008 · Apt 2B
Close - Electric
Electric-supply
Mar 14, 2008 · Apt 2B
Close - Electric
Wiring
Mar 14, 2008 · Apt 2B
Close - General
Floor
Mar 14, 2008 · Apt 2B
Close - Plumbing
Shower-stall
Mar 14, 2008 · Apt 2B
Close - Plumbing
Radiator
Mar 14, 2008 · Apt 2B
Close - Plumbing
Water-leaks
Mar 14, 2008 · Apt 2B
Close - General
Locks
Jun 27, 2007 · Apt A
Close - Nonconst
Rubbish
Jun 12, 2007 · Apt A
Close - General
Floor
Jun 12, 2007 · Apt A
Close - Plumbing
Radiator
Jun 30, 2006 · Apt 2B
Close - Plumbing
Basin/sink
Mar 28, 2005 · Apt 2B
Close - General
Floor
Mar 28, 2005 · Apt 2B
Close - Plumbing
Bathtub/shower
Mar 28, 2005 · Apt 2B
Close - Heating
Heat related
Jan 28, 2005 · Apt 2B
Close - Heating
Heat related
Jan 9, 2005 · Apt 2B
Close - Heating
Heat related
Jan 8, 2005 · Apt 2B
Close - Electric
Lighting
Jan 7, 2005 · Apt 2B
Close - Heating
Heat related
Jan 7, 2005 · Apt 2B
Close - Plumbing
Toilet
Mar 11, 2004 · Apt 2B
Close - Electric
Electric-supply
Mar 11, 2004 · Apt 2B
Close - Paint/plaster
Wall
Mar 11, 2004 · Apt 2B
Close - General
Ceramic-tile
Dec 1, 2003 · Apt 2B
Close - Paint/plaster
Ceiling
Oct 2, 2003 · Apt 2-A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1900
- Floors
- 4
- Residential units
- 8
- Building area
- 5,704 ft²
- Lot area
- 2,934 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 464 / 45
- Assessed value
- $1,967,400
- Landmark / historic district
- No
HPD registration #128173, last renewed Aug 29, 2025.
Questions about 29 St Marks Place
Who owns 29 St Marks Place?
The owner of record in NYC Department of City Planning PLUTO data is St. Marks Properties I, LLC.
Does 29 St Marks Place have violations?
Yes. NYC HPD has recorded 39 housing violations at this property.
Is 29 St Marks Place rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 13% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 29 St Marks Place built?
City records list 1900 as the year it was built.
How many apartments are in 29 St Marks Place?
It has 8 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.