63 Cooper Square
Manhattan, NY 10003BBL 1-00463-7501Map
Owner of record: Cooper Square Condominium
63 Cooper Square is a condominium built in 1984 in Manhattan, 10003. It has 36 residential units across 6 floors. The owner of record is Cooper Square Condominium. HPD has recorded 21 housing violations here, most recently on April 1, 2021.
- HPD violations
- 21
- DOB violations
- 33
- ECB violations
- 4
- HPD complaints
- 54
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 21
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the terrace located at apt 6a, 6th story, 2nd apartment from south at west
Feb 19, 2017 · Apt 6A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 6a, 6th story, 2nd apartment from south at west
Feb 19, 2017 · Apt 6A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 6a, 6th story, 2nd apartment from south at west
Feb 19, 2017 · Apt 6A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the soffit at west and south wall in the 1st room from east located at apt 6a, 6th story, 2nd apartment from south at west
Feb 19, 2017 · Apt 6A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east ( upper level ) located at apt 6a, 6th story, 2nd apartment from south at west
Apr 29, 2016 · Apt 6A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east ( lower level ) located at apt 6a, 6th story, 2nd apartment from south at west
Apr 29, 2016 · Apt 6A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east ( lower level ) located at apt 6a, 6th story, 2nd apartment from south at west
Apr 29, 2016 · Apt 6A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st room from north at west located at apt 6a lower level, 6th story, 2nd apartment from south at west
Mar 5, 2016 · Apt 6A
Closed — Violation closed
Show 11 more ↓
- BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 6a lower level, 6th story, 2nd apartment from south at west
Mar 5, 2016 · Apt 6A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and south wall in the 1st room from north at west located at apt 6a lower level, 6th story, 2nd apartment from south at west
Mar 5, 2016 · Apt 6A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from north located at apt 6a upper level, 6th story, 2nd apartment from south at west
Mar 5, 2016 · Apt 6A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the terrace located at apt 6a upper level, 6th story, 2nd apartment from south at west
Mar 5, 2016 · Apt 6A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall in the terrace located at apt 6a upper level, 6th story, 2nd apartment from south at west
Mar 5, 2016 · Apt 6A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 6a upper level, 6th story, 2nd apartment from south at west
Mar 5, 2016 · Apt 6A
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of water penetrating over ceiling from balcony in the 2nd room from east located at apt 6a, 6th story, 2nd apartment from south at west
Sep 9, 2015 · Apt 6A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at balcony located at apt 6a, 6th story, 2nd apartment from south at west
Sep 9, 2015 · Apt 6A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 2nd room from east located at apt 6a, 6th story, 2nd apartment from south at west
Sep 9, 2015 · Apt 6A
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at wood floor (approx. 10 square feet) in the 2nd room from east located at apt 6a, 6th story, 2nd apartment from south at west
Sep 9, 2015 · Apt 6A
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 6a, 6th story, 2nd apartment from south at west
Sep 9, 2015 · Apt 6A
Closed — Violation closed
DOB building violations · 33
- Elevator elevatorrequired
E-elevator elevatorrequired
Jul 21, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 20, 2016
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 1, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 16, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 29, 2010
Dob violation - resolved
Show 23 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Nov 8, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 27, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 3, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 4
- Class - 2
At time of inspection observed el permit#m01147565 had been signed off and marked complete while there is more el work to be done. surface mounted/decorative lights still need to be installed while permit is si
Dec 13, 2024
Resolve - Class - 1
No door lock monitoring installed in controller as mandated in appendix k of the 2014 building codes; remedy install dlm . file and perform test with nyc dob, emergency phone not working. repair
Dec 5, 2022 · Penalty $1,250
Resolve - Non-hazardous
Kitchen exhaust vent terminate less than 10 ft away from a residentialwindow contrary to rs 13. 2. 2 1 y vent terminate at 1st floor rear yard remedy:provide proper termination or discontinue use of said vent
Apr 21, 2005
Resolve - Non-hazardous
Kitchen ethaust unit installed at east exterior wall first floor not properly terminated unit is less 10 ft away from residentail window contrary to reference standard 13-2-2-1-4 remedy:provide proepr terminati
Oct 13, 2004 · Penalty $200
Resolve
Complaints
- Heat/hot water
Apartment only
Dec 5, 2025 · Apt 6D
Close - Unsanitary condition
Mold
Oct 17, 2022 · Apt 3H
Close - Paint/plaster
Ceiling
Feb 14, 2017 · Apt 3A
Close - Door/window
Window frame
Feb 14, 2017 · Apt 3A
Close - Heat/hot water
Apartment only
Feb 14, 2017 · Apt 3A
Close - Paint/plaster
Wall
Feb 14, 2017 · Apt 3A
Close - Paint/plaster
Wall
Feb 14, 2017 · Apt 3A
Close - Paint/plaster
Ceiling
Feb 14, 2017 · Apt 3A
Close - Flooring/stairs
Floor
Feb 14, 2017 · Apt 3A
Close - Paint/plaster
Ceiling
Feb 14, 2017 · Apt 3A
Close
Show 40 more ↓
- Paint/plaster
Wall
Feb 14, 2017 · Apt 3A
Close - Unsanitary condition
Mold
Feb 14, 2017 · Apt 3A
Close - Flooring/stairs
Floor
Feb 14, 2017 · Apt 6A
Close - Outside building
Porch/balcony
Feb 14, 2017 · Apt 6A
Close - Unsanitary condition
Mold
Jan 27, 2017 · Apt 6A
Close - Paint/plaster
Wall
Jan 27, 2017 · Apt 6A
Close - Paint/plaster
Ceiling
Jan 27, 2017 · Apt 6A
Close - Flooring/stairs
Floor
Jan 27, 2017 · Apt 6A
Close - Door/window
Door
Jan 27, 2017 · Apt 6A
Close - Heat/hot water
Apartment only
Jan 27, 2017 · Apt 6A
Close - Door/window
Window frame
Jan 27, 2017 · Apt 6A
Close - Water leak
Slow leak
Jan 27, 2017 · Apt 6A
Close - Unsanitary condition
Mold
Mar 5, 2016 · Apt 6A
Close - Safety
Carbon monoxide detector
Mar 5, 2016 · Apt 6A
Close - Safety
Smoke detector
Mar 5, 2016 · Apt 6A
Close - Paint/plaster
Wall
Mar 1, 2016 · Apt 6A
Close - Paint/plaster
Wall
Mar 1, 2016 · Apt 6A
Close - Paint/plaster
Ceiling
Mar 1, 2016 · Apt 6A
Close - Paint/plaster
Ceiling
Mar 1, 2016 · Apt 6A
Close - Door/window
Window frame
Mar 1, 2016 · Apt 6A
Close - Water leak
Slow leak
Mar 1, 2016 · Apt 6A
Close - Water leak
Slow leak
Mar 1, 2016 · Apt 6A
Close - Unsanitary condition
Mold
Mar 1, 2016 · Apt 6A
Close - Paint/plaster
Wall
Dec 1, 2015 · Apt 6A
Close - Outside building
Roofing
Dec 1, 2015 · Apt 6A
Close - Unsanitary condition
Mold
Dec 1, 2015 · Apt 6A
Close - Water leak
Heavy flow
Jul 14, 2015 · Apt 6A
Close - Unsanitary condition
Mold
Jul 14, 2015 · Apt 6A
Close - Unsanitary condition
Mold
Jul 14, 2015 · Apt 6A
Close - Flooring/stairs
Floor
Jul 14, 2015 · Apt 6A
Close - Paint/plaster
Wall
Jul 14, 2015 · Apt 6A
Close - Water leak
Heavy flow
Jul 14, 2015 · Apt 6A
Close - Heating
Heat related
Jan 19, 2010 · Apt 3H
Close - Heating
Heat related
Oct 24, 2008 · Apt 6A
Close - Heating
Heat related
Oct 24, 2008 · Apt 6A
Close - Heating
Heat related
Oct 24, 2008 · Apt 6A
Close - Heating
Heat related
Oct 24, 2008 · Apt 6A
Close - Plumbing
Sewer
Oct 24, 2008 · Apt 6A
Close - Heating
Heat related
Oct 23, 2008 · Apt 6A
Close - Plumbing
Basin/sink
Oct 23, 2008 · Apt 6A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1984
- Floors
- 6
- Residential units
- 36
- Building area
- 30,340 ft²
- Lot area
- 5,075 ft²
- Zoning
- C6-1
- Community board
- 103
- Council district
- 2
- Block / lot
- 463 / 7501
- Assessed value
- $5,033,698
- Landmark / historic district
- No
HPD registration #140332, last renewed Sep 19, 2025.
Questions about 63 Cooper Square
Who owns 63 Cooper Square?
The owner of record in NYC Department of City Planning PLUTO data is Cooper Square Condominium.
Does 63 Cooper Square have violations?
Yes. NYC HPD has recorded 21 housing violations at this property.
Is 63 Cooper Square rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 63 Cooper Square built?
City records list 1984 as the year it was built.
How many apartments are in 63 Cooper Square?
It has 36 residential units and 39 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.